Project proposal for OHSAS 18001:2007 implementation

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

HEALTH AND SAFETY MANAGEMENT SYSTEMS Health and Safety Management Systems and Certification Vicki Gomersall.
NCS International The ABC‘s of Safety Management Systems – A Simplified Approach Presenter: Ian Ackland BE MBA FIEAust MEIANZ MSIA.
Risk & Safety Presentation January 8, 2013 Bryan Sabari, CUSP Manager Corporate Safety
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Project plan for ITIL implementation
Health and Safety Risk Assessment (RA) End presentation Risk Assessment (RA)
QUALITY, ENVIRONMENTAL AND OCCUPATIONAL HEALTH AND SAFETY POLICY.
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
Project plan for ISO implementation Subtitle or presenter.
1 Introducing BSI Health & Safety Self-assessment Online.
USC Health and Safety Supervisor Training November 24 th and 25 th, 2011 Health & Safety Refresher PART 3.
O UR S ERVICES W e help for subsides for different quality standards from STATE & CENTRAL GOVT.  Quality Up gradation System Subsidy  5% Interest.
Key changes and transition process
Key changes from OHSAS 18001:1999
Implementation of ISO 14001/OHSAS TMS Consultancy Ltd.
Occupational Health and Safety
Basics of OHSAS Occupational Health & Safety Management System
What is it? Why it is so important?
Kay Higby Responsible Care Superintendent ISO Management Representative Akzo Nobel Functional Chemicals, LLC.
INTRODUCTION TO OHS MANAGEMENT SYSTEM STANDARDS
Project proposal for ISO :2011 implementation Subtitle or presenter.
BG Institute Work and Health Occupational Health Conference/Oman Semper Opera, DresdenBGAG Improving poor OSH by a Safety Management System Dr. Thomas.
Dr. Thomas Kohstall HVBG BG Institute Work and Health 1 Semper Opera, DresdenBGAG Safety Management System in a Total Management Dr. Thomas Kohstall,
Project proposal for ITIL implementation Subtitle or presenter.
ANZI/AIHA Z Occupational Health and Safety Management Systems.
Hazards Identification and Risk Assessment
FleetBoston Financial HIPAA Privacy Compliance Agnes Bundy Scanlan Managing Director and Chief Privacy Officer FleetBoston Financial.
Certification of working conditions in the workplaces Certification of working conditions in the workplaces
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
Visit us at E mail: Tele:
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Working to Raise the Bar in the Quality, Professionalism and Value of Integration Services.
1 Dr Małgorzata P ę ciłło Central Institute for Labour Protection – National Research Institute ul. Czerniakowska 16, Warsaw, Poland
Adding value through health and safety. Introduction to Portakabin Part of the Shepherd Group - a family company with family values Cares for employees;
Developing Your International Risk Management Action Plan The Action Planning Process & Template.
Occupational Safety & Health: Management System (OSH-MS)
What is ISO? ISO is that the world’s largest developer of voluntary International Standards. International Standards provide state of the art specifications.
UNDERSTANDING ISO 9001:2008.
Consultancy expertise for ISO design and implementation
GCSE Business Studies Unit 3 Planning a Business
Chapter 4 Internal Controls McGraw-Hill/Irwin
Monitoring, Review and Audit of OHS&E
Project proposal for ISO 27001:2013 implementation
Accreditation Update Regional Municipality of Durham March 15, 2018.
Project plan for ISO 14001:2015 implementation
WACS Audit ISO Certificate’s
GA Flight Examiners Seminar
Lockheed Martin Canada’s SMB Mentoring Program
Roadmap to COR.
Fifalde Blueprint for Success
Developing & implementing business strategy
Project proposal for ISO 14001:2004 implementation
Project plan for ISO 9001 implementation
SAFETY AND HEALTH IN PROCESS INDUSTRIES
Project proposal for ISO 9001:2008 implementation
Quick Facts Health & Safety Management
Project proposal for ISO 14001:2015 implementation
ISO 9001.
Insuring Your Life.
30/06/2019 Managing health and safety using BS OHSAS Minimizing your health and safety risks Good morning my name is Suzanne Fribbins, and I am.
Kay Higby Responsible Care Superintendent ISO Management Representative Akzo Nobel Functional Chemicals, LLC.
System Safety Regulation
© TYL Consultancy Service, All right reserved. Reg :NS V TYL Consultancy Services ( Reg :NS V )
RISK MANAGEMENT CENTER
Risk Management NDS Forum June 23rd 2010.
PRESENTATION TO PORTFOLIO COMMITTEE ON DMR 2010/ 11 ANNUAL REPORT
START THE MIGRATION PROCESS TO ISO 45001:2018
ISO 45001:2018 The importance of a Safety Management System
Presentation transcript:

Project proposal for OHSAS 18001:2007 implementation Subtitle or presenter

Copyright ©2015 18001Academy. All rights reserved. Content Reasons for implementation Purpose of the project Milestones Resources Deliverables 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.

Reasons for implementation (1/2) Primary reasons: Improve public/community relations, image and credibility by attaining certification to OHSAS 18001 Reducing incidents leading to liability, leading to reducing insurance premiums Improve decisions by basing them on data from the occupational health & safety management system 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.

Reasons for implementation (2/2) Secondary reasons: Create a culture of continual improvement of the processes Improve employee engagement towards process improvement 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.

Purpose of the project (1/2) What do we want to achieve? Gain OHSAS 18001 certification Ensure compliance to legal and other requirements Ensure control of process hazards that cause risks of occupational health & safety incidents Increase community relations, image and market share of [organization name] 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.

Purpose of the project (2/2) What do we want to achieve? Better management of processes, activities and functions Reduce costs through reduction of accidents and insurance premiums resulting from enhancements identified through continual improvements attained through the OHSAS 18001 occupational health & safety management system 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.

Copyright ©2015 18001Academy. All rights reserved. Milestones Milestone Due date Initiation Planning Assessment Implementation Internal Audit Management Review Corrective Actions Certification Audit Continual Improvement Setup 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.

Copyright ©2015 18001Academy. All rights reserved. Resources (1/2) Human resources Internal resources – [list internal resources e.g. group name] External resources – [list external resources, e.g. consulting company] Technical resources Tool – [Tool name] Equipment – [list equipment needed] 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.

Copyright ©2015 18001Academy. All rights reserved. Resources (2/2) Financial resources Amount: [define amount of money needed to finish the project] Cost types: [split costs according to the cost type and include all resources listed here, e.g. human resources – internal and external, technical and other resources] Other resources Documentation 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.

Copyright ©2015 18001Academy. All rights reserved. Deliverables OH&SMS General requirements & related documents Definition of legal requirements and occupational health & safety hazards of processes Measurement, analysis and improvement processes 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.

Project proposal for OHSAS 18001 implementation Presenter’s name 4/5/2019 Copyright ©2015 18001Academy. All rights reserved.