Beam Finder Wire Assembly Undulator System

Slides:



Advertisements
Similar presentations
Existing Arcs and 4m Dipole Preliminary Design and Safety Review Beam Transport Interface Mike Bevins February 22, GeV Upgrade - Beam Transport.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
Dean R. Walters April 20, 2006 Vacuum Chamber Review 1 LCLS Undulator Vacuum Chamber Dean R. Walters.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Dean R Walters November 15, 2004 Integration of the Vacuum and Diagnostics with the Undulator By Dean R Walters APS.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
The Television. Block Diagram AerialTuner Decoder (audio) Decoder (vision) Amplifier (audio) Amplifier (vision) Loudspeaker Picture tube.
Oct. 12, 2006 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Factoring General Trinomials Factoring Trinomials Factors of 9 are: REVIEW: 1, 93, 3.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Alignment Tools Used To Locate A Wire And A Laser Beam In The VISA Undulator Project Wire Finder CALIBRATION A special fixture was constructed to calibrate.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
TBM Vacuum considerations Alex Vamvakas 15/07/2015.
Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
ELLIPTICAL HEAD PROTECTING COVER 01_INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD.
New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The reading is 7.38 mm. The reading is 7.72 mm.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
European DHCAL Meeting 13/06/08
L. Gentini, A. Bertarelli, F. Carra
Stephan Aulenbacher MAGIX Collaboration Meeting
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Wire Scanner / A.Demougeot
CTF3 – TL 2 VACUUM CHAMBER FABRICATION STATUS REPORT Jan 22, 2008
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Diffuser status October 2017
Take the worksheet from the Chrombook cart.
Magnetic gap calculation
XFEL Collimation and Beam Switchyard Vacuum Issues
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
LCLS Undulator System Detailed Report
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
questions for cern – doyle rev 7/09/07 1/5
LARP Phase II Secondary Collimator RC-1
e-Beams Systems Update
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Production Management
LCLS Undulator System Status
LCLS Vacuum System Plans (July 07)
LCLS Undulator System Status and Schedule
BGC Collaboration Meeting –
Beam Finder Wire (BFW) Status
LCLS Undulator System Detailed Report
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
PS magnet status D Bodart 25/06/2019.
Presentation transcript:

Beam Finder Wire Assembly Undulator System J Bailey, J Morgan, and D Walters

Beam Finder Wire Assembly Frame Assembly Vacuum Chamber BFW Assembly

Frame Assembly Total of 21 units have arrived from vendor

Frame Assembly

Vacuum Chamber Inspection On the bellows side (10mm tube held in place by a spider), the 10mm tube was out 0.010" horizontally and nearly perfect  vertically On the vacuum chamber (square tube) side, the horizontal squareness (flange perpendicular to the tube) was near perfect but the verticle squareness was off by 0.015" (0.3 degrees). The spec is 0.005

BFW Assembly

BFW Best Estimate Schedule First Articles (3) ship from ANL 1/30/08 Group A (10) ship from ANL 2/11/08 Group B (10) ship from ANL 3/18/08 Group C (10) ship from ANL 4/15/08