Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT.

Similar presentations


Presentation on theme: "Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT."— Presentation transcript:

1 Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT

2 2 Update o At the April 9 th meeting two comments were received from Posting 3 and discussed by the team. o BPA was the only respondent to comment to Posting 3. o The Drafting Team agreed with BPA that the language in Requirement WR2, Section 2 regarding timing should be clarified. Section 2 was changed to read: After the operating hour. Drafting Team WECC-0108 INT-021

3 3 o The DT did not agree with the second proposed change that clarification was needed to Requirement WR2, Section 1 to address Dynamic Transfers. o As a result no change was made to this requirement as the information is already addressed in INT-008-WECC- CRT-2.1, Dynamic Transfer, Requirement WR5. Update Continued

4 4 May 18 th, 2015 2 p.m. to 4 p.m. MDT Webinar o Comment period is from April 13 th through May 13 th, 2015 for Posting 4. o Review the comments received during Version 4 30- day posting. o If no comments are received forward to the WSC with a request for ballot at their May 19 th meeting. Next Meeting

5 5 If comments are received: o Hold a future webinar to discuss proposals for Posting 4 after the 30 day comment period closes. Next steps

6 Questions? Robert Sullivan– California ISO (rsullivan@caiso.com)rsullivan@caiso.com