Cave Tonitrum Fly, Fight, & Win B976 Walkthrough for FMS F-35 Beddown 2Lt James Buckingham 56 CES Comm: 623-856-4707 DSN: 896-4707.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Office Alterations RAF/2012/00027 Compulsory Briefing Session 01 October 2012 RAF – EcoGlades Centurion.
Working Together to Improve the Decision Making Process 2013 WTBA/WisDOT Contractor-Engineer Conference January 31, 2013.
50 th Contracting Squadron Technical Reviews. Overview Introduction Definitions Objectives Explanation of Objectives Demonstration/Application Conclusion.
 Examples of bid-splitting Acceptable – When a project involves different trades and is not interdependent on the other. - If you are upgrading a room.
ATC Conference Call January 10, 2008 Thank you for joining the call. We will start the call shortly. Please enter * 6 to mute your line and # 6 to unmute.
OKLAHOMA TURNPIKE AUTHORITY Request For Proposals Pre Bid Meeting.
Cave Tonitrum Fly, Fight, & Win Mary L. Peetz Small Business Program Specialist LUKE AIR FORCE BASE.
Fire Protection Upgrades at New Brunswick Laboratory Lessons Learned on an ASME NQA-1 Design Build Project Alexander C. Smith, PE.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
IS4799 Information Systems and Cybersecurity Capstone Project
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE November 12, 2008.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
© Nintendo Game Document Game Development - Spring
University of Wisconsin-Madison Space Science and Engineering Center (SSEC) 26 October 2005 SSEC/CIMSS Administrative Overview from Wenhua Wu, Tom Achtor.
Stennis Space Center March 2013 Amy Rice. The Food.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
Strategic Purchasing Division Operation Contracts Cost Reduction Friday March 13, 2009 Presented by Calvin D. Wells, Deputy Director Strategic Purchasing.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
Source Selection. What is Source Selection? Source Selection is the process of conducting competitive negotiations. Source Selection allows the Government.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Aerospace Ground Equipment (AGE) Support Services Pre-Proposal Conference/ Site Visit Kari M. Alvarado Contract Specialist NASA-DFRC November 8, 2006 Dryden.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00034 Date: 14 January 2013 Time: 11h00.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
1 Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Task Order Competition (TOC) Process.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
Main Building Utility Plan Phase 1 - Study PRE-SUBMITTAL CONFERENCE May 14, 2008, 9:00 AM.
Federal Acquisition Service U.S. General Services Administration One Country, One Mission, One Source COMSATCOM OVERVIEW Sheila Garrett ITIGC Meeting March.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
ATG is a web-based facility management information system, allowing authorized users to access the full range of their facility data without training in.
Eden Central School District Board of Education Meeting Eden CSD 2020 Project Update September 16, 2015.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
PCIT Training Contractor Information Session Bill Gould, Program Officer Jennifer Eckhart, Contract Compliance Manager April 18, :30pm-5:00pm.
UPGRADE RUNWAY & ELECTRICAL VAULT PRE-PROPOSAL CONFERENCE 12 July WG/LGC SELFRIDGE ANG BASE MI.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
2016 Technical Assistance Funding Workshop 1/14/16.
U.S. Department of Agriculture eGovernment Program eDeployment Kickoff August 26, 2003.
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
Presented by: CCSD Procurement Services Department How to do Business with the Cobb County School District 1.
Federal Acquisition Service U.S. General Services Administration Area Facility Operation Specialist (aFOS) 88 th Regional Support Command Pre-Bid Meeting.
Comprehensive Health Care Services – Inpatient and Outpatient Mental Health Services ITN January 27, 2016.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Department of Veterans Affairs Network Contracting Office (NCO) 21 Repair Building 1A Data Cables Pre-Proposal Conference and Site Walk Construction Request.
PRE-PROPOSAL CONFERENCE RFP - VA R-0039 AMARILLO VA HEALTH CARE SYSTEM Building 34 Room Amarillo Blvd West Amarillo, TX /18/2012.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
State of Utah Small Package Delivery Services States Kickoff Webinar
Preparation of the Self-Study and Documentation
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00034
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
REPAIR FALL PROTECTION PROJECT
Office Alterations RAF/2012/00027 Compulsory Briefing Session
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Enterprise Content Management Owners Representative Contract Approval
Overview of the FEPAC Accreditation Process
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
MPH Practicum overview February 13, 2018
MANDATORY PRE-BID MEETING
Back Ground Information
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Defining project management
Technical Communication
Overview of The Bidder Response Form and Changes to the IT RFP Template March 8, 2019.
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

Cave Tonitrum Fly, Fight, & Win B976 Walkthrough for FMS F-35 Beddown 2Lt James Buckingham 56 CES Comm: DSN:

Cave Tonitrum Fly, Fight, & Win Overview General Scope of the Project Unique Factors Protocol Deadlines Questions

Cave Tonitrum Fly, Fight, & Win General Project Scope New location for FMS F-35 training B976 will function as a Squadron Operations Facility Construction will consist of: Security spaces Mission planning areas Physical training room ALIS rooms Administration offices Pilot support areas SAPF Walls Flooring Lighting Fire suppression Mechanical upgrades Electrical modifications

Cave Tonitrum Fly, Fight, & Win Unique Factors Tight Timeline Construction Completion by end of February 2016 SAPF construction Proven to be difficult due to accreditation purposes Foreign Mission The success of these projects will demonstrate the USA’s ability to host allied military training

Cave Tonitrum Fly, Fight, & Win Protocol All questions responses will need to be addressed to all of the MACC contractors There will be no undocumented questions Document every question from your firm during the site walk Send all questions in RFI format to the Contracting Officer James Sowden, and CC Tauny Woo, Matt Hutchings, Bill Harrick, and 2Lt James Buckingham All RFI responses will be formally sent out by one week from the last received RFI

Cave Tonitrum Fly, Fight, & Win Protocol Each MACC Awardee to provide: Technical Narrative Schedule Schedule can be submitted on any software to best illustrate detail. Price Proposal The Price proposal will be submitted on AF Form 3052 with all fields filled in. For the first year, all Task Orders will be evaluated solely on best value

Cave Tonitrum Fly, Fight, & Win Deadlines 14 January: All RFI’s from MACC contractors are due 21 January: Government responses to RFI’s are due 30 January: All MACC proposals are due 13 February: Award date Note: All deadlines are due at 1600 (4:00 PM) Arizona time

Cave Tonitrum Fly, Fight, & Win Questions?