Southeastern Louisiana University Rainworks Et-493_01. Spring-2018 Instructor: Chris Koustageras Advisor: Edward Rode’ By: Travis Long, Sara L. Phelps, and Tim Reedy Subtitle

2 EPA: U.S. Environmental Protection Agency
The Campus Rainworks Challenge: Reduce & treat stormwater Manages wet weather impacts Water treatment system Move stormwater away from built environments Delivering environmental, social, and economic benefits

3 Ponds The retention (wet)pond permanently holds a pool of water.
The detention (dry) pond is usually dry. Retention and detention ponds will take stormwater runoff to prevent flooding, contain the surge, releases it slowly to surrounding water sources, and helps prevent downstream erosion.

4 Equipment Pumps Maintenance Cleaning Supplies
Alternatively water system

5 Regulations CODES PERMITS PROCEDURES

6 Site 1 University Center Site 2 Site 3
Zone AE - An area inundated by 1% annual chance flooding, for which BFEs have been determined. A: Zone AE are areas that have a 1% probability of flooding every year (also known as the "100-year floodplain"), and where predicted flood water elevations above mean sea level have been established. Properties in Zone AE are considered to be at high risk of flooding under the National Flood Insurance Program (NFIP). Site 2 Site 3 Site 4

7 First Site Who: Tim Reedy Location: North Campus
Problem: standing water Plan: Retention pond Picture

8 Second Site Picture Travis Long North Campus Standing water
Detention Pond

9 Site 3 Who: Sara L. Phelps Location: North Campus Problem: Stormwater
Plans: Retention Pond

10 Site 4 Who: Travis Long, Sara L. Phelps, and Tim Reedy
Location: The under road walkway Needs backup pump Find new backup pump

11 February March April Done: Researched the Rainworks Challenge
Found out troubled areas Picked sites Research retention & detention ponds March Approve sites and/or change any State laws City codes Survey April Combine Research Predesign Use AutoCad or Rivit to layout pond

12 “Think globally, act locally”
Contact information: Travis Long Sara L. Phelps Tim Reedy Thank you!!!!! “Think globally, act locally” -David Brower (1st Director of Sierra Club)