Test beam check list Michael JECKEL EN-EA-EC EDMS:1745256.

Slides:



Advertisements
Similar presentations
Sterling Heights Public Library Agenda n We’ll learn how to “clean up” the computers n We’ll review how SLC’s mail system works n We’ll review SpamLion.
Advertisements

iRequestManager for MediMizer X3
SETUP Chapter 6 Lead Abatement for Workers Course.
PROCEDURES AND REQUIREMENTS FOR THE SAFE USE OF RADIOACTIVE MATERIAL Indiana University - Bloomington.
Introduction to Online Data Collection (OLDC) Community Based Abstinence Education September, 2009.
SPS Secondary Beam Experimental Areas Access System 7 September 2012.
EHN1 Claude Pesce DGS/RP. Why TREC & buffer zones?  Radiological control of material leaving beam areas is a legal obligation.
IMPACT Safety sub-working Group 1 Fernando B. S. Pedrosa IMWG – 07/Oct/2014 EDMS id:
Handling of radioactive material and waste M. Magistris and L. Ulrici (DG/SCR)
SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
EleUM (Electronic Learning Environment University Maastricht)
Radiation Protection Instructions
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
WG7: 2014 RD51 Test Beam Brief introduction to the RD51 semi-permanent test beam area H4 (mostly for our Indians colleagues) News & Reminder ( mostly for.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
Access requirements D. Caforio Università di Bologna – INFN AFP Testbeam Organization meeting – October 18 th, 2012.
We have two Zones in the Library Conversation Mobile Phones Group Work Zones Second and third floors are completely silent.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
S’Cool LAB Safety Julia Woithe 1.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
Transport & Handling of Detectors TAN Workshop S. Prodon –
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Copyright ©: SAMSUNG & Samsung Hope for Youth. All rights reserved Tutorials The internet: Setting up Suitable for: Beginner.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Schedule Access to the hall b508. Magdalena Kowalska.
SuccessFactors - Frequently Asked Questions FAQs Question: I don't have easy access to a computer at work. What other options do I have? Answer: SuccessFactors.
First Day of Class First Day of Class Student Registration Guide
Invigilating Cambridge exams
(Access system for HWC)
Test beam check list Michael JECKEL EN-EA-EC.
Safety in the Neutrino Platform Hall
NP Hall Visits Guides’ training
Report on database work for INB in ATLAS
S’Cool LAB Safety Julia Woithe
Student Monmouth College
CE Status: Activities executed until 03/08 and ongoing
Two-factor authentication
Nikhef/Bonn LepCol meeting
Quality Assurance applied to Accelerator Safety
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
Access to the experiment
Radiation Protection for the Beam Line 4 Schools project
Safety and Security of Radiation Sources
Radiation Protection for the Beam Line 4 Schools project
IT for Students Need IT Help? Visit
Reservations and Events
Safety memo PPE - What I must remember
Experimental Areas – LS2 planning
EBSCOhost Advanced Search Guided Style
The cleaning procedures for Operating Suites are broken into 2 groups.
CHemical Inventory Management and
Presentation transcript:

Test beam check list Michael JECKEL EN-EA-EC EDMS:1745256

Michael JECKEL EN-EA-EC Test beam check list Content: Safety & Radiation Protection Arrival Access Installation Departure 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Safety Defibrillator in building 887 CERN fire brigade 7.44.44 +41.22.767.44.44 from non CERN mobile phones Central bridge 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Safety & Radiation Protection It is mandatory to wear a personal dosimeter in the experimental halls all the time It is mandatory to wear always a helmet and safety shoes in the experimental area It is prohibited to smoke, drink and eat in the experimental halls all the time “Only exception (drink and eat): cafeteria in building 887” Links: How to obtain a dosimeter Safety users guide Contact: ph-safety-office@cern.ch 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Arrival Fill out an Transport Request (Arrival) when the material comes from outside CERN Fill out an Transport Request when you need a crane or forklift to unload the material Request needs to be send five working days prior to the intervention 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Arrival 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Access Fill in an EDH- Access Request for the control room and for patrol rights. Link: Electronic locks instructions To enter the experimental hall the personal dosimeter is enough. Safety courses @ SIR: CERN Safety Introduction Electrical Safety – Awareness Radiation Protection - Supervised Area CERN - Beam Facilities 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Access Only for CERN services 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Installation What are your requirements ? Transport and crane Adjustable support / scanning table Electricity Gas EDMS 1604697 Geometer Magnet Additional beam instrumentation Vacuum pipe Cables IT services Be aware that the experimental area might not be the same as last time! 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Installation Our requirements ! Provide all relevant information of the set up: Dimensions (XYZ), weight and a photo of the detector Movement range of scanning stage Reservation of scanning stage (DESY / XSCA) Drawing of the setup Your requirements All information must be provided three weeks prior to the allocated beam time to the “Beam Line Physicist” & “User Technical Support” Link: SBA page XSCA ±200mm 80kg DESY ±500mm 1000kg 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Vacuum pipe Magnet Detector X.Y meters EDMS 1605378 G:\Workspaces\s\SBA\NORTH\EHN1\Drawings\Zones_PPE 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Installation After installation, remove all non-necessary equipment / material from the beam area to avoid (time- intensive) RP checks at the end 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Installation – patch panel Zone PPE 172 (H2B), 134 (H4A), 146 (H6A), 138 (H8A) & 158 (H8B) A: 36 x SHV B: 60 x BNC C: 10 x RJ45 D: 6 x Type D D: 2 x Profibus E: 2 x Burndy 12 E: 2 x Burndy 19 E: 2 x Burndy 28 F: DESY table control 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Installation Provide adequate attachment points for lifting operations ! Detector 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Departure Make sure that you take ALL your equipment and waste with you ! All equipment and waste that was present in the experimental area has to be considered as potentially activated and thus be registered in the TREC system to be checked by RP. Be aware that for SHIPPING/TRANSPORT requests out of CERN, a Ɣ-spectrometry is mandatory to coop with international RP regulations. In order to avoid that your equipment becomes blocked for weeks (or longer) at CERN, remove all unnecessary items from the beam area before taking beam. Link: TREC instructions TREC 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Departure Don’t forget to select 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Departure The shipment request will be created by the TREC system Never click here ! Dangers: Until RP gives the clearance the material is by definition Radioactive! CERN Location: Is the experimental hall and not an office 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list BUFFER ZONE EHN1 Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Claude Pesce DGS/RP

Michael JECKEL EN-EA-EC Test beam check list Why TREC & buffer zones? Radiological control of material leaving beam areas is a legal obligation Michael JECKEL EN-EA-EC Test beam check list 29.03.2017

Michael JECKEL EN-EA-EC Test beam check list Objectives This buffer zone is reserved for the temporary storage of all material, equipment used during an experiment in EHN1 (beam-line areas & corridors), as well as small waste. Bulky equipment (e.g. beam-line elements like magnets, collimators etc.) will not be stored in the buffer zone but still has to be registered in the TREC traceability system like all other equipment. All these objects require a systematic radiological control before they can be removed from EHN1 A control takes time (might require additional analysis)  take this into account when planning your experiment Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Claude Pesce DGS/RP

Where can I find the buffer zone? Central door Jura side RP Buffer area Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Claude Pesce DGS/RP

TREC : Traceability of Radioactive Equipment at CERN Material provided in the buffer zone: -Touch screen and bar-code reader for TREC -Traceability paper forms (yellow folder) in case the computer system does not work -Bar-code labels -Plastic bags to wrap dirty or oil-stained equipment -Cupboard for the temporary storage of small items Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Claude Pesce DGS/RP

Michael JECKEL EN-EA-EC Test beam check list In the buffer zone one can always find paper forms for traceability. Their use is obligatory if the computer system is not working. Otherwise the web-based system should be used! Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Claude Pesce DGS/RP

Usage of bar-code stickers for the identification of equipment Take a bar-code sticker from the dispenser and stick it onto your equipment. The bar-codes are unique and identify the equipment until its end-of-life. If your material is already identified with such an MTF bar-code, there is no need to put on another one. The material is already traced and only the information asked by the TREC system needs to be provided. Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Claude Pesce DGS/RP

Placement of potentially activated material Place the material on the upper two compartments of the shelf if the size & weight allows. The lower two compartments are reserved for material already controlled by RP Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Claude Pesce DGS/RP

Michael JECKEL EN-EA-EC Test beam check list How to use TREC? Traceability of Radioactive Equipment at CERN Visit the safety course web-site for a tutorial & video demos on how to use TREC http://sir.cern.ch Michael JECKEL EN-EA-EC Test beam check list 29.03.2017

How to use the buffer zone in EHN1? The buffer zone in EHN1 should be used for temporary storage of ALL material (including waste) coming from beam-facilities (fenced beam-line areas & adjacent corridors). Procedure to be followed: All people with valid access rights to building 887 automatically have access to the buffer zone ATTENTION : access to the buffer zone requires identification with your DIS dosimeter! The material must only come from EHN1 and not from other buildings Dirty or oil-stained material should be wrapped in the provided plastic bags For the placement of material the responsible must fill out the information required by TREC or, if the computer is unavailable, the paper forms found in the yellow folder (tel. nr. is obligatory) All registered material will be systematically controlled by RP An e-mail with a link to the results of the control is automatically generated and sent to the equipment onwer If the material is found to be radioactive the appropriate labelling will be done by RP IF THE MATERIAL IS NOT PICKED UP WITHIN ONE WEEK AFTER THE CONTROL, THE RP GROUP RETAINS THE RIGHT TO ARRANGE FOR THE DISPOSAL OF THE EQUIPMENT Michael JECKEL EN-EA-EC Test beam check list 29.03.2017

Michael JECKEL EN-EA-EC Test beam check list TREC can be accessed from any computer at CERN via the following link: www.cern.ch/trec A direct link is also available via: www.cern.ch/rp-lhc or simply type «TREC» in your browser Michael JECKEL EN-EA-EC Test beam check list 29.03.2017

Electronic locks in control rooms Michael JECKEL EN-EA-EC Test beam check list 29.03.2017

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list http://gs-dep.web.cern.ch/en/content/Electronic_locks

Michael JECKEL EN-EA-EC Test beam check list https://espace.cern.ch/service-access-control/SitePages/MainDefault.aspx 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Online reader @ R1 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Online reader @ R2 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Online reader @ R3 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Online reader @ EHN1 29.03.2017 Michael JECKEL EN-EA-EC Test beam check list