Vienna Module Production

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
1 Hybrid & Module Testing Status Week of 4/25-4/29.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Status Brussels GANTRY
Hybrid & Module Testing Status
US Module Production Status
UCSB Testing Status Anthony Affolder
Executive summary from Bonding WG Meeting 21 Oct 2003
US Module Production Quality
FNAL Module Testing Status
CMS Perugia Modules Production Review
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
TEC Module Production Overview
Bari production centre resp. M. de Palma
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
Module Production in Brussels
CMS Perugia Gantry Status Report
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
L.Fiore Gantry Meeting during the CMS TK week
FNAL Hybrid Testing Status
Module Production in Brussels
Module Testing Status Week of 6/14-6/20.
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Vienna Module Production Modules for TEC Ring 2 R2N R2S 2003 2 2 with Dorazil hybrids, without rigidifiers 2004 5 5 with final hybrids, but with retro-fitted connectors on the Kapton cable Total: 7 7 ==> Yet no modules produced for the final production ..... represented by J. Hrubec Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Ring 2 Normal Ring 2 Stereo Vienna / Inst. für Hochenergiephysik Modules for Ring 2 Ring 2 Normal Ring 2 Stereo Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Preparation of the frame Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Vienna / Inst. für Hochenergiephysik Sensor alignment Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Vienna / Inst. für Hochenergiephysik Alignment precision 2003 Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Vienna / Inst. für Hochenergiephysik Bonding Bonding plate for Ring 2 Normal Ring 2 Stereo with rigidifiers Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Vienna / Inst. für Hochenergiephysik Module test: I-V Module .....26693 Module .....26698 Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Module ......26693 module with all channels working correctly Plots for Deconvolution mode and Inverter ON Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Module ......26698 module with highest number of channels not working Plots for Deconvolution mode and Inverter ON Channels 342 and 683 open on hybrid Handling accident: damaged bonds, scratch on pitch adapter Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Vienna / Inst. für Hochenergiephysik Module status 1 hybrid received with distorted bonds (on 3 APV’s): no problems on the module ==> no repair done A few channels open on some hybrids 1 pinhole ==> channel not bonded between sensor and PA 1 module with a handling accident: damaged bonds replaced, scratch on the pitch adapter, module fulfills still the specifications (7 bad channels) 1 module shows frequent I2C problems All modules shipped to Aachen and Lyon Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

Vienna / Inst. für Hochenergiephysik Inventory Modules for TEC Ring 2 R2N R2S Frames 78 77 Rigidifiers 385 355 Hybrids 0 0 After having moved their hybrid test station, the colleagues in FNAL hope to ship hybrids to Vienna this week. Vienna / Inst. für Hochenergiephysik Tracker-week April 2004