Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.

Slides:



Advertisements
Similar presentations
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Advertisements

LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
Information Technology Project Management
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Injector De-cabling Project Project Team Meeting #
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
1 1. Some recent views ( ) 2 Linac tunnel
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
NEW EN-EL SPECIFIC DATA IN PLAN 08/02/2017
Linac4-PSB 160 MeV connection readiness review
Cabling for LHCb Upgrade
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Identification of the unused cables
EYETS LHC 2016/2017 Works EN/EL/CF
Injector De-cabling Project
TE-MPE LS1 review Vision from EN-EL(CF)
Injectors BLM system: PS Ring installation at EYETS
EC Activities Status for the LIU
YETS & LS2 Reminder G. Girardot 20 juin 2017.
De-cabling strategy during YETS
prepared by R.A.Barlow 30/056/2016
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
GIS Portal Racks Project
LIU-SPS review for BI (no BWS)
ILO Industrial Opportunities Days, 6-7 June 2019
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL

EL Services: Cables: Fiber and Cabling Signal cables DC Power cables Fiber optics Power: Project and works Cable containment (Cable tray/ladder) Infrastructure (Transformers/HV) Distribution: Projects Minor works 2J. DevineLIU Ions – meeting 09/03/2016

Cabling requests Taken from EDMS by Georgi Minchev Georgiev EN-EL-FC Attention - only 3 fibres requests for the moment! -LIU shall ensure correct insertion of all activities in PLAN tool – works & projects with sub works -LIU shall ensure creation of the transitory budget codes and their feeding via TID -LIU shall provide before end of March 2016 the expected work volume (No of cables, average length) needed for FTEs estimation Long Shutdown Commissioning Operation Technical Stop YETS 2015 EYETS 2016 * YETS 2017 LS2 *Be ready by end of 2016 in the event of possible full linac4 connection Today we are here -LIU shall provide before end of September 2016 pre-requests for budget envelopes estimation -All definitive requests (DIF, DIC, DIR, DEC) shall be submitted before 21/12/2017

Cabling Requests 4J. DevineLIU Ions – meeting 09/03/2016 Formal inputs: DIC = Demand d’Installation Cable DIR = Demand d’Installation Rack Pre-DIC/DIR if exact requirements are not known See next slide for requirements & EDMS links Process: Cost estimation, creation of transitory budget code Ordering of required cables (up to 1 year lead) Combination of activities into campaigns, by zone Planning and execution of works

Templates EN-EL-CF Cables removal requests (DEC) template: EDMS: DIF “Demande d’installation fibre optique” template : EDMS: DFP “Demande de fourniture de Patchcords” template: EDMS: Procedure for identification of unused cables on the CERN site: EDMS: Demande d'Installation de Racks (DIR): EDMS: DIC - Demande d'Installation de Câbles - EDMS: How to fill in a cables request (DIC)? - EDMS: J. DevineLIU Ions – meeting 09/03/2016

Status of EL Power support activities 6J. DevineLIU Ions – meeting 09/03/2016 Requirements capture: Plan + LIU lists Initial estimations (or detailed based on ECR if available) Detailed estimate/quote Scheduling Execution

LIU Actions – Ions, Linac 3 & 4 7J. DevineLIU Ions – meeting 09/03/2016 Italics = Linac 4 works from Plan

LIU Actions – EL Summary PSB/PS/Ion 8J. DevineLIU Ions – meeting 09/03/2016 Input requirements from LIU: Consolidation of LIU lists & Plan Plan reference numbers Predecessor/precursor tasks from Plan ECR development Risk of unforeseen EL activity in items not declared in Plan but on LIU lists. Communication between EL and ECR authors to be encouraged. Specific requirements for FC: Declaration in PLAN for cabling/fibres DIC/DIR process to start with users Specific requirements for power distribution: Declaration in PLAN + LIU task list for follow up by EL.