DTC Spring Kick-Off January 8th 2015.

Slides:



Advertisements
Similar presentations
DISTRICT AND SCHOOL ASSESSMENT & TECHNOLOGY COORDINATOR ONLINE TESTING WEBINAR FEBRUARY 7 AND 9, 2012 Washington Online Testi ng OSPI Office of Superintendent.
Advertisements

4th and 7 th Grade Social Studies 5 th and 8 th Grade Science April 14 – May 2, 2014.
Preparing for PARCC Spring Field Test ADE Assessment Webinar February 26, 2014 Focus of this Webinar: Paper-Based PBA Test Materials, Proctor Caching,
Training Sessions for the 2015 PARCC Test Administration in Massachusetts January
 Minimum System Requirements  Updates to Proctor Caching  Updates to Configure TestNav  Setting Up Your Infrastructure  System Check Utility  Resources.
1 Arizona Grade 8 Science Online Field Test Test Administrator Training March 23 – April 2, 2007.
COMPUTER-BASED TESTING (CBT) CERTIFICATION TOOL (FSA, FCAT/FCAT 2.0, AND EOC) Maria C. Bruguera, Director 1 Mara C. Ugando, Staff Specialist Assessment,
1 Proctor Caching and TestNav Configuration. Role-Based Key 2 Role-Based Codes LEA Test Coordinator – School Test Coordinator – Test Administrator/Proctor.
Alaska Measures of Progress Educator Webinar November 4, 2014 James Herynk Webinar Logistics: Audio will be streamed through Adobe Connect. Audio is also.
1 Technology Readiness Maryland /2015 Admin Schedule 2 AssessmentOnline/CBT Testing Dates PARCC - PBAMarch 2 – May 8 MSA ScienceApril 13.
Regional Workshop for PARCC Field Test Spring 2014
PARCC Setup Training January 12-16, 2015 Infrastructure Test January 14, 2015 Phil Wasilewski LTC Area 2 Network Specialist.
Questions? Type in Q&A Computer Based Testing Best Practices November 28 & 29, 2012 Grade 5 FCAT 2.0 Computer Based Testing Best Practices.
Michael Gelinas Fall 2014 Colorado Measures of Academic Success (CMAS) STC High School Administration Training.
1 ADP Algebra II End-Of-Course Online Field Test Test Administrator Training September, 2007.
Alaska Measures of Progress Educators Webinar September 9, 2014 James Herynk.
Technical requirements The Test – testNAV 8 – As soon as the number of students and particular devices are known, these devices should be tested against.
COMPUTER-BASED TESTING (CBT) CERTIFICATION TOOL (FSA, FCAT 2.0, AND NGSSS) MARIA C. BRUGUERA, DIRECTOR 1 MARA C. UGANDO, STAFF SPECIALIST ASSESSMENT, RESEARCH,
Copyright © 2015 Pearson Education, Inc. or its affiliate(s). All rights reserved.
Technology readiness Massachusetts Department of Elementary and Secondary Education 1 DevicesPeopleInfrastructure DevicesSupportTest AdministrationExternalInternal.
DSTEP Science 2016 Grades 5, 8, and 11. Important Dates Questar has training webinar’s planned for Feb. 17, Mar. 16, and Mar. 23 from 3-4 pm. These 3.
STAAR Assessment Management System and StAAR Online Testing Platform
Welcome Please log into PearsonAccess next training center. – – If your login credentials do.
Welcome Test Management Change in training philosophy! A few powerpoint slides One short video On your own practice (complete the checklist) 1.
Summative Assessment Welcome We will wait a few minutes for participants to log on and call in. –Call in: –Pass code: *6 to.
TestNav: Pearson’s Online Testing Engine Training and Practice Item Review Colorado Summative Science and Social Studies Field Test Spring 2013 Call in:
Technology Coordinator Training for PARCC and DC Science Office of the State Superintendent of Education Assessment Team 1.
Copyright © 2012 Pearson Education, Inc. or its affiliate(s). All rights reserved
1 Infrastructure Trial Running a Dress Rehearsal.
Wyoming Technology Readiness February Agenda Wyoming Training - Feb Technology Readiness  Schedule of events  Components and System Requirements.
Technology Coordinator Training. Agenda Getting Started Using SystemCheck Technology Configurations Infrastructure Trial Proctor Caching Overview Managing.
2016 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
Mississippi Science Test, Second Edition (MST2) Open Labs April 16, 2015 April 21, 2015 April 28, 2015.
Proctor Caching Overview. 2 Proctor Caching Diagram.
Online Testing Infrastructure Readiness Checklist and Infrastructure Trial.
TestNav Functionality and Support Devices/Browsers August 2016 TestNav |1.
Setting up Sessions in Pearson Access Next Dallas ISD February 2016.
Illinois Assessment Update
Technology Readiness for Schools and LEAs
Infrastructure Readiness Training
Running a Dress Rehearsal
Please call in by telephone: Meeting # (Access code):
Running a Dress Rehearsal
Creating an Online Test Session
QUICK START GUIDE TO ONLINE TESTING
Summative TestNav and ePAT Training
Infrastructure Trial/Dress Rehearsal
District Coordinator Training Fall 2016
Test Administration Q&A Session for the ACT
CBT Update NYSAA NYS 3 – 8 Assessments
Welcome to the Mississippi Test Administration Q&A Session for the ACT
Technology Coordinators
2016 Minnesota Assessment Conference
and TestNav Configuration
District Test Coordinators Meeting
DTC Spring Kick-Off August 20th 2015.
11/15/2018 CoAlt Office Hours September 26, 2016.
DTC Troubleshooting and Support Webinar
Colorado Measures of Academic Success (CMAS) Regional DTC Meetings
DLM Technical Training
Technology Coordinators
Maryland High School Assessments Training
DTC Kick-Off Meeting One conference number: Dial *# to mute and unmute your phones. Please type your Name and District in the Chat box to.
Computer-Based Testing (CBT) Certification Tool
Site Readiness DTC Kick-Off Sept 2014.
Technology Coordinators
Technology Coordinators
Technology Coordinators
FitnessGram® 2015 Student Information System (SIS) Extract Import Training for Georgia School Year.
Presentation transcript:

DTC Spring Kick-Off January 8th 2015

4 Assessment Windows

Spring Assessment Schedule PARCC Performance-Based Assessment (PBA) Grades 3-8, High School ,ELA and Math 3/9/2015 through 4/3/2015 CMAS and CoAlt: Science and Social Studies 4 and 7 (Social Studies), 5 and 8 (Science) 4/13/2015 through 5/01/15 Dynamic Learning Maps (DLM) CoAlt Grades 3-11 students with significant cognitive disabilities 4/13/2015 through 5/15/2015 PARCC End-of-Year Assessment (EOY) Grades 3-8, High School, ELA and Math 4/27/2015 through 5/22/2015

Online Assessments Important Dates Spring 2015 Description PBA-PARCC English Language Arts and Mathematics Science and Social Studies EOY-PARCC English Language Arts and Mathematics Submit student data December 3 February 16 – March 6 January 23 Online test session set-up begins Open now March 30 Proctor caching test content available February 23 April 13

Supporting 2 Platforms

Assessment Platforms Assessment Test Engine SIS Notes PARCC Performance-Based Assessment (PBA) Caching server available. Java dependences for desktop devices. Apps for Chromebooks and iPads. CMAS and CoAlt: Science and Social Studies Use same PARCC configuration and software. Different SIS. Dynamic Learning Maps (DLM) CoAlt Educator Portal KITE client install for each device. Caching server available. Each client must be individually configured to point to caching server. PARCC End-of-Year Assessment (EOY)

TestNav Components Component Current Software Version Next Release date Recommendations Proctor Caching v2014.1.15 TBD Upgrade proctor caching Servers to this version. TestNav v8.1 v8.2 on January 15th 2015 Full Test of Assessment Environment using forms from training site. (infrastructure trial) iPad App v1.2.0 Quick Verification Chromebook App V1.2.53 Java 8v25 January 20th 2015

Updating the Proctor Cache Software Version 2014.1.15 is available for download here: http://parcc.pearson.com/technology-setup/ Since purging the content is the first step in the upgrade process, it may make sense to perform the upgrade while you are purging.  1. Purge Content from Current Proctor Caching Machine.   2. Uninstall Proctor Caching. 3. Install the new Proctor Caching software.

Purge Content from Current Proctor Caching Machine. Type the static IP colon 4480 into your browser’s address bar (xxx.xx.x.xx:4480) to see the proctor caching server’s status. On the Home tab, select Go to Content List tab or select the Contents tab. To filter your list, enter search criteria and select a value from the drop-down list. Select Clear to reset your search criteria. Select the test to purge. Click Purge Content. Enter the following proctor password in the popup window: t35t1n6 Test content is purged.  

Quick Verification Start a Browser or App. Select a URL: http://co.testnav.com or Enter the following credentials in the login screen: Username: username Password: password Choose "Sign In". Click the "Start Test Now" button. If you see the "Congratulations" screen then your computer is correctly configured to run TestNav.

Full Test of Assessment Environment Pearson Access Training Center Create Students Configure TestNav Create a Test Session CMAS - Use the site readiness form for DTCs only/ePat Grade level forms are for students. PARCC - Use any of the PARCC ELA or Math forms. Pre-cache Test content Print test authorizations tickets. Start the Test Session. Log into the URL on the authorizations tickets and take the test.

TN Technology Guidelines Update VERSION 4.3 – November 2014 UPDATE Firefox browser version requirements updated to versions 28-33 Chrome browser version requirements updated to versions 35-38 Java versions for Internet Explorer updated Android and iOS8 support added Whitelist requirements updated for MAC and Windows Tests/accommodations requiring proctor caching listed Macintosh OS 10.8 and 10.9 support added for Proctor Caching Windows RT removed Accessibility and accommodations information updated for spring 2015 testing

CDE Support Checklists – High Level Network Preparation Proctor Caching Device Preparation Testing the Assessment Environment Post Test Tasks Technical Training Slide Decks – Detailed Training Follow the structure of checklists Detailed instructions with links to documentation Webinars Trainings - Cover Technical Training Slide Decks Office Hours - Q & A Sessions to answer specific questions Check http://www.cde.state.co.us/assessment/newassess-dtc for details.

CDE Training Schedule Training Dates Times Content Fall CMAS Debrief/ Spring Kickoff 01/08/2015 9:00am Over of the two testing systems covering key dates. TestNav Site Readiness Technical Training 1/15/2015 1/20/2015 1:00pm Nuts and bolts of TesNav assessment environment configuration. Office Hours Tuesdays Thursdays Answer your specific site readiness questions.

Thanks for Your Time Evaluation https://www.surveymonkey.com/s/dlmteval