Thursday/Friday 6-7 ECS scripts test in Orsay (Alberto,Vincent, Frederic and me) –automatic configuration (scripts are generated.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
EMCal DCS Status By B. S. Nilsen, M. Cherney, J. Fujita Creighton University For the EMCal project.
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
AMS operations on March 5-10 Mike Capell. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada JMDC new program and files (power steps) Cai,
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Patient Survey Results 2013 Nicki Mott. Patient Survey 2013 Patient Survey conducted by IPOS Mori by posting questionnaires to random patients in the.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
5 th Workshop on ALICE Installation and Commissioning April 1 rst & 3 rd, CERN Muon Tracking (MCH) Conclusion of the February/March 08 ALICE COSMIC run.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
11/12 December 20061Borge S. Nielsen, NBI FMD contribution Second Installation and Commissioning Workshop DAQ and ECS FMD contribution Børge S. Nielsen,
Far Detector Data Quality Andy Blake Cambridge University.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1 Alice DAQ Configuration DB
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Dimuon Forward Spectrometer February-March 2008 Cosmic Run General Planning Day by Day report People Shift timetable.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 CTP offline software status (Offline week) A.Jusko and R.Lietava.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
Status of the Shuttle Framework Alberto Colla Jan Fiete Grosse-Oetringhaus ALICE Offline Week October 2006.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
TC meeting P2 planning wks 3&4 A.Tauro
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
Calibration: preparation for pa
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
TS2 preparatory meeting
TPC Commissioning: DAQ, ECS aspects
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
Online Software Status
Experience between AMORE/Offline and sub-systems
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
Maki KUROSAWA VTX Group 2014 Feb 20
CTP offline meeting 16/03/2009 A.Jusko and R.Lietava
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Thursday/Friday 6-7 ECS scripts test in Orsay (Alberto,Vincent, Frederic and me) –automatic configuration (scripts are generated depending on the EquipmentId/DDL selected in DATE) –test with quadrant 9 –check results with mood ECS scripts tested up to 0-supp data taking ! equipmentId selected in DATE is correctly propagated configuration files (init,ldMarc,zSup etc… ) are still hand-made calibration script ready to be tested at cern (index was missing)

Sunday 9 Stand alone test/running –check St1 DDL (all 4) –check trigger sequence l2a and and l2ar –a few try with ecs script –check St2 DDL or Ch3Right (need LC2 on the corresponding LDC) nightly access to cavern : open ? Access will be needed during the week : 4 boards have to be replaced (~ 1 or 2 hour work, including tests) replacement of FRT2 in 2560 (pb with buses 17 and 31) buses 46,47 and 48 disconnected in 2562 After fixes all the St1 is there no power on C20 crate…. not possible to send trigger!!

Monday 10 Stand alone running –readout 1 DDL of station and test the dedicated ECS scripts –readout of the remaining DDLs –tests of the global ECS scripts parametrized by the DDL present in the equipmentID list no night shift nightly access to cavern : probable problem with trigger words (modify crocus code) ECS scripts ready to be tested DCS is not seen by DCS DIM = aldaqecs.cern.ch MCH DCS is broken SCR meeting : HMPID in global and SPD ready soon. L3 doors not closing (Wednesday ?) but dipole is being tested.

Tuesday 11 Stand alone running –possible to read chamber 1 with l2ar.seq but CDH has to be disabled –stand alone run with ECS ok –no trigger on CH2R ; most probably will need to change the cable DCA : fake state machine to make MCH available CDH problem originates from the setup of the L0 parameter (cable transmission only or FPGA crash) checking CDH demands a particular trigger sequence !! SCR meeting : L3 doors will close sometime… Dipole resistance lower than expected (factor 5 !!). DAQ dim server almost solved but still disconnected from DCS. HMPID+MTRG+SDD have run in global partition (TRD,TOF and FMD on the way). ACCORDE not ready.

Wednesday events with CDH ok… load the proper trigger sequence sod.seq,l2a.seq,eod.seq tested along with CDH DCS control OK for DCA control zero-suppression almost ok and calibrations run looks fine St2 (ddl 2564) boot init and ldMarc ok (all manus respond) manu HS on BP 29 of CH1R First Run with Chamber 1 in global partition : smooth integration SCR meeting : L3 doors closing requires moving cable trays january; for now test L3 with ~100 gauss. Dipole resistance still too low (R > 1MΩ to reach nominal field), current raised up to 500A. DIM server problem fixed. SDD + TOF have run together (SDD+HMPID run fails). DCS fire alarms are back. TPC black events cannot be transferred to CASTOR (check limit size). ACCORDE has still trigger words issues. DAQ stop at 7am tomorrow to include monitoring machines in DB. Friday 3 to 7pm dedicated to busy measurements.

Thursday 13 Need to test the shuttle ; test new mood version prepare full st1 for 0-supp and calib then include in global access to test CH2R and add a FTD board in trigger crate. shuttle partially tested clearly a problem with CH2R trigger cable ; tried to pull a old one, didnt work. problems when inserting a new FTD board in trigger dispatching mood tested; OK. Log on aldaqdqm SCR meeting : too many people in CR (34 max), ~100 sometimes. L3 doors closing: January. Still low insulation resistance for the dipole. DAQ global run with 5 detectors. CTP not in yet. V0 and MUTRG inputs connected to CTP. [DCS integration not done yet for muon_trk : see boccioli/ivan ]. TPC rising up voltages to try to see particles. Progress for ACCORDE but not in global yet. OFFLINE started data replication to TIER1 (FZK,ccin2p3); ~50% of estimated p+p data size moved.

Friday 14 check St1 HV : tested up to 1650V nothing above 10 nA check FRT of CH1R (to be done this w/e) Run in global partition with 2 LDCs chamber 1 + chamber 3 right Measurements of busy and trigger rates in global partition : results need to be analysed (summary 40kHZ trigger, data rate 2kHz with ~400 ) pedestal run started from global reads local run control settings (be careful when adding/removing LDC). Each LDC must have its own pedestal/electronic calib config in DATE. SCR meeting : Use electronics logbook! L3 doors same stuff. Dipole 380 KΩ measured (apparently normal ~ sum of the « slices » meseaured independently). DAQ: probleme to rootify big TPC events (360MB). 6 detectors in global and ACCORDE entered global. DAQ/DCS will retry to have common DIM server. Idea to display the busy of detectors on a big screen. TPC HV on, pb with laser. TRD in global.

Saturday 15 Improving St1 readout (changing manu) Lot of problems with trigger (never can be sure where it comes from…) Solved problem with Ch2R : problem with a switch on the CRT check carefully the switches config local vs dispatching of the CRT 4 DDL in one LDC - Full Station 1- read chamber by chamber problem with ECS timeout in LOAD_FERO with 4 DDL detector not in the right state and the physic run cannot start some test runs (see runs list) SCR meeting : not intended….

Sunday 16 Taking data in global partition…. Offline group should take a look at the data. A few standalone runs to test the shuttle a MANU died during a run this has the consequence to mess up the loading of the thresholds. Vincent will improve robustness of scripts. MTRK in global (Ch2 with HT) runs very well run full station 1, 1 LDC fully loaded. Some timeout still to be fix. SCR meeting : CTP readout in global OK, will add big screen display of detector in busy state (Feb). HLT can read data flow from detector (including MTR and MCH), some ESD from TPC events (not analyzed yet). ITS in global, half of SDP, 21 ladders of SSD. TPC HV up, still a problem with events. MCH, I did a little bit of advertising /showing off since we reached all our goals, some congratulations ;-). MTR HV almost reached. ACORDE + small scintillator (below TPC) has some timing problem, bit pattern might not be readable in offline. HPMID problem with trigger info (?). Offline, pb with LCG data replication stopped unexpectedly. Future plan (tuesday) All detectors (except TPC) in DAQ test. If OK, add the TPC for run with DATE check of headers.

Monday 17 Dipole tests; will try to take pedestal runs to measure the influence on the noise if R. Tieulent is around, will try to measure noise when GMS is on. Dipole has been powered (up to 4000A) during standalone runs : no effects seen Pedestal runs with GMS : no visible effects on noise. multiple boot of CROCUS without (off/on) MUST be implemented Some stability problems on LV for St1 : must check current limit used at Orsay. SCR meeting : Dipole current up to 4000A. DAQ, large event problem was a root I/O issue (now buffering TPC data sector by sector). HLT read TPC event, signal visible with a ped+6 ADC cut; should be lowered. SPD all c-side powered, some really bad spikes in T° probably related to water pressure drop (bubbles ?). TPC reach gain ~ ACORDE, no coincidences with small scintillator (give up). MCH, I had to go in the FASS plug –back- trigger cable on CH2R… why was it unplugged ???

Tuesday 18 our machine aldaqacr25 crashed badly yesterday, took some time to recover (might be related to a memory pb) Magnet stable a 4000A, a few pedestal runs. Current increased at 5000A. Survey to measure displacement. Runs in global : rather stable Franco told me that timeout for COMPUTE_THRESHOLD script (maybe others) is now 60 s. Will need to discuss time and #events Correlated hit seen in run (see run list) SCR meeting : discuss tonight plan to satisfy DAQ commissioning and data taking. Run DAQ with the max of detector till 12 with acorde trigger. At midnight, ITS takes over with small scintillator trigger. TPC runs standalone with acorde trigger to accumulate data.

Wednesday 19 NO Work Leaving (Vincent and Christophe) Staying for the morning (Fred and Phillippe) SCR meeting :

Run list in Global Partition Run list must be visible on the alice-logbook (no access outside cern network; you may use remote desktop connection cernts.cern.ch ) –11445 : SSD, SDD, T0 & MCH. ~ Hz with 0-sup, full chamber 1 run pedestal #12362 –12367 : MCH + CTP. ~77 25 Hz with 0-sup, full chamber 1 + ½ chamber 3 (right) –12368 : MCH. ~3500(?) 70 Hz with 0-sup, full chamber 1 + ½ chamber 3 (right) –a set of run made for trigger rate/busy have been recorded (see log book) –13022 : MTRK (chamber 2 physics + CTP, accorde trigger 1 HZ (coincidence) 471 events – : SSD, MTRK (chamber 2 physics TRD [+ HLT] –HT varies between 1500 and 1600 test HT shuttle

Run list in Global Partition –13995 (along with 7 det) pulser trigger, Ch1+Ch2, ended with a big crash of our machine in acr.. –12490 (along with 4 det) ACORDE trigger, Ch1+Ch2, Idipole=4000A –14493 (along with 6 det) ACORDE trigger, events, Ch1+Ch2, no field –14511 (along with 6 det) ACORDE trigger, events, Ch1+Ch2, no field correlated hit seen… should be analysed associated pedestal run : 14452

Run : Hit in chamber 2

Run list (not in global) Local test Runs (pulser Hz) –12963 pedestal run –12964 run with voltage oscillation 1600->1500->1600-> h24 -> 20h45 ~120kevents – calibration runs (few errors problem with the end of data not received after 10s) –12979 pedestal run –12983 pedestal run –13719 pedestal run (reference for no GMS noise ) Ch1R, Idipole=1500A –13722 pedestal run 1000 event Ch1R, Idipole=1500A –13723 pedestal run 1000 event Ch1R, Idipole=1500A –13726 pedestal run 1000 event, GMS Running Ch1R, Idipole=1500A –13730 pedestal run 1000 event, GMS Running Ch1R, Idipole=1500A –13732 pedestal run 1000 event, Ch1R, Idipole=1500A –14259 pedestal run, –14261 pedestal run, –14263 pedestal run,