Technical Support Activities in PH-ADO-PO

Slides:



Advertisements
Similar presentations
Atlas standard opening ATLAS Project Document N°: ATL-HT-OP-0014 EDMS id Created : January 13 th, 2009 Modified : Main document Overall view of.
Advertisements

Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Technical Support Activities in PH-ADO-PO
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
June 17, 2004 / Collab Meeting Strategy to reduce uncertainty on a  to < 0.25 ppm David Hertzog University of Illinois at Urbana-Champaign n Present data.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Section Meeting: TC overview. Outline TCn organization TCn activities – Maintenance and new installations Short term priorities Mid Term priorities Long.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Status on closing operations End cap calorimeter side A Forthcoming operations ATLAS – April 17th, 2009 Prepared by Michel RAYMOND.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
ADO-PO / TC meeting 1st December 2016
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Hailo US Tower Equipment Manufacturer
LBNF CAD models, Drawings and Component list
ADO-PO section meeting. ADO : Atlas Detector Operation
TC activities.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
The LHCb Installation Story
Status of the Mechanics at Ciemat.
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
LHC Experimental Vacuum Systems Status October ‘07
Technical Support Activities in EP-ADO-PO
Update of experimental hall in Japanese mountain site
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Summary/Conclusions of the SuperB PID Sessions.
Sub-Detector Assembly Area Summary of discussion at ALCW2015
CMS RPC Endcap RE1 Status Report
Installation plans from mid 2005
L&V Manpower Development Prepared by: HR department Mar, 2013
Operations/Control room organization during commissioning
NSS integrated installation plan workshop Introduction
Polarized 3He target installation
Presentation transcript:

Technical Support Activities in PH-ADO-PO Sept. 2009 to December 2010

Summary of recent activities The current shut down started on October 8th, 2008 Today the closing of the shafts is on going UX15 will be back to restricted mode ≈ September 20th, 2009 Nearly 12 months with activity mainly focused on Cavern needs Opening and closing of Atlas (7 months, not full time !) Good improvement in the process, first time the shielding is fully installed Installation & removing of standard access (>1.5 month) Good improvement in the Barrel gap area Big wheels : support to optical fiber replacement (>1 month) Calorimeters : shielding and access Muons : Support to barrel chamber repair, EEL, EES rails,… JD ring segments modification, locking devices, … The list is not exhaustive, but the amount of work that has been done and the level of quality and efficiency we reached is very satisfactory The forthcoming tasks will be rather different, a new challenge is to adapt ourself to it, and be prepared for the next shut down

Main activities and objectives Technical Support and operation for ATLAS Run “very draft” schedule (from Mike Lamon’s talk on August 27th) 1 month pilot & commissioning (from 450 GeV to 3.5 TeV) 3 month 3.5 TeV 1 month step-up Access ? 5 month 4-5 TeV 1 month ions (end of November 2010) According this plan : no opening in 2010 ! BUT we have to be ready to open at any time with a short notice (about 2 weeks) Really depends on the behaviour of the machine During the run : Participation to Safety : TSO, RPA, RPE, Patrols… Some Stand by service is needed, that will affect our organization We have to be prepared to this and react positively… as usual ! Technical support to various sub-systems, in case of access Magnet activity Support to safety system

Main activities and objectives Maintenance and upgrade of the existing movement system Yearly maintenance of hydraulics components Assembly, start and commissioning of a second hydraulics system for movement A few improvements to be done Scaffolding improvement New folding bridges under study : manufacturing 2nd half of 2010 Round scaffolding Manufacture of various devices (drawings from Design Office) Platforms (sector 13, top of ECTs) Barrel and forward platforms (related to EE muon chambers installation) More generally, all tooling necessary to open, close or access in Atlas Organization and supervision of the storage in surface buildings Support to various activities, in agreement with PH division

Policy (unchanged) The sub-section is a team with good relationship inside the ADO-PO section  strong link to be developed with the 2 other sub-sections : Engineering and Safety People are assigned to a project in order to have a good follow up and a better knowledge of what they have to do. But Priorities are defined every week and a list of tasks is produced in agreement with these priorities. Technicians will work on various sub-projects The technical responsibility as well as the organization of the tasks belong to the project leaders of the various sub-systems.

Manpower assigned to the Technical Support (2009) Supervision/operations M. Raymond Magnet P. Benoit M. Jeckel Point 1 Facilities Detector cleaning W. Andreazza + General support + Safety team Muons W. Andreazza V. Durastanti C. Leboube F. Limia Condé A. Yandyan Mechanical workshop G. Akhperjanian V. Durastanti J-C. Moreau C. Leboube A. Popov L. Rose-Dulcina A. Yandyan + A. Bode + P. Charra Movement system D. Bertet F. Rosset + General support Access L. Rose-Dulcina G. Akhperjanian + General support D. Bertet W. Andreazza Counting rooms Racks C. Scalisi