Commercial Office Building

Slides:



Advertisements
Similar presentations
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
Advertisements

Prof. Dr. Ramdan Abdel Maksoud Pharos University Faculty of Engineering Architectural Department.
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
Robert Adkins Et 493 Dr. Kris Koutsougeras Advisor: Dr. Rodi.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
RESTORATION OF A PNEUMATICALLY CONTROLLED END-OF-ARM-TOOLING (EOAT) FOR CLASSROOM TEACHING Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class:
ET 493 – Senior Design Southeastern Louisiana University Jarrett Johnson Mechanical Engineering Technology Instructor: Cris Koutsougeras Advisor: Mohammad.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Baldcypress and Water Tupelo Tree Pot of Protection (POP) By Clyde Walker Jr. INSTRUCTOR: DR CRIS KOUTSOUGERAS ADVISOR: DR. JUNKUN MA FINAL PROPOSAL PRESENTATION.
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
3D Imaging Software Brad Boldizar, Aubrey McKelvey, and Mackenzie Thomas Advised by: Dr. Paul King Matt Moore.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
SAE MINI BAJA PROJECT Suspension design Ryan Schech Advisor: Dr. Ho-Hoon Lee Instructor: Dr. Koutsougeras.
DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
Wind Turbine Support Structure Benjamin Boyett ET 493 Senior Design I Advisor – Dr Mohamed Zeidan Instructor - Dr. Cris Koutsougeras 05/09/2014.
Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Dr. Cris Koutsougeras Advisor: Edward Rode.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Cris Koutsougeras Advisor: Edward Rode.
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
HUNTING CAMP FACILITY BY: Ryan Fremin ET 493 Senior Design Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
HUNTING CAMP FACILITY BY: Ryan Fremin ET 494 Senior Design II Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
CS-EE 481 Spring January, 2007 University of Portland School of Engineering Project Enterprise Biggerfoot Textbook Exchange Team Andrew Elliott Robert.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
Work Related to Senate Bill 2202 (effective January 1, 2001)
 Presented by: Stephen DeMatteo  Engineering Technology, Construction  ET- 494 Fall 2014  Advisors: Ed Rode Cris Koutsougeras.
Steel Fabrication & Erection of Belle Chase Primary School Proposal – Fall 2015 ET 494 – Senior Design II Derek Duhon Instructor: Dr. Koutsougeras Advisor:
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
RESTORATION OF A PNEUMATICALLY CONTROLLED END-OF-ARM-TOOLING (EOAT) FOR CLASSROOM TEACHING Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class:
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
AUTOMATED ROD SINGULATION SYSTEM Student: James Welch Concentration: Mechanical Class: ET-494 Spring 2015 Instructor: Dr. Cris Koutsougeras Advisors: Dr.
ET 494 – Senior Design II Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
CUCSA Workgroup Chair Orientation
Design of a Commercial Shopping Center
Protective Crane Design
Commercial Office Building
Multistory Office Building
Designing a Commercial Shopping Center
Commercial Office Building
Design of a Commercial Shopping Center
Floating Semi-Self Sustaining Housing Unit ET494
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
School of EE and Computer Science
CPMGT 300 STUDY Lessons in Excellence--cpmgt300study.com.
BIS 221 RANK Education for Service-- bis221rank.com.
Instructor: C. Koutsougeras
Welcome.
Senior Design Project Office Building
Patrick Roach Robert Arena ET-493 Fall 2014 Advisor: Rudolph Rode
SAE MINI BAJA PROJECT Suspension Design Analysis
Ethics in Evaluation Research & IRB
By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras
Commercial Office Building
NEW MEDICAL FACILITY BUILDING
R10 Annual General Meeting
Requirements Engineering
New Medical Facility Building
EPA: The Campus Rainworks Challenge Subtitle
Multi-Family Fourplex Apartment
Bob's Burgers, Hammond Louisiana
CEN 5011 Advanced Software Engineering
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
Presentation transcript:

Commercial Office Building Design and Construction Instructor: Dr. Cris Koutsougeras Advisor: Mr. R. Edward Rode’ By: Jeffrey McIntyre Joshua Achee Tamara Rozenbaum T.

Not the actual building

Purpose The purpose of our project is to demonstrate everything that we have learned during the past few semesters in the Construction Engineering Technology Program at Southeastern Louisiana University. Our goal is to engineer, design and develop a commercial office building. This project will include every step, process and procedure that a real-world construction project would require, including construction estimates, site survey, plans, drawings, calculations and schedules that will satisfy and demonstrate the understanding of the construction and engineering industry.

Estimate Program: Microsoft Excel

Planning & Scheduling Software: Primavera

This Semester’s Deliverables This semester we will begin the process of planning and designing the construction of a Commercial office building. First, we will research possible locations for the office building. After establishing a site for the office building, we will perform a site survey. Next, we will research the state and local building codes that need to be followed in order to begin construction. Finally, we will make use of AutoCAD or other engineering software to deliver the preliminary design and drawings of the office building.

Building Assessment The office will be a one story building The purpose of the building is for use as an office by a small/medium size company. The building will be approx. 5000 sq. ft. and will include a parking lot that is approx. 10,000 sq. ft. Floorplan, partitions and spaces will be design to our customer needs.

Site Location Airline Hwy. Barringer Foreman, Baton Rouge, LA 70817

Site Location Airline Hwy. Barringer Foreman, Baton Rouge, LA 70817

Timeline January 26, 2017 – Meet with advisor February 2, 2017 – Research Project February 9, 2017 – Work on Proposal February 16, 2017 – Identify Location February 23, 2017 – Research Codes and Regulations March 9, 2017 – Approve Location March 16, 2017 – Site Survey March 23, 2017 – Design/Drawings March 28, 2017 – Prepare Presentation

Conclusions In conclusion, this project will help to display the skills that we have developed while at Southeastern, and it will help to familiarize us with the type of work we may do after graduating. The research, site selection, surveys, and preliminary design that we complete this semester will provide a good foundation for the work we must do next semester to complete the construction plans and estimates. The ultimate goal over the next two semesters is to present an example of a completed construction project that is consistent with the expectations of a reputable construction company

Questions?