1 prepared by R.A.Barlow 30/056/2016
CERN TE-ABT-EC LIU-ABT systems: PSB BI.DIS10 controls Agenda: General controls (Roger Andrew Barlow) Timing system (Christophe Chanavat) IGBT’s R&D program (Tobias Stadlbauer & Luc Sermeus) Fast interlocks studies (Felipe Cordobes Dominguez) prepared by R.A.Barlow 30/056/2016

2 Generator prototype, Jura 6
BI.DIS10 Generator prototype, Jura 6 Status of technical progress PLC program improvement Recipe's added for settings Some functionalities sill to be implement New TIA library item for automated state machine control (in SCL) To be desired in nearby future: Integration of the triggering optical module inside the PFN Optimization of capacitive dividers pickups Fast interlocks integration Review of logical connection to BIS ongoing (1 channel Vs. 4 channels) …still to be discussed by MPE group, now this looks more like 1 BIS system !

3 Slow control and cabling production
BI.DIS10 Slow control and cabling production PLC controls production 95% PLC modules ordered, arrived ! + a few extra’s ... FSU jobs created for the following: ABTECMAINT-48 Installation components BI.DIS10 in BCER (Linac4/LS2) ABTECPROD-18 Cablage des 6 PFN pour le BI.DIS10 (Naked shells ready) – September 2016 ? ABTECPROD-20 JURA6 BI.DIS10 patch traversant prototype (Change-over proto) – HW done ABTECPROD-21 Pre-production series for PLC crates BI.DIS10 (Master, OP, GPC, EDS) – on-going FSU jobs created for the full production: ABTECPROD-22 Production of series PLC crates for BI.DIS10 (Outside) ABTECPROD-25 Patch panel de series pour BI.DIS10 au BCER (Outside) ABTECPROD-19 Cablage des unites casette IGBT pour le BI.DIS10 (CERN?) Chassis drawings and cabling drawings done, aim to have all this ready by end of MAY-2016 (on-time). PDC production envisaged for September..., however and due to CL workload this will probably be realised in December 2016

4 PP prototype design for generator changeover
BI.DIS10 PP prototype design for generator changeover PP for generator changeover strategy Status of technical progress PP prototype cut out done Improvement for coaxial feedthroughs, new inserts supports 5mm coax, improved attenuation factor, lower risk of reflections... Still to be carried out, modification to JURA6 cage to adapt switch-over strategy.

5 JU6 H/W for Timing and FSC
BI.DIS10 JURA6 HW status JU6 H/W for Timing and FSC KiT’s timing system FSC system Status of technical progress Identified rack space for KiT’s system and FSC Removal of old manual earthing switch Technix PS to be lowered New Ethernet connections demands

6 PFN shells cabling BI.DIS10 PFN ‘shells cabling’
Status of technical progress Empty PFN shells, to be taken advantage for cabling (prior to coil assembly) Needs all fans + ‘new’ fan assembly Have all the PT100’s To be cabled as per new drawings

7 DIC/DEC and UPS systems
BI.DIS10 DIC/DEC and UPS systems DIC/DEC issues Status of technical progress DIC completed (99.9%), sent to EN/EL Nearly 600 cables ! (guestimate on-par) DEC to be finalized, pre inspection of number of cables in existing BI.DIS + campaign during EYETS to mark cables to be removed and file into a DEC. UPS systems RA302 UPS + standard outlet RA303 RA304 RA305 RA306 RA435 RA301 RA329 RA328  Standard outlet

8 BI.DIS10 Planning review

9 BI.DIS10 Documentation PBU-MSMIA-ES Functional Specification BI.DIS10 Controls (EDMS ) Released PSB-MSMIA-ES Engineering Specification BI.DIS10 controls (EDMS ) Under approval/In Work PSB-MSMIA-ES Engineering Specification, Beam Interlock Specification For Booster BI.DIS10 with linac4 (EDMS ) In work PSB-MSMIA-ES Functional Specification, BI.DIS10 Fast interlocks (EDMS ) Engineering check PSB-MSMIA-ES Engineering Specification, BI.DIS10 Fast interlocks (EDMS ) In work PSB-MSMIA-ES BI.DIS10 GENERATOR SPARE CONNECTION TO MAGNET PROCEDURE (EDMS ) Under approval PSB-EQCOD-XX-XXX – Functional Specification, Operational requirements for the controls of the new distributor BI.DIS10 – EDMS ??? – In Work