LCLS Undulator System Production Management

Slides:



Advertisements
Similar presentations
Order Inquiry and Change Order eCommerce Enhancements An Overview to eCommerce Enhancements March 2012.
Advertisements

Publication Module using back end interface. Institution Data Entry Add Documents. Edit/Delete Documents that are added but not yet sent to Institution.
Welcome to eDMR This PowerPoint presentation is designed to show eDMR users how to login and begin using the eDMR system.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Marion White Magnets & Supports April 16, 2007 Undulator Magnets and Supports Status.
Page: 1 Version.8 July 2006 Lesson 4: Receiving Process.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2006 Microsoft Corporation.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Search Empower Engage Send Print Co-Brand With BusinessBuilder.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Online Admissions Tour When each slide comes to an end ‘Next’ will appear at the bottom right of the screen, please left click your mouse to move onto.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Trinity Logistics A Transportation Management Company.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
Adding, editing, and deleting items using CONTENTdm Administration.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
ERP/QMS by PMI Aerospace ERP/QMS by PMI Aerospace
Training Guide for Residents
SCC P2P – Collaboration Made Easy Contract Management training
PMI Returns Management Process
Standard Operating Procedure
P2P Module: Ariba P2P REQUISITION AND APPROVAL
To the ETS – PNG Continuation: Online Training Course
To the ETS – Agreement Management Online Training Course
Return Shipment Manifest
SUBMITTING A PAYMENT REQUEST FORM
I-Supplier Training Guide
LTU/Undulator Installation Status
LCLS Undulator System Detailed Report
Scheduling Agreements
Linac Coherent Light Source Procurement
Undulator Scope, Management, and Organization
To the ETS – Agreement Management Online Training Course
e-Beams Systems Update
Injector / Linac Installation Current Status
Undulator Controls Breakout
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Status
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Vacuum System Plans (July 07)
LCLS Undulator System Status and Schedule
Undulator Integration Test Status
Electron Beam Systems ETC and Methodology
LCLS Undulator System Detailed Report
Undulator Assembly and Installation Planning
Undulator and Magnet Production Status 25 October 2006
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Undulator Controls Status
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS Undulator Scope, Management, Organization
LCLS e- Beams Systems Manager
Presentation transcript:

LCLS Undulator System Production Management 5/8/2019 LCLS Undulator System Production Management Lehman Review July 10th-12th 2007 1 Test

Undulator System Production - Argonne WBS Responsibility 5/8/2019 Undulator System Production - Argonne WBS Responsibility 1.4.2 Controls 1.4.3 Magnets & Supports 1.4.4 Vacuum Systems 1.4.5 Diagnostics 2 Test

Working Schedule for Production http://www.lcls.aps.anl.gov/Project_Page/index.html 3

Component Delivery Schedule – 7/10/07 5/8/2019 Component Delivery Schedule – 7/10/07 Actual Plan 4 Test

Controls Production Plan Populated Undulator Rack 11/12/07 3/10/08 (35) Intra Undulator Cables 8/6/07 8/6/07 (35) Electronics Interface Assembly 10/27/07 10/29/07 (35) Tunnel Cabling ( To be ordered by SLAC) 12/19/07 12/21/07 Quad Cables 12/19/07 12/19/07 (35) BPM Cables 12/19/07 12/19/07 (35) Network Cables 12/21/07 12/21/07 (35) Service Building Components (SLAC) 10/1/07 12/14/07 Install service building racks 10/1/07 12/14/07 (20?) Software 3/21/08 3/21/08 Undulator Controls Software 3/21/08 3/21/08

1.4.2. Controls: Latest Working Schedule (closely agrees with plan) Undulator Control Module FDR July,2007 (will slip) Award Blade IOC contract August, 2007 Award First article UCMI November, 2007 Receive final UCMI February, 2008 Populated racks ready for ship to SLAC March, 2008 Intra-undulator cable contract Award contract July, 2007 Receive final shipment September, 2007 Electronics Interface Assembly Receive final delivery September, 2007 Software Support Motion and System monitoring March 2008 SLAC Installation Begins March 2008

39 Production Undulator Assemblies at SLAC 1 Production Undulator Assembly at Argonne Production Undulators Delivered to SLAC SN #2 ,#4, #6, #8, #10, #12, #14 11/3/06 11/3/06 (6) SN #2 6/9/06 6/9/06 (1) SN# 3,#7,#11,#13,#17,#19 8/18/06 8/18/06 (6) SN# 9,#15,#21, #23, #25, #27, #32 3/30/07 3/30/07 (7) SN# 5,#34,#38, #40 6/1/07 6/1/07 (6) SN# TBD 6/19/07 6/19/07 (7) Production Undulators to be Delivered to SLAC SN# TBD Week of: 7/9/07 7/9/07 (6)

Support Mover First Articles and Production Award Contract (38) 5/18/07 5/18/07 MW/ET QA Documents (4) 7/20/07 7/20/07 1st article acceptance at vendor (4) Fixed Support & Girder QA documents complete (4) 7/27/07 7/27/07 Ship 1st article to ANL(1) Fixed Support & Girder 7/30/07 7/30/07 Ship 1st article to SLAC (3) Fixed Support & Girder 7/31/07 7/31/07 SLAC acceptance of 1st article and notification (3) 8/6/07 8/6/07 Production units received at SLAC (4) 8/17/07 8/17/07 Production units received at SLAC (4) 9/10/07 9/10/07 Production units received at SLAC (4) 9/28/07 9/28/07 Production units received at SLAC (4) 10/15/07 0/15/07 Production units received at SLAC (4) 11/2/07 11/2/07 Production units received at SLAC (4) 11/19/07 1/19/07 Production units received at SLAC (4) 12/4/07 12/4/07 Production units received at SLAC (4) 12/21/07 2/21/07 Production units received at SLAC (2) 1/7/08 1/7/08

Quad Magnet Production (+2 weeks) Quadrupole Magnets (37) 5/1/07 12/31/07 Vendor Fab./Assy-Quad Mag. Article (Q1) 5/1/07 5/23/07 (held in customs, 2 weeks late) ANL Test 1st Article Q1 6/14/07 6/27/07 (Test to be finished 7/13/07) Ship to SLAC Quad Mag1st Article(Q1) 6/28/07 6/28/07 (1) (+2 weeks) ANL Test 2ndt Article Q2 6/28/07 10/8/07 (1) Ship to SLAC Quad Mag (Q2) 10/9/07 10/9/07 (1) Ship to SLAC Quad Mag (Q3, Q4) 8/6/07 8/6/07 (2) Ship to SLAC-Quad Mag (Q5) 8/20/07 8/20/07 (1) Ship to SLAC-Quad Mag (Q6,Q7) 9/3/07 9/3/07 (2) Ship to SLAC Quad Mag (Q8,Q9) 9/17/07 9/17/07 (2) Ship to SLAC Quad Mag (Q10,Q11) 10/1/07 10/1/07 (2) Ship to SLAC Quad Mag (Q12-13-14-15) 10/15/07 10/15/07 (4) Ship to SLAC Quad Mag (Q16-17-18-19) 10/29/07 10/29/07 (4) Ship to SLAC Quad Mag (Q20-21-22-23) 11/12/07 11/12/07 (4) Ship to SLAC Quad Mag (Q24-25-26-27) 11/26/07 11/26/07 (4) Ship to SLAC Quad Mag (Q28-29-30-31) 12/10/07 12/10/07 (4) Ship to SLAC Quad Mag (Q32-33-34-35) 12/24/07 12/24/07 (4) Ship to SLAC Quad Mag (Q36-37) 12/31/07 12/31/07 (2) (mid-January, 1/08) Quadrupole Stages & Stands 5/1/07 10/11/07 Vendor Fab/Assy-Stages, Stands, etc.. 5/1/07 10/4/07 (38) Vendor Ship-Stages, Stands, etc..to SLAC 10/5/07 10/11/07

LCLS Undulator Quadrupole First Article

Vacuum System Chamber Production Magnetic measurements of a short section of Stainless Steel Chamber in an Undulator - Permeability effects are much higher than expected Too much risk with too many difficult questions to answer Is a uniform 8 gauss OK? What are the issues with the end field? What is the variability in the permeability/material inconsistencies along a full chamber? What's the variability chamber to chamber?

Vacuum System Chamber Production AL Extrusion Production Schedule Estimate V’s Existing SS Vac Chamber Schedule SS Vacuum Chamber Lot (A ) 10/26/07 12/26/07 (4) Ship to SLAC 1/2/08 AL Vacuum Chamber Lot (A ) (5) Ship to SLAC 1/10/08 SS Vacuum Chamber Lot (B ) 11/28/07 1/07/08 (7) Ship to SLAC 1/14/08 AL Vacuum Chamber Lot (B ) (5) Ship to SLAC 1/21/08 SS Vacuum Chamber Lot (C ) 1/02/08 1/31/08 (7) Ship to SLAC 2/7/08 AL Vacuum Chamber Lot (C) (12) Ship to SLAC 2/19/08 SS Vacuum Chamber Lot (D) 1/31/08 3/03/08 (7) Ship to SLAC 3/11/08 AL Vacuum Chamber Lot (D ) (12) Ship to SLAC 3/26/08 34 Available SS Vacuum Chamber Lot (E) 3/03/08 3/31/08 (8) Ship to SLAC 4/2/08 33 Available AL Vacuum Chamber Lot (E ) (12) Ship to SLAC 4/16/08 AL Spares SS Vacuum Chamber Lot (S) 3/19/08 4/09/08 (4) Ship to SLAC 4/16/08 SS Spares

Vacuum System Component Production Beam-line Bellows Module assembly Bellows #1 Ship to SLAC 11/8/07 11/14/07 (4) Bellows #2 Ship to SLAC 11/14/07 11/20/07 (21) Bellows #3 Ship to SLAC 1/23/08 1/29/08 (15) Short Diagnostic Break Assembly Quad Spool 10/30/07 11/20/07 (34) LongDiagnostic Break Assembly Vacuum Spool (1pc) 10/30/07 11/20/07 Vacuum Spool (2pc) 10/30/07 11/20/07 Support System for Vac. Chamber Pumps & Gauges

Diagnostics Production RFBPM – Working Schedule LTU Development 5/1/07 6/29/07 (3) LTU RFBPM Production 2/12/08 2/12/08 (2) RFBPM #1 3/4/08 3/4/08 (11) RFBPM #2 3/25/08 3/25/08 (11) RFBPM #3 4/15/08 4/15/08 (12) Latest Revised schedule: Production of 2 BPMs for LTU 10/07 Production of 6 BPMs for undulator 10/07 Production of 10 BPMs for undulator 12/07 Production of 11 BPMs for undulator 01/09 Production of 7 BPMs for undulator 02/08 Spares 4 BPMs 02/08

Production Diagnostics Beam Finder Wire Beam Finder Wire #1 at SLAC 10/8/07 3/7/08 (3) Beam Finder Wire #2 at SLAC 1/3/08 1/3/08 (10) Beam Finder Wire #3 at SLAC 1/18/08 1/18/08 (10) Beam Finder Wire #4 at SLAC 3/13/08 3/13/08 (14) Radiation Detection Monitor Beam Loss Monitor (On Hold)

ASK System – accessing system http://www.lcls.aps.anl.gov Click on “Project Pages” to find the ASK System

In the “Project Pages” screen, click on “ANL ASK System” ASK System – accessing system In the “Project Pages” screen, click on “ANL ASK System”

To access ASK, click on this link ASK System – accessing system To access ASK, click on this link

Example: to access magnet and support information, click on this link. ASK System – accessing system Example: to access magnet and support information, click on this link.

ASK System – accessing system Example: this brings up the components of the support/motion system assembly. Click on these links to bring up information on each

Each component of the menu can be selected and viewed ASK System – accessing system Each component of the menu can be selected and viewed

Example: Bill of materials can be accessed

Example: Shipping and procurement information can be accessed

Example: Drawing lists can be accessed

Example: Assembly procedures, statement of works, and engineering specification designs can be accessed

Click on this link to ENTER information in the ASK System ASK System – entering information Click on this link to ENTER information in the ASK System

ASK System – entering information Enlarged menu for Magnets and Support – click on any one of these to start entering information in the appropriate section

Click on this link to upload information ASK System – entering information Click on this link to upload information All information that has already been entered for BOMs, SOWs, ESDs, drawing lists, bills of lading, and procurement/shipping information is shown

ASK System – entering information Can enter information for BOMs, SOWs, ESDs, drawing lists, bills of lading by browsing for the file and using the pull-down menu

ASK System – entering information Can enter shipping numbers and requisition numbers by clicking on ‘edit.”. Once these numbers are entered, the latest information is pulled and updated automatically from Argonne’s shipping/procurement system. In the ASK report, there is a section for SLAC to enter arrival information such as that shown on the next slide

Anything SLAC needs to enter is highlighted in yellow ASK System – entering information Anything SLAC needs to enter is highlighted in yellow PO 54628 Line item 1 Added to manifest Downloaded by SLAC Property Transfer Status Actual arrival date SLAC recipient

Thanks

TO ADD SHIPPING OR REQUISITION NUMBERS In the ASK Administration page, click on “Undulator Assembly.” Scroll to the bottom of the screen and click on “Edit” In the “Shipping Order Numbers” column, enter these two numbers as an example: “00337335” and “00338461” [note: each number should take up its own box] Click on the “Save” button located at the bottom of the “Shipping Order Numbers” column Close the Window The shipping numbers should now show up in both the “Undulator Assembly” page and in the ASK report   TO DELETE SHIPPING OR REQUISITION NUMBERS Go to the “Undulator Assembly” page in the Administration window Click on “Edit” Check the “Delete” box next to each number you want to rid of Close the window All information associated with these numbers should now be gone LAURA’S OFFICE NUMBER:  2-6428 LAURA’S CELL NUMER: 630-532-8537