Presentation is loading. Please wait.

Presentation is loading. Please wait.

Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System.

Similar presentations


Presentation on theme: "Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System."— Presentation transcript:

1 Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System conditions for and probability of Out-of-Phase Convener: Anton Janssen (Netherlands), Secretary: Anton Janssen (The Netherlands) Year of Kick-off: 2014 Number of Members: 18 (To be approved at the next SC meeting (To be approved at the next SC meeting Regular Members: 6Corresponding Members:12 Retiring Members: New Members: Proposed for approval by SC A3, B5, C4 1.Mirko Palazzo (CH), RM 2.Manie van der Staden (RSA), cM 3.Dyke Monyane (RSA), cM 4.Sean McGuinness (IRL), RM 5.Helio Pessao (BR), cM

2 Study Committee A3 HIGH VOLTAGE EQUIPMENT Technical activities & discussion items First meeting in Arnhem, October 2014: 5 members present but an inspiring meeting with main focus on system and (generator) protection behavior. Exchange of much literature, standards, instructions, tutorials, grid-codes, etc. Note: many corresponding members and many young members, but 8 utility members and 3 from university/research (6 manufacturers). Still asking for members from Canada (HQ, Hydro-One). Maybe a new member from Sweden. Special attention for large disturbances, where systems fell apart with afterwards a number of mis-synchronization events. Also for small disturbances that happen quite often, but here nomenclature still forms a problem. Further the requirements for generator protection (and the generator itself), where a balance has to be found between saving the power system and saving the power plant (is pole slip allowed for and how many?). This is a preferential subject for the SC B5 Session in 2016. CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 2 JWG A3/B5/C4.37

3 Study Committee A3 HIGH VOLTAGE EQUIPMENT WG Meeting schedule WG meeting: 1st meeting, Arnhem, the Netherlands, 6 and 7 October 2014 2 nd meeting, Dortmund, Germany, April 15 and 16, 2015 3 rd meeting to be decided. Also to be decided on a special meeting during the SC A3 & B3 Colloquium for the corresponding members from Japan First step will be to write a scoping document. CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 3 JWG A3/B5/C4.37

4 Study Committee A3 HIGH VOLTAGE EQUIPMENT Publications none CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 4 JWG A3/B5/C4.37

5 Study Committee A3 HIGH VOLTAGE EQUIPMENT Membership to be approved at the next A3, B5, C4 meetings Last NameFirst NameCompanyCountryStatus JanssenAntonLianderThe NetherlandsRM (Convenor) KubisAndreasTU DortmundGermanycM JonesKevinSouth-Western Public Service CompanyUSAcM WillièmeJean-MarcAlstomFranceRM PatelAmitGE EnergyUSAcM WeiskerJanSiemensGermanycM WangZhenhuaAEPUSAcM AprosinKonstantinProsoft-Systems Ltd.RussiaRM De VilliersFrancoEskomRSAcM KitauchiYoshihiroCRIEPIJapancM PoggiGiorgioEdFFranceRM SuganumaShinichiTEPCOJapancM YoshimotoSaoriToshibaJapancM PalazzoMirkoABBSwitzerlandRM Van StadenManieEskomRSAcM MonyaneDykeEskomRSAcM McGuinnessSeanEPRI InternationalIrelandRM PessaoHelioONSBrazilcM CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 5 JWG A3/B5/C4.37


Download ppt "Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System."

Similar presentations


Ads by Google