City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No. 4114 & 4115.

Slides:



Advertisements
Similar presentations
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON
Advertisements

THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Quality Pavement Preservation Projects
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Board of Commissioners Meeting
2016 Mill and Overlay Project
2nd Street Drainage and Paving Improvements
Agenda Updates to Driveway and Sidewalk specifications and permits
Week 3, March 13, 2017.
Town of Brighton, Department of Public Works
Bond Oversight Committee
Gladewood Bridge Summary: Built in 1920 Crosses the Yellow Creek
Lynnhaven Parkway Widening Project Update
City of San Jacinto 7th Street Pavement Repairs
June 5, 2017.
General Road Construction Information
Location Map.
2017 Reconstruction of Northfield Street
Manchester’s CSO Program: A Look Behind and a Look Ahead
Street Improvement Plan
City of Bloomfield Hills
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Public Information Meeting NW 100th Street Reconstruction Project
Consolidated Plan Amendment Wednesday, May 10, 2017
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Proposed Certificates of Obligation Issue
SW Gage Blvd - Street Repair Project
Project Scope of Work Project Contacts
City of Katy – Pine Forest Workshop Update
Participatory Road Program neighborhood meeting Donahoo 174th Street
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
Proposed Certificates of Obligation Issue
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Agenda Introductions: Roadway Focus Group - Jennifer
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Town Council Strategic Planning Session
Meadow Lane – Brandon Road Improvements Welcome!
Walker Street Reconstruction Project 25% Design Public Hearing
Robincrest/Elmgate/ Linneman Improvements Welcome!
2019 Capital Program Title of Presentation
City of Spruce Grove Capital Region Partners Presentation 2019
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
ACEC Designer Training
Larimer County: engineering
Presentation transcript:

City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No. 4114 & 4115

2017 Orinda Paving Project Measure J & L Repairs – approximately $8.5M Residential Streets are funded by City’s 2014 Measure J Funds ($20 million general obligation bond) & 2012 Measure L ½ cent sale tax increase that provides approximately $1 million each year Annual Pavement Repairs – approximately $1M Work on Collector & Arterial Streets are funded by Gas Tax and Countywide Transportation Sales Tax Return-to- Source (RTS) funds Streets selected through City’s Pavement Management Program and recommended for construction by the Citizen’s Infrastructure Oversight Commission and approved by the City Council

2017 Orinda Paving Project 88 48

2017 Orinda Paving Project 65 Streets all over the City Split into 5 Packages Work includes: Drainage improvements – ditches, inlet & pipe work Full Depth Reclamation of Roadways (FDR) New Pavement Construction Re-installation of Pavement Delineation Preliminary Utility Relocations, prior to FDR Work Home Owner Responsibilities Prior to Construction: Verification of Sewer Lateral – Notices Sent Check / Clean Drainage Systems Trim Vegetation back from edge of roadway Only a rough schedule is known at this time Two more years of Roadway Improvements scheduled for the summers of 2018 & 2019 Maps are available

2017 Orinda Paving Project Drainage Improvements will be performed first Work will follow a geographical order Work Includes Full and Partial Replacement of: Storm Drain Pipes Concrete Curbs & Lined Ditches Asphalt Dikes & Curbs

2017 Orinda Paving Project What is Full Depth Reclamation? 2 Week Notice Posted and a 3-day Notice by a Door Hanger Complete Drainage Improvements and any Utility Relocations first Pulverize existing roadway to a 12- inch depth, half the roadway width at a time to maintain access Remove approximately 3-inches of pulverized material Treat with cement, add water & mix Grade and compact Cure for 3-7 days with temporary driveway ramps in place 3-inch of AC Paving to complete VIDEO NEXT SLIDE

2017 Orinda Paving Project Schedule – when will the work take place on my street? Current tentative schedule will be to start in Package 4 & 5, provided PG&E work meets their current schedule Most traffic in these areas Miner Road Closure Then move to Packages 1 through 3 Generic Schedule Information: April/May/June: start-up, pothole utilities, survey May/June/July: drainage improvements June/July: FDR work for Package 4 July/Aug: FDR work for Package 5 Aug/Sept: FDR work for Package 3 Sept/Oct: FDR work for Package 2 Oct/Nov: FDR work for Package 1

Why Replace My Lateral? Root intrusion can quickly clog your sewer. Sags allow grease & debris to settle & accumulate forming a blockage. Most homeowners insurance plans don’t cover the costs of a sewer backup. Not sure if you have a problem… - Get a video inspection of your lateral.

Side Sewer Replacement Call multiple plumbing contractors for quotes. Get a permit from Central San.

2017 Orinda Paving Project Who should I contact if I have questions? Steve Patterson at 510-701-0319 or spatterson@park-eng.com Farah Khorashadi at 925-253-4282 or fkhorashadi@cityoforinda.org Schedule updates will be available on the City’s Webpage: www.cityoforinda.org We will also use Next Door for neighborhood notifications