Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 26 th, 2014 Salt Lake City, UT.

Slides:



Advertisements
Similar presentations
Standards Review Subcommittee Update April 30, 2013.
Advertisements

WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Standards Development and Approval Process Steve Rueckert Director of Standards Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake.
Operating Committee Report Technical Operations Subcommittee Al Badella June 10-11, 2010.
Frequency Responsive Reserve Process Update
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the MIC March 2013 Salt Lake City, UT.
WECC Operating Committee Request for Discussion and Guidance MOD-001-WECC-RBP-0 Reliability Data Exchange (MOD) October 24, 2013.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
INT-008-WECC-RBP-2 Mike Pfeister Salt River Project Joint Session January 10, 2013.
NERC Orientation Joint Guidance Committee WECC Leadership
WECC-0074 Power Flow Base Case and Dynamic Stability Data Prep Procedure W. Shannon Black Manager, Business Practices and Standards Processes November.
Operating Committee Chair Report Ed Hulls October 21-22, 2010 WECC Operating Committee.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Western Electricity Coordinating Council Market Issues Subcommittee Report to the Market Interface Committee Philip Tice October 30-31, 2008.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Brian Theaker RCWG Chair
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
WECC Member Advisory Committee WECC Standards Committee Request for Guidance Governor Droop October 16, 2013.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Andrew Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report Oct 24th, 2013 Anaheim, CA.
WECC-0100 Drafting Team Orientation TPL-001-WECC-RBP-2.1 System Performance Drafting Team Meeting.
W. Shannon Black Manager, Standards Processes Results Based Drafting 2013.
WECC Operating Committee Operations Training Subcommittee Report Bill Simmons, OTS Chair March 25, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 25,26 th, 2015 Salt Lake City, UT.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee RASRS Report to Operating Committee October 8-9, 2014 Salt Lake City, Utah.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
JJ Jamieson MIC Chair JGC update September 2014 Salt Lake City.
Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT.
Andy Meyers Bonneville Power Administration Operating Committee Update ISAS April 2015 Salt Lake City, UT.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report Oct 13th, 2015 Salt Lake City, UT.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
The TNI National Environmental Laboratory Accreditation Board Update Daniel Hickman, NELAP Board Chair.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Andy Meyers ISAS Chair OC Report ISAS Subcommittee August 2015 Salt Lake City, UT.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
RASRS Report to Operating Committee March 21, 2017
WECC MAC Committee Update
Steve Rueckert – Director of Standards
Reliability Assessment Committee Proposal TSS Meeting
WECC Regional Standards Update
Kenneth Silver Los Angeles Department of Water & Power
Chris Albrecht Legal Counsel
Kenneth Silver Los Angeles Department of Water & Power
Merrill Brimhall – Engineer, Staff
Anitha Neve Operations and Interchange Specialist
OC Report ISAS Subcommittee August 2015 Salt Lake City, UT
Anitha Neve Operations and Interchange Specialist
Randy Spacek AvistaCorp, RWG chair
Steve Rueckert – Director of Standards
Western Electricity Coordinating Council
Steve Rueckert Director of Standards WSC Meeting Overview
Kenneth Silver Los Angeles Department of Water & Power
Chris Albrecht Legal Counsel
Standards Development Process
CV-SALTS Beneficial Use and Objective Study
Standards Review Subcommittee Update
Presentation transcript:

Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 26 th, 2014 Salt Lake City, UT.

2 Telecommunications (TELWG) Telecommunications Workgroup is evaluating performance and reliability problems with the Intertie 137 hotline circuit as well as evaluating potential solutions. CAISO is coordinating requirements and funding solutions among the members. Telecommunications Workgroup reviewed and approved the proposed “Voting Procedures for the TOS and all Reporting Sub-Groups” document with one minor change.. Work Group Activities

3 Telecommunications Workgroup reviewed and approved a revised charter. Telecommunications Workgroup was asked by the RASRS if they would be willing to make a presentation on telecommunications technology changes in the utility industry at the July 2014 RASRS meeting. Telecommunications Workgroup reviewed the COM-001- WECC-RBP-1 document and agreed that it would remain as a regional business practice. Telecommunications Workgroup next meeting is scheduled for July 17 and 18 in Lakewood, CO. Work Group Activities

4 Relay Work Group(RWG) Relay Workgroup is in the process of identifying all documents revised over 5 years old for review and updating. The Relay Workgroup received approval from the BOD for closed session and updated the Charter accordingly. Work Group Activities

5 The Relay Workgroup will begin a review, and analysis and trending pertaining to the misoperation data reported under PRC-003-WECC-CRT-1 for 2012 in upcoming April meeting. Relay Workgroup will be meeting in April in Salt Lake City. Work Group Activities

6 Control (CWG ) The CWG has received a copy of the TSS Study on the effect of PSS in the Western Interconnect. The CWG determined that based on the study, the CWG recommended to the WSC that the Project WECC-0099 be retired and new SAR developed. On February 11, 2014, the WECC Standards Committee (WSC) approved Standard Authorization Request WECC-0107 Power System Stabilizer (PSS) Design and Performance. This SAR will develop PSS related materials into a WECC Regional Reliability Standard (RRS). Workgroup Activities

7 This SAR is an iterative step following the completion of WECC-0099 Power System Stabilizer Design in which the drafting team was assigned to review various documents to determine whether a RRS addressing the reviewed substance should be drafted. WECC-0099 has been retired and the project site has been archived. A new drafting team for the WECC-0107 SAR includes the CWG members who participated on WECC-0099 drafting. The Project is being coordinated with Shannon Black. Substation Workgroup (SSWG) Substation Workgroup held its annual meeting on May 6, 7 & 8 th in Salt Lake City. Work Group Activities

Questions