GlueX Electronics Review Jefferson Lab July 23-24, 2003

Slides:



Advertisements
Similar presentations
VSE Corporation Proprietary Information
Advertisements

Variable Frequency Drives VFD Basics
Develop a Solution Plan (Project Scheduling). Tools of the Trade Schedule Formats Gantt ChartsGantt Charts PERT/CPM ChartsPERT/CPM Charts DSM (design.
Accelerator control at iThemba LABS. Some background No formal reliability procedures Cost considerations SSC operational 24/7 Shutdown total of 2 months/year.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” LC-TPC-LBL 18-Oct Tracking Detector R&D at Cornell University and.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Department of Electrical and Computer Engineering Lighting Tool Box Winter 2004 ECE 498 Team Members: Nick Sitarski Blaine Thompson Brandon Harris Dave.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
From Research Prototype to Production
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Computer Science and Instrumentation Research Opportunities at CLS Johannes M. Vogt Canadian Light Source University of Saskatchewan
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Hall D Online Meeting 9 August 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division Mission Who’s Who.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
CONDUCTING TEST ON THE INSTALLED COMPUTER SYSTEM
It’s…….
Installation of the T600 at Fermilab
Section 6: Air-Conditioning (Heating And Humidification)
Accelerator control at iThemba LABS
St. George Infrastructure
MICE RF System Power Supplies, Control and Monitoring Status report
Technical Design for the Mu3e Detector
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Injectors BLM system: PS Ring installation at EYETS
ISUAL Product Assurance
Particle Physics Group Christmas Meeting December 2016 Graham Miller
The ILC Control Work Packages
T1 Electronic status Conclusions Electronics Cards:
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
the CERN Electrical network protection system
Henning E. Larsen, INFN 12 July 2006
Maintenance at ALBA facility: Strategy for the conventional services
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
Safety, reliability and maintainability
Ion Source and LEBT Beam Diagnostics
Rack installation and local tests for the MEBT Chopper Rack
Benefits & Advantages of Pogo Pins
Presentation transcript:

GlueX Electronics Review Jefferson Lab July 23-24, 2003 R. Chris Cuevas Physics Division Group Leader -- Fast Electronics Topics: Printed Circuit Board Manufacturing Maintenance Power & Grounding 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas PCB Manufacturing JLAB Electronics Group & GlueX collaborators have extensive experience with design and ordering PCBs in industry. PCB is not a mechanical part! Electrical characteristics more important than mechanical tolerances Design Tools are essential for verification We have PCAD, Gerber View Tools but,,, More extensive simulation tools would be useful (e.g.) PCB layout simulation, signal integrity modeling 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas PCB Manufacturing 1000’s of custom PCBs have been manufactured in industry for CLAS. [Drift Chamber, Level II Trigger, Timing distribution] Typical PCB development ‘procedure’ Design requirements -- Specifications/Format EECAD -- Schematic capture -- Board layout Prototype ordered -- Assembled on site TEST -- Verify circuit performance -- Record results Capture all ECOs [ Engineering Change Order ] 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas PCB Manufacturing ‘Procedure continued’ Verify all ECOs in new layout Prepare order for contract manufacturing & assembly Evaluate manufacturers -- Not on price alone! Long term reputation/experience Documented Quality Control standards [ IPC,ISO ] Automated assembly equipment Bare board test equipment 1st Article assembly very important 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas Maintenance No glamour, but planning NOW is critical for high availability Must plan for spare PCBs for each custom design Crucial components must be identified Spare devices purchased for long term replacement DOCUMENTATION -- Must archive and provide on-line Schematics System/Wiring Diagrams Maintain Firmware Development Tools and Code Test Programs 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas Maintenance High Availability Demands: Low Mean-Time-to-Repair Example: Powered Card Enclosures [ “Crate” ] Removable power supply units Removable fan tray Easy access to circuit boards -- test points Remote monitoring of “Crate” systems -- V, I, Temperature Remote reset feature where applicable 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas Maintenance Planning for the repair “shop”: Must provide training for technicians on new designs Test “Stations” for all custom and commercial boards Ability to repair/rework circuit cards, power supplies Assure proper tools and test equipment are provided Establish circuit board calibration/repair/tracking database Use new technologies for keeping track of all modules in the experiment. [ RF Id,, Bar code ] 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas Power & Grounding Very extensive topic and, We have good experience with Hall B [ CLAS ] Careful planning of power isolation and grounding grid Extensive review of AC Mains requirements Must include grounding grid requirements for Accelerator connection and civil engineering Must identify all large “consumers” of AC Mains Superconducting Magnet system Building utilities [ HVAC, LCW, Pumps, Crane ] Front End Readout crates High Voltage systems 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas Power & Grounding 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas Power & Grounding Reasons for Grounding Shock and Safety Hazard Control Reduce lightning related gradients Avoid injury to personnel Avoid damage to Electrical/Electronic equipment Establish return reference EMI control Shield reference for cables, isolation transformers 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas Power & Grounding Learn from omissions: [ CLAS example ] Plan for dedicated network conduit(s) High speed network gear & beam-line diagnostic equipment not in close proximity to detector power supplies Low radiation levels in Hall D Should allow extensive use of Fiber Optics for Communication links -- Data acquisition -- Optical isolation for control circuits where applicable 9/18/2018 GlueX Electronics Review --R.C. Cuevas

GlueX Electronics Review --R.C. Cuevas Summary PCB Manufacturing Excellent design record. Almost zero problems with production PCBs in CLAS New design/verification tools would be beneficial Maintenance Electronics Group is a small [ efficient ] group Large portion of readout electronics for CLAS and other Halls are mostly commercial [aging] electronics Custom electronics will demand better tracking, repair and long term availability of crucial components Power & Grounding Careful review of AC Mains requirements NOW Requirements for detector power supplies, HV, Front End crates need to be established,,, Grounding/shielding configuration is crucial for low noise measurements and reducing EMI pickup 9/18/2018 GlueX Electronics Review --R.C. Cuevas