1 TC meeting P2 planning wks 3&4 A.Tauro 17-1-2012

2 Planning wk3 1/2 EMCal installation –Monday 16/1 PM: travel to CERN –17-18-19/1: modification new nose in SXL2 + cavern preparation (insertion SM into rotator if possible) –Friday 20/1 PM: travel to Nantes TPC capacitors TOF: repair 3 HV connectors Move PMD to parking position (Thu 19 th ) Muon TRG: check on RPC (MTR21-OUT) for gas tightness Muon TRK: repair bus bars on slats: ST4, ST5 and ST3 T0: –Investigation of the problem with laser system (rack 018,019) –Upgrade of electronics and check of spare modules (rack 018,019) 17/1/122

3 Planning wk3 2/2 GS-ASE: –Jan 18 th : connect the redundant power to CSAM and evacuation. No access UX25 cavern from 7:00 AM to 8:00 AM –Jan. 20 th : test fire detection EN-CV-DC: maintenance TOF-PHOS-EMC-SPD and TPC cooling plants EN-CV: –Restart chilled water CRs –Maintenance L3 extraction unit. Test of alarms –Maintenance ventilation unit SG2 (Mon-Tue)  will cut Ar/H2 EN-EL: –Wed 18 th Jan: maintenance power transformers: Will cut EXD1/2X for 3h  cut power to CRs (normal network) Will cut ITS ventilator and HMPID rack in CR5 –Test AUG P2: Fri Jan 20 th – No access UX25 Major electrical perturbation affecting P2 for whole day 17/1/123

4 Planning wk4 EMCal installation –Monday 23/1 PM: travel to CERN –24-25-26/1: insertion –Friday 27/1 PM: travel to Nantes TPC capacitors PMD maintenance Remove SPD&SSD boxes PP1 –Mon 23/1 AM: disconnect and displace SPD box –Mon 23/1 PM: disconnect and displace SSD box –Tue-Fri: TPC A-11/12 (4 days) –Sat: put back and test SSD box Muon TRK: –Repair bus bars on slats: ST4, ST5 and ST3 –Change one quadrant in ST2 (3 Right Bottom) Survey MTG GS-ASE: Jan. 26 th : test fire detection EN-CV-DC: maintenance HMPID and TPC-RR cooling plants EN-CV: –Repair leak FB pipe (23 rd Jan) –Replacement CR3 racks and removal air conditioning CR2-3-4 17/1/12TC meeting - A.Tauro4

5 DAQ restart Different service levels identified: –Level 0: no activities –Level 1: LDCs only, no runs –Level 2: DCA only, no recording/migration –Level 3: PCA and/or DCA, no recording/migration –Level 4: PCA and/or DCA, recording/migration Plan for the restart: –Until Tue 17 Jan: minimum services (level 1 or - if requested - level 2), ECS/DAQ HW/system upgrade in progress –Tue 17 Jan @ 16:00 or Wed 18 Jan 8:30: power off LDCs –Wed 18 Jan: maintenance power transformer –Wed 18 Jan late afternoon (if requested) or Thu 19 Jan @ 8:30: restart minimum services –Thu 19 Jan: expect CTP back on –Thu 19 Jan @ 16:00: power off ACR/WRs/CR1 –Fri 20 Jan: AUG –Fri 20 Jan late afternoon (if requested) or Mon 23 Jan @ 8:30: power on ACR/WRs/CR1 –Mon 23 Jan @ 8:30: power on, all services back in production 12/1/12Shutdown progress and planning A.Tauro 5 Roberto

6 New DCS cluster The 'old' DCS cluster has been fully upgraded and patched, detectors are invited to test functionality (several already did, and no major issues were reported) The 'new' DCS cluster is from 75% physically installed and currently being cabled with power and network. First machines shall be available for detectors for migration by the end of the week 12/1/12Shutdown progress and planning A.Tauro 6 Andre’

7 CTP CTP crates are off till Thursday morning. If urgently needed, we will switch them on (just call Anton on 162090) 12/1/12Shutdown progress and planning A.Tauro 7