1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.

Slides:



Advertisements
Similar presentations
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Advertisements

Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Brackish Groundwater Desalination in Texas J. Kevin Ward.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Ontario Problem Gambling Research Centre April 1, 2010.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Month/Date Budget Calendar Activity Responsibility Beginning January 2010 Prepare Budget Calendar and Budget Plan for review. CFO, Superintendent.
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Indirect Potable Reuse Public Outreach Framework Jolene Walsh Senior Director, Public and Governmental.
Management System Consulting Services Chris Teague, CPSM June 17,
1 EASTERN MUNICIPAL WATER DISTRICT Implementing the MWD Water Supply Allocation Plan for Sub Agencies Elizabeth Lovsted, PE Sr. Civil Engineer.
EASTERN MUNICIPAL WATER DISTRICT San Jacinto Groundwater Basin Numerical Flow Model Update Brian Powell Director of Planning March 17,
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Brine Concentration Pilot Project (AquaSel) Update
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
CHANNEL ISLANDS BEACH COMMUNITY SERVICES DISTRICT
AquaSel Brine Concentration Pilot Project Update
TVRWRF 23 MGD Expansion Disinfection System Conversion
Water Booster Station Improvement Study
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) Update Kelley Gage June 15, 2016.
CONTRACT AWARD TO ALTA PLANNING AND DESIGN FOR CONSULTANT SERVICES TO CONDUCT SAFETY OUTREACH AND UPDATE THE SUGGESTED ROUTES TO SCHOOL MAPS FOR THE SAFER.
2015 Urban Water Management Plan Overview
Sun City Lift Station Odor Control Improvements
Capital Plan Update and Five-Year CIP
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Joe Mouawad, P. E. September 7, 2016
Cottonwood Recycled Water Pipeline (West)
Winchester Lift Station Odor Control Project
Analysis and Calibration of Sewer Flow Tenant Type Factors
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Water Loss Audit Findings (FY 13-14)
Perris Water Filtration Plant Membrane Upgrade – Phase I
Santa Ana River Conservation and Conjunctive Use Program- Prop 84 Grant Funding Contract Kelley Gage March 9, 2017.
Kelley Gage Sr. Director, Water Resources Planning April 7, 2016
District-Wide Well Maintenance, Rehabilitation, and Repair
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
Memorandum of Understanding with GE Osmonics, Inc
Sustainable Groundwater Management Act
Phase 3 Solar Feasibility Study Findings and Recommendations
Enterprise Content Management Owners Representative Contract Approval
Policy Principles for the Allocation of Recycled Water
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Reach 4 Air Valve Replacements Award of Construction Contracts
Cyclic Storage Agreement with Metropolitan Water District and Rancho California Water District Kelley Gage October 12, 2017.
Santa Ana River Conservation and Conjunctive Use Program Update
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
City-wide LED Street Light Conversion Program
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Delta Water Supply Project
San Diego Housing Commission (SDHC)
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Is the Bay Area Ready for Potable Reuse?
Presentation transcript:

1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016

2 | emwd.org Background Pilot Study of the AquaSel Brine Concentration Technology was completed in August 2015 AquaSel is a proprietary process by GE which uses Electrodialysis Reversal (EDR) and a precipitator Tested 10 gallons per minute (gpm) pilot plant Pilot testing was conducted over a nine-month period (1,890 hours of run time)

3 | emwd.org Summary of Pilot Study Findings Demonstrated success processing EMWD’s brine The pilot identified some areas that require optimization – Precipitator process and sizing – Filtration of the recirculated feed to the EDR – Hydraulic flow balance – Miscellaneous electrical systems and instrumentation systems Average TDS of pilot plant product water was approximately 1,900 mg/L – Compatible with raw well water for blending – May be used as potable water if desalted

4 | emwd.org Configuration of Existing Desalters

5 | emwd.org Proposed Configuration with Perris II Desalter

6 | emwd.org Product Water Utilization Alternatives Alternative 1 – Blend with Desalter Product “New” Water, AFY618 AF Product TDS670 mg/l X X

7 | emwd.org Product Water Utilization Alternatives (cont’d) Alternative 2 – Add Secondary EDR “New” Water, AFY1,828 AF Product TDS560 mg/l

8 | emwd.org Product Water Utilization Alternatives (cont’d) Alternative 3 – Blend with Perris II (RO) X “New” Water, AFY940 AF Product TDS650 mg/l

9 | emwd.org Product Water Utilization Alternatives (cont’d) Alternative 4 – Recycle to Feed Perris II (EDR) “New” Water, AFY2,291 AF Product TDS500 mg/l

10 | emwd.org Estimated Cost of Water (1)Based on 15-year duration (2)Relieved capacity amortized over 30 years at 5 percent Base Case Menifee, Perris I & Perris II Alternative 1 Direct Blending Alternative 2 New Secondary EDR Alternative 3 Blend with Perris II RO Alternative 4 Feed to Perris II EDR “New” Water, AFY-6181, ,291 Total Annual Cost$5,026,000$6,270,000$5,026,000$6,439,000 Unit Cost of “New” Water, $/AF -$8,135$3,430$5,344$2,811 MWD (LRP), $/AF (1) - ($475) Reduction in Brine, $/AF (2) $1.03 M/yr($1,096)($231)($720)($344) Net Unit Cost of “New” Water, $/AF - $6,564$2,725$4,149$1,992 Unit Cost of all Water, $/AF (1) $1,294$1,383$1,371$1,356$1,346

11 | emwd.org Proposed Next Steps Conduct a larger AquaSel Demonstration Project: Validate the process at a larger scale utilizing one full-size AquaSel module Sized for 100 gpm 1/16 of a full-scale 2.3 mgd plant This demo unit will: Include full scale components Refine the design and sizing of the precipitator Utilize the same EDR stack as a full-scale plant Confirm the AquaSel process has been optimized for a full-scale plant Validate preliminary estimates for operating costs

12 | emwd.org AquaSel EDR Unit Demonstration project: 100 gpm Full plant: 1600 gpm (2.3 mgd) * Precipitator not shown 100 gpm

13 | emwd.org Grant Funding for AquaSel Demonstration Project Staff submitted a grant request to the U.S. Bureau of Reclamation (USBR) under the Desalination and Water Purification Research and Development program. o $400,000 over two USBR fiscal years o Grant application is pending. Staff anticipates award by September Senior Management met with USBR Management and staff to present findings of the pilot and discuss future collaboration.

14 | emwd.org Proposed Engineering Support Services Staff received a proposal for engineering services in support of the project from a combined team of CH2M and Carollo Engineers in the amount of $249,700. The consulting team provides the combined experience with the prior AquaSel pilot project, existing Desalters, and future Perris II Desalter. The team will also assist in negotiating with GE for the procurement of the equipment.

15 | emwd.org Consultant Scope of Work Assistance with negotiating for the equipment and services from GE. Preparation of the preliminary demonstration project protocol to ensure the design of the demonstration equipment will meet the project objectives. Preparation of a technical memorandum addressing permitting and regulatory issues using the proposed technology to concentrate brine. Assistance and support with seeking additional grant funding from the USBR and the State of California under Proposition 1. -USBR staff has indicated more funding may become available. Preparation of construction contract drawings and specifications.

16 | emwd.org Project Schedule Board Award of Consultant Agreement May 2016 GE Equipment Procurement July 2016 Preliminary Protocol Development July 2016 Complete 100-Percent Design September 2016 Advertisement of Construction October 2016 Board Award of Construction* November 2016 Begin Demonstration Period* February 2017 End Demonstration Period* June 2018 * Schedule dependent upon identifying and securing additional grant funding to support implementation of the demonstration project.

17 | emwd.org Recommendation Board approve and authorize the following: Execution by the General Manager, or his designee, of the District’s standard form of contract with CH2M for the design of the AquaSel Brine Concentration Demonstration Project; and Appropriation of $290,700 for CH2M and Carollo Engineering Services.