1 Bari production centre resp. M. de Palma
Module Assembly (Gantry) Resp: L.Fiore Physicist: M. Preda Technicians: R. Ferorelli , G.Sala part time partecipation of M.Salemi (Ct) has to be sheduled Bonding Resp: P. Tempesta Technicians: P. Cariola Module Test Resp: S. My Physicist: D. Creanza, D. Giordano Technicians: G. Sala Db interface Resp: V.Radicci Physicist:G.Selvaggi April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

2 Module assembly (Gantry)
Available module components Inventory: Sensors: 105 IB1, 340 IB2, 28 W2 , 62 W3 Frames: 409 (r-phi) , no stereo available Hybrids: 48 stereo left, 30 stereo right, 67 incoming r-phi Available tools 3 assembly plates for r-phi modules are operational 1 assembly plate for stereo-left modules under commissioning 3 sets of hybrid tool bridges (12 bridges) April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

3 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week
# Assembled modules 330 good modules were assembled (4 bad) 110 TIB Layer 1, r-phi (IB1 Sensor and apv hybrid on board) 220 TIB Layer 3,4 r-phi (IB2 sensor and 4 apv hybrid on board) April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

4 Gantry (optical inspection)
April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

5 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week
Gantry x,y precisions April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

6 Gantry angle precisions
April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

7 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week
Gantry experiences The pre and post assembly hybrid ARC test done on the first 100 modules showed no effects on the original behaviour of the hybrids after assembly then a sample basis ARC test were decided on the outcoming unbonded modules 8 bad hybrids were discarded over 426 No problems for a normal 8 module/day production A variable flux of all the incoming componets, prevented to test extensiveley a full assembly regime (12 modules/day) Shipping of the unbonded modules to Florence,Catania and Torino Bonding centres was done with no problems (via DHL) after small corrections on the foam of the transportation boxes April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

8 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week
Module bonding Modules bonded till now: 29 IB_L12P6D (6 APV module) 64 IB_L34P4D (4 APV module) Pull test done on 71 modules No particular problems on the machine has been experienced till now Normal rate of 3 mod/day up to 5 Bonding jigs for TID modules missing April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

9 Bonding (repaired modules)
L12 modules: #modrep/#totmod =7/29 #rep_strip/#totmod= 2.5 #rep_strip/#tot_strips= 3 °/°° L34 modules: #modrep/#totmod =10/64 #rep_strip/#totmod= 0.3 #rep_strip/#tot_strips= 0.5 °/°° April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

10 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week
Module test (ARC test) ARCS version & macros: all modules (L34 & L12) tested with ARCS 7.0 with TIB official cuts: testsettings_70.xml xml file for DB produced with xFLAG ( version for RH 7.3) Module grading after ARC test (up to last week) Over 63 modules tested (IB_L12P.6D) : 12 grade A (IB_L34P.4D) : 48 grade A, 1 grade AF and 2 grade C April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

11 Module test (defects multiplicity)
L12 modules 1 2 3/9216 ~ 0.03 % L34 modules 157/ ~ 0.7 % 0.51 ‰ (only …35184) 0.51 ‰ (only …35184) 0.6 % 0.2 ‰ April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

12 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week
92 bad strips April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

13 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week
April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

14 Module test (IV curve for all modules)
T < 23 °C RH < 25% I (uA) V (Volt) April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

15 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week
Xml files on DB April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

16 Module test (Long term)
CMNoise (ADC Counts) APV1 APV2 APV3 APV4 bench0 0.39 0.38 0.41 0.40 bench1 0.35 0.34 0.37 bench2 0.32 0.33 0.31 0.36 bench3 0.42 bench4 bench5 Long Term test started last week 6 L34 modules were tested xFLAG analysis not yet started 3 modules had DAQ errors No modules with I2C errors Massive LT test will start next week Record1 Record18 - COLD Record19 Dec Inv On Tbox = - 20° Tbox = + 20° April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week