New Economy Breakfast Briefing 6 December 2016

Slides:



Advertisements
Similar presentations
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Advertisements

Towards a Worcestershire Green Infrastructure Strategy WPEG, 5 September 2012 Marta Dziudzi Planning Policy Assistant Strategic.
Copyright 2009 Northumberland County Council Northumberland Local Plan Core Strategy Update Riding Mill Parish Council 28 April.
Last Gasp John Baker the potential of spatial planning to contribute to air quality.
A Green Infrastructure Strategy for Rochdale MBC.
A Masterplan for the Regeneration of Bradford-Shipley Canal Road Corridor.
Sustainable growth and water cycle studies Andy McConkey, principal consultant, Halcrow Paul Hickey, growth and equivalence manager, Anglian Water Gerard.
Wiltshire Green Infrastructure Strategy. What is green infrastructure? The Wiltshire Green Infrastructure Strategy Wiltshire’s existing green infrastructure.
Settlement Boundaries Where do they come from? What do they do? What is the future?
Department of Planning and Community Development Corporate Plan: Government priorities we contribute to Building friendly, confident and safe.
Aberdeenshire Local Development Plan 2016 Identification of issues.
Presentation to the Executive of the Carlisle Partnership 13 July 2009.
Copyright 2009 Northumberland County Council A Neighbourhood Plan for Broomhaugh and Riding Peter Rutherford, Northumberland.
Integrated Policy Modelling: supporting strategy planning from local to regional Brian MacAulay West Midlands Regional Observatory.
Salford Draft Core Strategy Graham Gentry Head of Spatial Planning.
National Planning Policy Framework Member Briefing 1 st May 2012 Mark Russell Planning Advisory Service.
Natural England State of the Natural Environment, Strategic Direction refresh, and Manifesto Dr Helen Phillips, Chief Executive, Natural England.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Red Rose Forest. The origins of Red Rose Forest One of 12 Community Forests across England Launched in 1992 as a Partnership of 6 Local Authorities and.
Greater Manchester Strategy Rebecca Heron and Rod Fawcett GM Integrated Support Team 12 April 2013.
 Scotland’s National Transport Strategy A Consultation.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
Infrastructure planning Sustainable Development Partnership 21 April 2009 Sustainable Development Partnership work programme discussion Designing the social,
Wycombe Development Framework How do we see Wycombe in 25 years time? Flackwell Heath Residents Association 29 March 2005.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
Shenstone Neighbourhood Plan Working Groups launch event 18 th June 2013.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
SWIFT NETWORKING MEETING: NEW EASTERN VILLAGES (NEV) 24th September 2015 Samantha Howell Strategic Allocations Planning Manager and NEV Programme Lead.
Regional planning I local plan I design & regeneration I transport planning I research & information Southend-on-Sea Core Strategy Development Plan Document.
Sustainable Development and Neighbourhood Plans Chris Gooding and Bill Bloxsome Data Orchard/Community First.
Salford Core Strategy Eccles Political Executive Briefing 14 November 2008.
An area of significant change and identified as: Placeshaping in West Hampstead Area of Intensification in the London Plan Work completed and underway:
Item 6: Progress report - Greater Nottingham Aligned Core Strategies - Strategic Regeneration Framework.
Herefordshire Local Plan Members’ Seminar 9 October 2015.
Nigel Hannam and David Phillips Parish Conference – 11th September 2013 Balancing Development.
Strategic Planning in Cambridgeshire and Peterborough Councillor Peter Moakes Chair, Joint Strategic Planning & Transport Member Group John Williamson.
DRAFT INNER MELBOURNE ACTION PLAN Presented by Elissa McElroy IMAP Executive Officer January 2016.
MHPP Forum James Shuttleworth Planning and Infrastructure Manager, MCC 9 December 2015 Greater Manchester Spatial Framework.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Greater Nottingham Aligned Core Strategies Option for Consultation (15 th February until 12 th April 2010) Karen Shaw Nottingham City Council.
The National Planning Policy Framework: what it means for you.
Item 3 South East Plan and recent policy statements…
19th November 2015 Wealden Local Plan – Issues, Options and Recommendations East Hoathly with Halland Parish Council.
March 2016 Helen Smith Freight in the City Greater Manchester Logistics & Environment.
Orientations towards the Scoping Paper H2020 Transport Programme Committee Brussels, 22 June 2016 SMART, GREEN and INTEGRATED TRANSPORT.
UNCLASSIFIED Lift the living standards and wellbeing of all Victorians by sustainably growing Victoria’s economy and employment and by working with the.
Maria Machancoses Programme Director
West of England Joint Transport Study
Broadclyst Neighbourhood Plan
West Midlands Combined Authority: Seizing the Opportunity
Delivering transport and growth
MMETAG Conference - Marston Vale 2050
Draft Babergh Mid Suffolk Joint Local Plan
Simon Williams Footprint Futures 2 November 2015
A future benefit for the South Cheshire infrastructure
Simon Warburton Interim Strategy Director, TfGM.
The Regeneration of Swanley
Shaping the future of Laverstock and Ford Parish
KEYNOTE STAGE SPONSOR.
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
The New London Plan Rob McNicol Greater London Authority.
Darlington Local Plan Darlington Partnership 11 July 2016.
A future benefit for the South Cheshire infrastructure
New Southwark Plan: Area Visions and Site Allocations Consultation
Cullompton Neighbourhood Plan
Delivering a World Class Heartland:
Biodiversity, Natura 2000 & Green Infrastructure in the Regional Policy Mathieu Fichter European Commission, DG Regio Team leader "sustainable.
Agenda – What we will be covering today
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

New Economy Breakfast Briefing 6 December 2016

Over the next twenty years there is a need to deliver continued sustainable economic growth, creating more jobs and new homes for the people of Greater Manchester. Greater Manchester’s local authorities are working together to deliver this growth to ensure new homes and jobs are provided in the right places with the transport infrastructure (roads, rail, Metrolink) to support communities and manage growth sustainably. By having a plan, greater control over land allocation will ensure development of new homes comes with investment in roads, school places, green spaces and public transport. Without a plan, development would happen in any case, without capturing benefits for local communities. In other words, a place with a plan is a place with a future.

GM Investment strategy Place-based settlement The GMSF in context GM STRATEGY Increasing productivity across GM Creating the conditions for growth A new relationship between citizens and the state Clarity and agreement on the investment needed to accommodate and promote growth. Ensuring GM has the infrastructure to unlock our key housing and employment sites Driving higher level skills and higher levels of company growth, including changing the nature of work done in GM Integrated local services, ensuring GM residents are supported to take advantage of the opportunities growth brings GM Spatial Framework GM Investment strategy Public Service Reform Informed by a robust evidence base Place-based settlement

The GM Spatial Framework: timetable Draft Plan – October 2016 Publication Plan – June/July 2017 Submission to Secretary of State – November 2017 Examination and Adoption 2018

The GMSF is a plan for growth … Sustainable growth Greener growth Inclusive

The draft GMSF structure Vision and Strategy Strategic Locations Thematic Policies Allocations

Vision – ‘an Even Greater Manchester’ focused on major economic, social and environmental improvements supports long term prosperity as well as meeting short term needs ensures all residents share in the benefits of growth planning for high levels of economic growth, driving the economy of the north of England providing over 227,000 new homes building a resilient Greater Manchester, improving our green infrastructure network, reducing carbon emissions by 60%, addressing air quality, reducing flood risk Strong and continuing emphasis on directing new development to brownfield land in urban locations, minimising need to travel but need to release land from greenbelt –focus on small number of large sites

Key diagram

Thematic Policies Delivering the strategy Industry and warehousing Offices Retail, leisure and tourism Housing Accessibility Trees and woodland The lowland wetlands The uplands The green belt Heritage Waterways Carbon Air Quality Design space Resilience Recreation Flooding and water quality Nature Education and skills Health Green Infrastructure Social inclusion Infrastructure

Delivering a Successful Greater Manchester Maximise development in most sustainable locations Secure redevelopment/reuse of previously developed land and buildings Deliver improved infrastructure, facilities, environmental quality for existing neighbourhoods Consider use of CPOs, direct development to accelerate development in urban areas Sites outside of urban area must complement regeneration and fund infrastructure needed to support development Infrastructure and other policy requirements need to be reflected in land value Consider use of CPO, Mayoral Development Corporations to achieve quality of development required

Employment land

Green Infrastructure network

A Plan for Sustainable Growth the GMSF has a primary objective of delivering sustainable development strategy will require significant investment in transport, to improve public transport links as well as improve highway reliability, increase opportunities for cycling and walking social infrastructure – schools, health, recreation essential element Building in resilience – reducing risk of flooding, supporting measures to improve health and social inclusion

Accommodating growth Urban first Over 70% of housing supply in and around our towns Opportunity to modernise employment supply

Call for sites 2015/16

Site Selection Criteria make the best use of any spare infrastructure capacity in the urban area ensure a range of housing sites across Greater Manchester to meet a variety of different housing requirements meet market demand for housing and attract skilled labour meet the future demands of the economy deliver the necessary levels of new infrastructure to support sustainable communities through to 2035 and beyond minimise the effects on strategic green and blue infrastructure such as the river valleys and uplands maximise the potential of new development to enhance green and blue infrastructure

Site Allocations with current Green Belt

GMSF – total land supply

GMSF Supporting Documents Greater Manchester Strategic Housing Market Assessment October 2016 Economic Evidence Report Employment Requirement Approach Accelerated Growth Scenario Summary Report Economic Forecasting Summary Economic Deep Dive Research Summary Town Centres Topic Paper Natural Environment Historic Environment Minerals and Waste Issues Green Belt Assessment 2016 Flood Risk and Water Management Evidence Paper Options Consultation Report Integrated Assessment Scoping Report Integrated Assessment of Strategic Spatial Options Habitats Regulation Assessment Spatial Energy Plan Industrial and Warehousing Site Prioritisation Framework Engagement Statement with Neighbouring Authorities Approach to Accommodating the Land Supply Shortfall

Consultation update Since the 31 October 30 local events with 26 more planned 60 tweets delivered through 236k searches (accounts) 12 dedicated topic blogs delivered through on the platform and medium 845 subscriptions to the GMSF e-newsbulletin 41 news articles in the local press 25k users have accessed the Objective portal 190 responses on objective 30 letters Almost 1000 emails in our in-box

Emerging Key Messages Congestion on the motorways and key route network A public transport system that serves people with access to places we want to go More parking at Metrolink stations Access to greenspaces Address surface water flooding and blocked culverts Provide genuinely affordable homes Ensure that well designed new homes are built and that local communities have a say in designing them What about the 72% of land already identified? Develop brownfield land first Provide more primary school places Better access to GPs and health care