Conventional Facilities and Siting Global Group (ARCFS)

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Advertisements

Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
ILC GLOBAL SYSTEMS MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
ILC CFS AD&I Daresbury Lab Summary
Technical Design Report preparation
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Conventional Facilities and Siting Global Group (ARCFS) Americas Region Conventional Facilities and Siting Global Group (ARCFS) Americas Region Update V. Kuchler

Overview Current R&D Plan Milestone Status ARCFS Responsibilities for TDP II Near Term CFS Plan for FY 10 Summary

ILC CFS R&R Plan Milestones

Specific Milestone Status Process Water and HVAC Value Engineering Completed in FY 09 Q2 Main Linac Tunnel Configuration Alternative Investigation Completed in FY 09 Q4 Complimentary Life Safety and Egress Study for the Main Linac Tunnel Alternatives was Also Completed in FY 09 Q4 ARCFS Design for Accelerator Design and Integration Study Completed in FY 10 Q1 Criteria Gathered in Two Separate CFS/Area System Workshops at SLAC and the Daresbury Laboratory, UK A New Baseline 2-D Layout was Completed by the Americas Region CFS Group in FY10 Q1 A 3-D Overall Machine Layout is Currently Being Generated for the Americas Region Sample Site Review and Improve Surface Building Facilities Criteria Study Currently Underway with Completion Due FY 10 Q4

Americas ILC Baseline Design Single Main Linac and Damping Ring Tunnel and Connecting Beam Transport Tunnels Service Tunnel and Tunnel/Enclosures for e- & e+ Sources, Ring to Main Linac (RTML) and Beam Delivery System The Americas CFS Group will Develop a Design Solution for Both the Klystron Cluster (KCS) and Distributed RF System (DRFS) Alternatives Life Safety and Egress Requirements do not Require Tunnel Compartmentalization and Consequently Large Supply and Exhaust Air Ducts are not Required

Evolution of ILC Baseline Design

More on Single Tunnel Life Safety While Most Regions do have Regulations that Directly Control Traffic Tunnel Design, in the Americas Region Two Distinct Codes have been Developed NFPA 130-2007, Standard for Fixed Guideway Transit Systems NFPA 520-2005, Standard for Subterranean Spaces Based on NFPA 520, the Main Linac Single Tunnel Must be Divided into “Building” Space (i.e. Functional or Operation Space) and “Common” Space (i.e. Space Used Only for Exit Travel to the Surface) A 2 hr Firewall and 1-1/2 hr Fire Doors Must be Used to Separate the Two Spaces Alcoves are Also Required in the Common Space to Limit the Distance to an Exit or Area of Refuge to 610 m

More on Single Tunnel Life Safety cont. The Americas Region Main Linac Single Tunnel Life Safety Solution is Supported by an Independent Fire Protection Consultant Report Which Uses Available Applicable Fire Safety Codes This Report will be Supplemented by a Computer Generated Model for Smoke Development and Egress Scenarios for both the KCS and DRFS RF Configurations Expected to be Completed by FY 10 Q4 The Final Life Safety and Egress Design for the ILC if Sited in the Americas Region Cannot be Completed Until a Specific Site is Chosen and an Approving Authority has been Established

Americas Region KCS and DRFS Americas Region KCS 4.5 m Dia. Americas Region DRFS 5.2 m Dia.

Americas Areas of Refuge

ARCFS Responsibilities for TDP II The Final TDP II ILC Baseline has not yet Been Established Proposals from the AD&I Efforts are Still Under Consideration The Americas Region CFS Group will Continue to Respond to These Adjustments to the Baseline Design for Both KCS and DRFS Alternate RF Systems The ARCFS Group will Participate in the Scheduled Baseline Assessment Workshops (BAW 1&2) in September, 2010 and January 2011 It is Anticipated that a Final Approved TDP II Baseline will be Completed by the End of 2011 ARCFS Efforts will be Primarily Devoted to the Completion of the CFS TDP II Design Solution, Revision of the CFS Cost Estimate and the Completion of the CFS Portion of the Technical Design Report for the Americas Region Sample Site

Near Term ARCFS Plan for FY 10 Complete the Surface Building Facilities Criteria Study Complete the Americas Region 3D Machine Layout Refine the Criteria and Design Solutions for the CFS Mechanical and Electrical Systems Repeat CFS/Area System Workshops from Last Year at SLAC and Daresbury Laboratory, UK Engage, Through the MDI Panel, Both Detector Collaborations to Establish Point of Contact and Criteria Requirements for the ILC Interaction Region Complete the Life Safety Computer Model Analysis Complete a Tunnel and Enclosure Lining Study for the Americas Sample Site

Summary Comments The Americas Region Continues to Make Good Progress on the Development of the TDP II Baseline Machine Layout in Conjunction with the CFS Global Design Effort It is Important that the Technical R&D Effort Makes Timely and Definitive Decisions in Order for the ARCFS Group to have Adequate Time to Revise and Adjust the Enclosure Layout to Accommodate Required Changes Available ARCFS Resources will be Used to their Maximum Benefit to Develop the Most Comprehensive Design Solution Permitted Specific Site Investigation for the Americas Sample Site is not Included in any Planning Prior to 2013