Experimental Facilities Planning

Slides:



Advertisements
Similar presentations
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
Advertisements

1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Seeman LCLS December 2, Conduct of LCLS Accelerator Operations John Seeman Assistant Director LCLS Directorate.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
John N. Galayda DESY October 8, LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning.
LCLS Facility Planning for LCLS-II. 2 LCLS vs. LCLS-II NowHXU - CuSXU - CuHXU - SCSXU - SC Photon Energy Range (eV)
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
LCLS User Access Policy
LUSI Coordination with LCLS
LCLS Instrument Development
LCLS Ultrafast Science Instruments
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
LTU/Undulator Installation Status
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
LINAC OPS Budget Review
John N. Galayda – Director of LCLS Construction March 30, 2009
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
LINAC OPS Budget Review
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-Ray Endstations Update
Project Management Issues John N. Galayda, SLAC April 24, 2002
Project Status Review May 13-15, 2008.
John Arthur – LCLS Experimental Operations
FEE Diagnostics and Commissioning
NEH - Status Stefan Moeller.
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
Conventional Facilities Status
LTU/Undulator Installation Status
X-ray Correlation Spectroscopy Instrument
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
DOE Review 7-9 February, 2006 Steve Lewis
LCLS Operation in 2009 Roger A. Erickson
Linac Coherent Light Source Project Update
Linac Coherent Light Source Transition to Operations 11 July 2007
X-Ray Endstation Design & Management/Commissioning
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
X-Ray Endstation Systems (XES) 2006 Schedule
LINAC System Engineering / Design Status C.E. Rago
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

Experimental Facilities Planning John Arthur LCLS Photon Systems Manager Near term schedule XFD within the LCLS organization XFD scope XFD priorities

LCLS Installation and Commissioning Time-Line X-ray Systems LTU/Und Install Install Undulators First Light in FEH FEE/NEH Install First Light in FEE X-Rays in NEH FEH Hutch BO CD-4 (7/31/2010) now J F M A M J J A A S O N D D J F M M A M J J A S O N D D J F M A M J J 2008 2009 2010 Down Down? PPS Operations LTU/Und Comm. NEH Ops & Commissioning Linac/BC2 Commissioning Re-establish e- to SL2 FEL/FEE Commissioning Nov. 3, 2008

FY2009 details Now-March 2009 Install FEE components, FEE PPS, NEH PPS March/April 2009 FEE/NEH safety review, PPS certification May 2009 First light to FEE May-June 2009 Install AMO instrument in NEH Hutch 1 July 2009 AMO instrument readiness review First light to NEH (Hutch 1 only) September 2009 First LCLS User operation with AMO instrument

LCLS X-ray operations plan 500-700 hrs in FY09, with 1 instrument (month of Sept 2009) 4000 hrs in FY10, with 2-3 instruments (Oct-Dec 2009, Mar-Sept? 2010) 5000 hrs/yr by FY14, with 6 instruments X-ray operations scheduled in blocks of a few months or more, with periodic (every 2 weeks?) brief (2 days?) interruptions for machine studies Typical experiment will last for about 2 weeks

LCLS organization LCLS Director Accelerator Systems Div Dale Knutson Accelerator Systems Div John Seeman operate accelerator for science Experimental Facilities Div Jochen Schneider operate instruments for science Business Div Cindy Lowe Engineering Physics Div David Schultz Strategic Projects Div John Galayda LCLS Construction LUSI

ASD responsibility XFD responsibility Undulator Hall XFD responsibility Near Experimental Hall Shield wall between Electron Dump and FEE Far Experimental Hall

Experimental Facilities Division Tasks Manage safe operations in LCLS experimental areas Manage LCLS user program Maintain and upgrade X-ray instrumentation Enable good user science; initiate in-house research

The LCLS X-ray Beamline X-ray transport tunnel Far Experimental Hall Hutch 1: AMO Instrument Near Experimental Hall Front End Enclosure

Diagnostics and Offset Mirrors in the FEE Solid Attenuators Gas Attenuator Thermal Sensor Beam Direction Slit Gas Detectors K-Mono 5 mm collimator Direct Imager (Scintillator) FEL Offset Mirror Systems

LCLS Offset Mirror Systems 800-2000 eV to Hutch 1 HOMS: Hard x-ray Offset Mirror System SOMS: Soft x-ray Offset Mirror System insertable 800-2000 eV to Hutch 2 insertable 2000-25000 eV to Hutch 3-6

AMO Instrument Optimized for studying the interactions between FEL X-ray pulses and simple samples: atoms, molecules, clusters beam

Other LCLS instruments SXR: Soft X-ray FEL studies of condensed matter (dynamics of phase transitions, imaging of nanoparticles) XPP: Hard X-ray scattering studies of laser-excited states XCS: Hard X-ray coherent scattering studies of dynamics CXI: Flash imaging of nanoparticles and molecules MEE: Studies of materials in extreme environments (high temperature, pressure)

LCLS User Program Goal: safe, efficient operation promoting the best science LCLS will be a DOE-BES User Facility Access through proposal/review process LCLS scientific staff frequently collaborate with users, also maintain independent research programs

Current XFD Priorities Installation in FEE, Hutch 1 Begin User program First proposals in, review underway Seeking User program manager Form Safety program Working with ASD to form complementary structure Seeking XFD Safety Officer Augment scientific/support staff

Summary XFD is a new department at SLAC, will run LCLS X-ray experimental facilities XFD will be the interface between LCLS and the world user community Will nurture creation of LCLS instruments, then manage them Goal: safe, efficient operation promoting the best science