Presentation is loading. Please wait.

Presentation is loading. Please wait.

ISO 17078 Task Group Update Wayne Mabry.

Similar presentations


Presentation on theme: "ISO 17078 Task Group Update Wayne Mabry."— Presentation transcript:

1 ISO Task Group Update Wayne Mabry

2 Introduction Comparison of ISO to API gas lift standards
Status of ISO standard in process 2 wjm

3 Comparison of ISO to API
3 wjm

4 Status of ISO 17078.1 17078.1 (mandrels)
Released to FDIS (Final draft international standard) Must incorporate editorial changes from work group 4. Projected completion March 2004 Send out for up or down vote by member nations. If approved, standard available in 1 to 1-1/2 years. 4 wjm

5 Status of ISO 17078.2 17078.2 (flow control devices)
Released to CD (Committee draft) Incorporate editorial changes from work group 4. Projected completion March 2004 Review by work group 4 Incorporate wg4 comments 5 wjm

6 Status of ISO 17078.2 (continued)
(flow control devices) Release to DIS (draft international standard) Send out for comments Review and incorporate comments Released to FDIS (Final draft international standard) Send out for up or down vote by member nations. If approved, standard available in 2 to 2-1/2 years. 6 wjm

7 Status of ISO 17078.3 and 17078.4 17078.3 (down hole equipment)
Working document (WD) Work just beginning (est completion – 2-1/2 to 3 years) (reconditioning and other topics) Work just beginning (est completion – 3 to 3-1/2 years) 7 wjm


Download ppt "ISO 17078 Task Group Update Wayne Mabry."

Similar presentations


Ads by Google