WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements

Slides:



Advertisements
Similar presentations
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Advertisements

RP 65 and other API Activities on Carbon Capture and Storage Co-authors: R. Sweatman, S. Crookshank. M. Parker, S. Meadows, K. Ritter, B. Bellinger Presented.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 May 7, 2015.
Evaluation Process. Why an Evaluation plan now at the beginning of our project? Now that you have been successful it allows you to re-confirm the objectives.
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
HECSE Quality Indicators for Leadership Preparation.
Development of an API Specification for Float Equipment API Spec 10 F.
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.
RTF Measure Life Guidelines Subcommittee Meeting 31 January 2012 Discussion Materials / SERA.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
19th January 2012 Don Wells (Hess)
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair.
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –
API 19 CI Chemical Injection Devices for Downhole Applications
API 2017 Exploration and Production Winter Standards Meeting
API 19 CI Chemical Injection Devices for Downhole Applications
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2017 Winter Meeting Progress Report.
API SC 10, Work Group 13 Update:
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10, Work Group Update:
API SC19 HPHT Template (Proposed as SC19TR1)
TG Chair: Mark Brinsden Shell
API SC 10, Work Group 3 Update:
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
Updates from SC18 Summer Meeting
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
API 14L Specification for Lock Mandrels and Landing Nipples
Chemical additive solutions to overcome challenges and create value
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2017 Summer Meeting Progress Report.
2017 Exploration & Production Winter Standards Meeting
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing Phase IV
2016 Exploration & Production Standards Conference Subcommittee 10
Task Group on Mechanical Behavior of Cement
Specification on float equipment
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
Accredited Standards Committee C63® - EMC
2016 Exploration & Production Summer Standards Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2018 Winter Meeting Progress Report.
WG on Composite Cements: Calgary Meeting 2017
2016 Exploration & Production Summer Standards Conference
17 April 2018 Progress report ccc General capacity requirements for SAIs for conducting IT audits.
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
API SC6 Valves and Wellhead Equipment
API SC 10, Work Group 13 Update:
Today Members Workgroup charge/ Current Status Discussion.
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Today Members Workgroup charge/ Current Status Discussion.
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2019 Winter Meeting Progress Report.
API SC 10, Work Group 13 Update:
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2017 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair 18 Jan 2017

Outline Charge Membership Old business Efforts-conference calls Document progress Forward plans Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Charge Identify literature and gaps associated with well plugging and abandonments for both offshore and onshore environments. Present findings to serve as foundation to develop a RP. Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Membership Joe Shine, Chair, Saudi Aramco Jerry Calvert, Advisor, Consultant Dave Stiles, ExxonMobil James Heathman, Shell Erick Cunningham, BP Matt Goodine, BP Dan Mueller, ConocoPhillips Jamie Reid, Occidental Ramy Eid, Repsol Andre Garnier, Total Anthony Badalamenti, CurisTec Antonio Bottiglieri, BH Gunnar DeBruijn, SLB WC Jones, CTE Clara Mata, 3M Paul Sonnier, Superior/CSI Cam Matthews, C-FER Tech Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Old business Motion to accept the Washington D.C. meeting minutes Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Efforts August 31, 2016 conference call Participants: Summary: Result: Occidental, ExxonMobil, ConocoPhillips, BP, Shell, D.G.Calvert SLB, BHI, CurisTec Summary: “Line-by-line” review of document outline Active discussions on subject matter content for sections Further refinement of sections to clean up document Discussed E3 efforts will help populate appropriate sections Result: Revised outline with content for sections sent out to WG Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Efforts January 4, 2017 conference call Participants: Summary: Result: Occidental, ExxonMobil, BP, Shell, Total BHI, CurisTec Summary: Discussion of outline sections for participation Active volunteering and assignment of most sections Brought in E3 content help populate based upon last draft Result: April 30, 2017 deliverable date for first draft of sections Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Document progress Scope Normative references Terms, definitions, symbols Application and operating variables Material consideration for barriers Installation Evaluation and verification criteria Annex A Software placement simulations B Bibliography Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Document progress Application and operating variables 4.1 Formation types 4.1.1 Potential flow zones [E3] 4.1.2 Usable water sources [E3] 4.1.3 Natural seals [ConocoPhillips] 4.1.4 Injectable and depleted zones [E3] 4.2 Positions 4.2.1 Seal restoration [BP] 4.2.2 Formation pressures and strengths [BP] 4.2.3 Open hole completions [E3] 4.2.4 Cased hole completions [E3] 4.2.5 Casing shoe [E3] 4.2.6 Casing stub or liner top [E3] 4.2.7 Useable water sources [E3] 4.2.8 Sub-sea vs. direct access [Shell] Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Document progress 5.1 Temperature and pressure [Aramco] Material consideration for barriers 5.1 Temperature and pressure [Aramco] 5.2 Pumpable sealants [Shell] 5.3 Natural/Earth [ConocoPhillips] 5.3.1 Collapsible formations 5.3.2 Qualification of sealing capacity 5.3.3 Field development 5.4 Mechanical [BP] 5.5 Environment [Occidental] Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Document progress Installation 6.1 Placement methods 6.1.1 Well trajectory [Aramco] 6.1.2 Displacement 6.1.2.1 General [E3] 6.1.2.2 Pump and pull [BP] 6.1.2.3 IBOP [BP] 6.1.2.4 Sacrificial work string [Occidental] 6.2 Best practices [ExxonMobil – lead, Occidental, CurisTec] 6.2.1 Plug’s 6.2.2 Squeeze’s 6.2.3 Thru-tubing Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Document progress Evaluation and verification criteria 7.1 Annulus 7.1.1 Pressure matching/PJE [Aramco] 7.1.1.1 Software [Aramco] 7.1.2 Cement evaluation tools [TR1] 7.2 In-pipe 7.2.1 Physical or mechanical tests [E3] 7.2.1.1 Workstring 7.2.1.2 Wireline 7.2.2 Hydraulic tests [E3] 7.2.2.1 Positive 7.2.2.2 In-flow Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Document progress Annex A Software placement simulations [Aramco] Annex B Bibliography [WG] Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Way Forward End of April expected first deliverables Chair to follow up with volunteers on efforts Monitor E3 progress, chair to populate sections Solicit E3 feedback from WG if further build out is required for the RP Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM

Thank you Motion to adjourn? Joe Shine - WG 05 - 2017 E&P Winter Std Mtg – SC10 - CSOEM