2016 Exploration & Production Summer Standards Conference

Slides:



Advertisements
Similar presentations
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
Advertisements

2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Yong-Yi Wang, Chair API 1104 Committee Meeting Washington, DC June 30, 2010 Report of Fracture Mechanics Subcommittee.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
API Subcommittee 6 Winter meeting 2015 – TG1 Pipeline and Valves Standards Report Rick Faircloth January 4 th, 2014.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
WG on Composite Cements: Composite cement Annex for API Spec 10A - Ballot Result and Analysis Washington DC, June 2016, Heiko Plack.
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –
API 19 CI Chemical Injection Devices for Downhole Applications
Planning for sustainable buildings
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC19 HPHT Template (Proposed as SC19TR1)
API 17X Subsea Boosting January 13, 2015
TG Chair: Mark Brinsden Shell
API SC 10, Work Group 3 Update:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
2017 Exploration & Production Winter Standards Meeting
API 16C Choke and Kill Equipment
API 17Q – Subsea Equipment Qualification
Planning for sustainable buildings
API 16F June 2017 Specification for Marine Drilling Riser Equipment
API S64 Summer Conference Update.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
2016 Exploration & Production Standards Conference Subcommittee 10
API Standard 6X: API/ASME Design Calculations
Specification on float equipment
First 8 slides are what was presented in San Fransisco…
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API RP 17G2 Subsea Pumping Well Intervention Systems
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API RP 59 June 2017 Recommended Practice for Well Control Operations
API Standard 53 Update June 2017
WG on Composite Cements: Calgary Meeting 2017
2016 Exploration & Production Summer Standards Conference
The OPTN Bylaws Rewrite Project What It Means For You
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API SC 10 WG15 Stage Cementing Collars
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Float Equipment API Spec 10F
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API RP 16AS January 2019 Standard for BOP Systems
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

2016 Exploration & Production Summer Standards Conference Subcommittee 10 2015 Workgroup formed to address rewrite: January 17, 2017

Current Status of API Bulletin E3 Resides with API Washington – John Buflod, Bernard Fraboulet – for final editing January 17, 2017

The charge: Rewrite Bulletin E3 as a Guideline Document: Well Abandonment Practices API Bulletin E3 An abandonment cementing and barrier placement guideline to reside with SC 10 Rewrite provides a guideline for the permanent and temporary abandonment of active and inactive wells: Provide a general approach and design considerations for well abandonment Placement of cement plugs - methodology Mechanical Barriers Protection of useable water and isolation of hydrocarbon intervals Does not discuss cement design Does not address specific regulatory requirements Not all inclusive. References to other API documents for detailed information January 17, 2017

Summary of progress in the rewrite: Rewrite of API Bulletin E3 Group has now met 8 times since the charge Main changes to E3 Simplified existing well bore diagrams for different abandonment scenarios Reference to Standard 65-2 and other prescriptive documents Removal of Inactive Well Program (Appendix A) Removal of Inactive Well Worksheets (Appendix A) Removed Summary of Environmental Legislation and Regulations (Appendix B) Rewriting Glossary to be consistent with new document In DC with Bernard for final edit Once completed the report will be sent to publications committee After review the document will go to API for ballot. Should be completed by summer 2017 meeting Working currently with TG5 to apply some of E3 in the new well abandonment RP January 17, 2017

2016 Milestones Completion of document and delivery to Publications Committee before summer meeting 2017 Document goes to ballot before winter meeting 2018 January 17, 2017