3 Myers Pool Rehabilitation
Winooski VT

4 Update on Project Current Phase – Preliminary Engineering
Subsurface Investigation Hazardous Testing Schematic Design Goal of this phase is to determine the Construction Cost of a new facility.

5 Timeline December – January: February – March:
Geotechnical Testing and Hazardous Sampling. Selection of Features and Amenities. February – March: Finalizing Preliminary Drawings Construction Pricing Remaining Project Milestones: Approximately 6 Months for Final Engineering Approximately 1 Year for Construction

6 Description of Proposed Design
Complete removal of existing pool, filter building and partial demolition of the existing building. Two new pools – Competition Pool and Family Pool. Renovated Bathhouse with new addition. New Pool Deck. ADA access and accessible facilities.

7 Proposed Pools Competition Pool Family Pool Six lane competition pool.
Depths 4 FT to 8 FT. Family Pool Beach Entry Depths 0 FT to 4 FT Interactive spray features Amusement Park style Water Slide

8

9 Proposed Building Utilize existing foundation and rough timber roof Structure. New Mens & Womens Locker Rooms plus Family Changing Rooms. Accessible Bathroom for Landry Park Patrons Community Room and Concessions New Reception and Entry Area Filter Room Facility

10

11

12 Site Layout