1 API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: John Helge Olsen Statoil Jun, 2017 Subcommittee 19

2 Task Group API 19 CI Group Name: Chemical Injection Devices For Downhole Applications Chair: John Helge Olsen Scope: Requirements for chemical Injection devices intended for use in the petroleum and natural gas industry. Requirements for specifying, selecting, designing, manufacturing, quality-control, testing and preparation for shipping, performance testing and calibration procedures. Status: 15’th Committee meeting scheduled August 8-16’th 2017 at API Office in Washington DC Jun, 2017 Subcommittee 19

3 Task Group API 19 CI Meetings in to date: 15 Date Manufacturers
Consultants Operator/User API Staff Total Number Aug 25, 2014 16 4 1 21 Nov 11, 2014 15 20 Feb 3, 2015 8 5 Apr 21, 2015 10 2 7 19 Jul 07, 2015 Oct 06, 2015 9 11 Feb 02, 2016 Apr 26, 2016 12 Aug 9, 2016 Oct 28, 2016 14 Jan 26, 2017 17 Mar 14, 2017 3 May 15, 2017 13 Jan, 2017 Subcommittee 19

4 Task Group API 19 CI Meetings plan for 2017 Plans of meetings
Dates 2017/2018 Task Meeting Host /location June 24, 2017 Update mtg QFX, Aberdeen Scotland Aug 8-16, 2017 Task Group prepare for Ballot, Document Read through. API, Washington D.C. Aug 30, 2017 McCalvin Enterprises, Stafford Tx Oct 17-20, 2017 Task Group prepare for Ballot, Document Read through for ballot to API. Weatherford, Houston TX Jan 29-31, 2018 Comment resolution Mar 20-22, 2018 TBA TBD Jun 2017 Subcommittee 19

5 Task Group API 19 CI SC Liaison: David McCalvin
Status: Drafting document, approx % complete Focus of change: New Specification Chair: Have had good progress in 2017 with ballot in Nov 2017 as main focus. Positive and increasing involvement from European members. SC Liaison: David McCalvin Ballot likely late 2017 Jun, 2017 Subcommittee 19

6 Sections 1 Scope 2 Normative References 3 Definitions
4 Abbreviations and Symbols 5 Functional Specifications 6 Technical Specifications 6.1 General Requirements 6.2 Product Types 6.3 Design Criteria 6.4 Materials 6.5 Verification 6.6 Design Changes 6.7 Design Validation 6.8 Additional Validation Testing 6.9 Special Features Validation 6.10 Scaling of Validated Designs 6.11 Functional Testing 6.12 Retrievable Design Requirements 7 Manufacturing Jun, 2017 Subcommittee 19

7 Annexes Annex A – Informative - API Monogram Program
Annex B - (normative) - Reverse Flow Prevention Validation and Functional Testing Annex C - (normative) - Back Pressure Retention Design, Validation and Functional Testing Annex D - (normative) - Single Use Pressure Retaining Device Validation and Functional Testing Annex E - (normative) - Secondary Chemical Injection Screen Design, Validation and Functional Testing Annex F - (informative) - Retrievable Chemical Injection Device Design, Interface and Compatibility Annex G - (normative) - Flow and Pressure Control Products Design, Validation and Functional Testing Annex H - (normative) - Combination of Multiple Features in a Single Device Jun, 2017 Subcommittee 19

8 Questions or Comments? Jun, 2017 Subcommittee 19