Electronics & Machine Shop

Slides:



Advertisements
Similar presentations
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
The Silicon Vertex Detector of the Belle II Experiment
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
Department of Semiconductor Detectors HEPHY Scientific Advisory Board 21 Oct Thomas Bergauer.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
Institutional Responsibilities HEPHY – CMS Management Meeting June 20, 2013.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Electronics/DAQ for SVD2+SVD3 KEK, 17 Nov 2004 Manfred Pernicka, HEPHY Vienna We want to investigate penguins!
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
University of Nova GoricaBelle Collaboration S. Stanič, STD6, Sep , 2006 Status of the Belle Silicon Vertex Detector and its Development for Operation.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
1 Oct 2008 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Vertex 2005, Nikko Manfred Pernicka, HEPHY Vienna 1.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
XFEL In-kind Review Committee Meeting, 11 May 2009 Parliament British Museum XFEL clock and control system In kind contribution proposal Development and.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Project group CMS - Inner Tracker HEPHY Scientific Advisory Board October 21, 2010 Josef Hrubec.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
AMC13 Project Status E. Hazen - Boston University
The Jülich Digital Readout System for PANDA Developments
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Development of the CMS Silicon Strip Tracker Readout
Markus Friedl (HEPHY Vienna)
Iwaki System Readout Board User’s Guide
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Example of DAQ Trigger issues for the SoLID experiment
Commissioning of the ALICE-PHOS trigger
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
The CMS Tracking Readout and Front End Driver Testing
The LHCb Front-end Electronics System Status and Future Development
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

Electronics & Machine Shop Markus Friedl HEPHY Scientific Advisory Board 21 October 2010

Mission Statement Development & maintenance of high-tech electronics & precision mechanics for HEP experiments Electronics: In-house circuit design, assembly, firmware development and testing Mechanics: Precision machining of prototypes and small series Support for CMS-Trigger, CMS-Tracker, Belle and Outreach projects 21 October 2010 Markus Friedl

List of Members Electronics Machine Shop 13 persons, 10.5 FTE 7 permanent staff, 4 limited contracts, 1 diploma student, 1 emeritus Head: M.Friedl Members: B.Arnold, H.Bergauer, M.Eichberger, I.Gfall, C.Irmler, M.Pernicka, J.Pirker, B.Rahbaran, S.Schmid, T.Schreiner, H.Steininger, T.Taurok Machine Shop 2 persons, 2.0 FTE 1 permanent staff, 1 limited contract Members: M.Oderits, R.Stark Some of the group members 21 October 2010 Markus Friedl

Skills Schematics design, PCB layout Testing Assembly Machining Software development FPGA programming & simulation Beam tests 21 October 2010 Markus Friedl

Equipment (highlights) BGA soldering machine CNC milling machine 8 GHz real time oscilloscope Pick & place machine Vapor phase soldering machine 21 October 2010 Markus Friedl

Present Activities CMS Belle II Outreach Trigger & Pixel: firmware improvements, maintenance Trigger & Pixel: R&D for CMS upgrade Belle II Silicon Vertex Detector for Belle II: R&D for detector module, mechanics, cooling, readout & control system Outreach Animated LHC wall poster (6 x 6 m2) Interactive hands-on LHC model 21 October 2010 Markus Friedl

Present Activities – CMS Trigger PSB_opt (Pipelined Synchronising Buffer) 3.2Gb/s optical links instead of cable (unreliable) Trigger upgrade Migrate from VME to µTCA (modern telecom standard) „One board fits all“ – only single (few) hardware card(s) with variety of firmware Xilinx Virtex 6 FPGA Matrix Module switch μTCA OPTICAL I/O DDR2/3 21 October 2010 Markus Friedl

Present Activities – CMS Tracker Pixel-FED upgrade Continuous improvement of firmware with collisions Firmware modified for heavy ion mode Digital optical link instead of analog Partly re-using existing components 21 October 2010 Markus Friedl

Present Activities – Belle II R&D Origami Chip-on-Sensor Concept Thinned readout chips (APV25) on sensor Flex fanouts wrapped around the edge for readout of rear side strips All readout chips are aligned  single cooling pipe Shortest possible connections  high signal-to-noise ratio ~60cm Ladder configuration 21 October 2010 Markus Friedl

Present Activities – Outreach Interactive hands-on LHC model Animated LHC wall 21 October 2010 Markus Friedl

Present Activities – Teaching Equipment Cosmic muon setup Scintillators can be rotated Will be used for student’s course at TU Vienna 21 October 2010 Markus Friedl

Timeline of Papers, Talks and Posters Technical Publications as of 21 October 2010 (until today) 21 October 2010 Markus Friedl

Achievements Belle II CMS M.Friedl is co-convener of the Belle II Silicon Vertex Detector group M.Friedl is editor (and main author) of the chapter Silicon Vertex Detector of the Belle II TDR CMS CMS Achievement Awards (19 March 2010): T.Taurok M.Pernicka J.Erö (CMS Trigger) 21 October 2010 Markus Friedl

Recent Sales Equipment purchased by others Several APVDAQ standalone readout systems (total value 45k€) Customers 2009–2010: Osaka, Kyoto, Santander, KEK, Seoul Interactive hands-on LHC model (total value 6k€) 2 orders from national science exhibitions Animated A0 LHC wall picture (total value 8k€) 2 orders from Karlsruhe and Museum of Technology Vienna 21 October 2010 Markus Friedl

Future Plans Belle II CMS Outreach Production of full silicon vertex detector (together with semiconductor group) with mechanics, cooling and complete readout chain CMS Trigger: Development of Global Trigger for CMS upgrade Tracker: Upgrade of Pixel-FED Outreach New, improved spark chamber for our exhibitions Generic (motivated by Belle II and CMS) Fast serial links FPGA design & simulation, embedded programming 21 October 2010 Markus Friedl

Thank you for your attention.

Backup Slides 21 October 2010 Markus Friedl

Belle II – Origami Module Some Objects Made by Us CMS – Analog Optohybrid Belle II – Origami Module Belle II – Thinned APV25 CMS – Pixel-FED CMS – Global Trigger Outreach – Spark Chamber 21 October 2010 Markus Friedl

Completed Projects DELPHI NA48 Outreach CMS Belle FCA & VFT subdetectors LTD electronics boards NA48 Clock distribution Calorimeter trigger 960 MHz-ADC system Outreach LHC2008 exhibition CMS Drift Tube Trigger Global Muon Trigger Global Trigger Central Trigger Control Analog Optohybrid Pixel-FED Belle FADCs for Silicon Tracker (SVD2) 21 October 2010 Markus Friedl

Present Activities – Belle II R&D Full readout chain to DAQ To be designed and built by HEPHY Prototypes exist for all stages Origami module FADC+PROC VME Repeater box Data processing and hit time finding (~3ns RMS) in FPGA firmware 21 October 2010 Markus Friedl

Completed Projects – LHC2008 Exhibition GRID globe (live data) LED- animated 3D-LHC model Light queue (data transfer from CMS to GRID) CMS Optohybrid mobile 21 October 2010 Markus Friedl