Presentation is loading. Please wait.

Presentation is loading. Please wait.

SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.

Similar presentations


Presentation on theme: "SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion."— Presentation transcript:

1 SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion Accessories, Liner Hangers, Test tools, Chemical injection systems. 26 standards in revision / newly created, 4 published, 4 SR3s submitted Completion Equipment Documents – 14 A – SCSSVs - recently published 14 B – SSSV installation – ballot complete in resolution – publish Q2 2015 14 L – SR3 submitted for next revision – HPHT requirements + updating 11 D1 – Packers and Bridge Plugs – Published 19 AC – Completion Accessories – adopt-back of ISO 14998 – ballot passed comment resolutions ongoing publish in Q3 2015, SR 3 on HPHT annex 19 SS – Sand Screens – adopt-back of ISO 17824 – ballot in Q3 2015 19 LH – Liner Hangers – in process – estimate pre-ballot Q4 2015 19 TT1 – Downhole Well Test Tools – ballot passed in comment resolution 19 V –Barrier valves- Published, TG inactive until review in 2016 19 OH – Openhole Isolation Equip. – New- draft at 30%, ballot Q2 2016 19 CI – Chemical Injection Valves – New- draft at 15%, ballot date not set

2 SC 19 report to SC 18 June 2015 Gas-Lift Equipment Documents – Gas-Lift Handbook – replaces 7+ RPs – plan to publish in Early 2017 19 G1 – Side-pocket mandrels – SR3 was approved, TG assessing scope 19 G2 – Flow control devices – Ballot comment review underway, extensive 19 G3 – Run/pull/KOT/latches for SPM flow controllers, published 19 G4 – Practices used with SPM equipment, published 19 G5 – Operations Maintenance of GL - SR3 was approved, work progressing 19 G6 – Design of installations using IPO valves – 97% complete – initial ballot Q3 2014 19G9 - Design and Operation of Intermittent Gas-lift – Review 90% complete, ballot Q2 2015 19 G10 – Dual gas-lift systems, comment resolutions underway 19G11 – Dynamic Simulation of Gas-Lift Wells and Systems –failed ballot, resolving comments 19G12 – Gas-lift Automation – 30% Complete ongoing, ballot Q3 1015 19 G13– HP Gas-lift – 20% on hold 19 G14 – Liquid unloading of gas wells –05% on hold

3 SC19 report to SC18 June 2015 Perforating Documents – 19B – Perforators – Revising by section 19B1 – Evaluation in Concrete Targets – Ready for ballot 19B2 – Evaluation under stress – Released 19B3 – Evaluation at temperature – In Process 19B4 – Evaluation of Flow Performance – Revision complete 19B5 – Debris Evaluation – Draft complete 19B6 -- Gun Swell – Ready to publish RP67 – Explosive Safety – revising entire document (just beginning, divided in 11 Task Groups) Two SR3 documents approved at SC19 for CSOEM funding of testing, 2015 50k 2016 150k, to help establish accurate explosive hold times at elevated temperatures. SC 19 approved two SR3s for thermal decomposition testing of charges presented to CSOEM


Download ppt "SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion."

Similar presentations


Ads by Google