WG Composition: WG Convener: Bjørn Gustavsen

Slides:



Advertisements
Similar presentations
Online System for Compiling Member Comments July 2010 Near East Regional Workshop.
Advertisements

PIANC RecCom Working Group 15 The Use of Alternative Materials in Marine Structure Construction By Terence M. Browne, P.E.
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
JWG A2/B4-28 HVDC Converter Transformers Progress Report Convener: Milan Saravolac IEC SYMPOSIUM DELHI, January 2009.
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
B1 Discussion Group Meeting – 31/08/ Paris Palais des Congrès 2012 SESSION SC xx Name SC PS1/Q1: F. LESUR (France) Guidelines for prepared contributions.
Audit Committees: Experiences from a practioner by Patrick Zurstrassen, Chairman of the “Institut Luxembourgeois des Administrateurs”, Member of the IFC.
O.Gjerde WG C2/C5.05 Development and Changes in the Business of System Operators Status report from WG C2/C5.05 Ole Gjerde, Statnett Convenor September.
Second IEC-CIGRE UHV Symposium, January 2009, New Delhi
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 1 Working Group Activity Report 2014 JWG A3/B5/C4.37 System.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Working Group #3 E9-1-1 Location Accuracy December 16, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
9/4/20151 Cigre WG B1.41 Meeting Long term performance of soil and backfill of cable systems Milan, Italy Mar , 2013 Walter Zenger, USA Convener.
NATIONAL STATISTICAL COORDINATION BOARD 1 COMMENTS ON THE WASHINGTON GROUP GOVERNANCE PROPOSAL BY ROMULO A. VIROLA Secretary General National Statistical.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
1 Insert Project Title Here Tech Group Michigan Project Kick Off Date Insert Team Picture Here Insert team member names here.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
Workshop – „Large Disturbances” – 27 August – Cigre Session Paris 2012 Workshop on Large Disturbances Agenda Monday, August 27th, – Paris,
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
CIGRE JWG A2/C4.52 – High-Frequency Transformer and Reactor Models for Network Studies WG Composition:  WG Convener: Bjørn Gustavsen  WG Secretary: Angelica.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Please use this template to prepare your contribution Fill in Slide 3 – Type in the title of the presentation – Specify the number of the preferential.
Presentation of CIGRE activities Chairman SC A2 "Transformers"
Unit 5 The American Revolution Timeline
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
ISO TC268 SC1 - Smart Community Infrastructures -
Certified Evaluation Orientation
CIGRE WG C4.28 Extrapolation of EMF measurements
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
Transplant Nurses’ Association Education Day
WG Composition: WG Convener: W. A. Radasky
VCCS – Peoplesoft hrms Employee self-service
Section Secretary Peter Eckstein R1 Secretary
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Request time off How this policy works….
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
Accredited Standards Committee C63® - EMC
Online System for Compiling Member Comments
Medical Student Application for a $1,000 Innovation Grant
SEFOS Fill Instruction
2003 LFS ad hoc module on lifelong learning
Presentation of new accounting process
Unit 5 The Russian Revolution
Kick-Off Presentation Name of Project Manager Date
90-day Action Plan Template
25.50 million Images/day Annualized =
Chair: Petter ÅSMAN Secretary: Thomas VERCAMMEN
CUSC Amendment Panel Recommendation
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Thing / Person:____________________ Dates:_________________
Meeting of the Directors of Social Statistics Board June 2016
EPS Student Chapter Annual Report
EPS Student Chapter Annual Report
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
Corresponding Secretary Training 2019
Calendar Overview – Phase I – REVISED April 2019
GRB informal group R51.03 Annex 10
Presentation transcript:

CIGRE JWG A2/C4.52 – High-Frequency Transformer Models for Non-Standard Waveforms WG Composition: WG Convener: Bjørn Gustavsen WG Secretary: Angelica Rocha Number of members: 24 Number of corresponding members: 4 Number of countries represented: 16 Number of members from industry/utilities: 18 Number of members from university/R&D: 13 WG Timeline: Start Date: August 27, 2014 Expected Date for Submitting Final Report to SC Chairman: August 27, 2018

CIGRE WG A2/C4.52 – High-frequency transformer models for non-standard waveforms Future Activity: Kick-off meeting on August 27 Two annual meetings of 2-3 days duration Next meeting: Trondheim, Norway (tentative) Other Items: None