Environmental Requirements for Supply of inline Gas Filters on GIS balancing pipe Compiled by: Silindile Mbhele.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Contractor Management. Struggling with Contractor Management ? ? ? Getting purchasing on board? Specifically stating environmental compliance in contracts?
EMS Checklist (ISO model)
Checking & Corrective Action
Environmental Management System Implementation
[Organisation’s Title] Environmental Management System
Department of Environmental Quality Environmental Management System Overview.
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
ISO EMS Policy Statement N.C. Division of Pollution Prevention and Environmental Assistance.
Environmental Management System (EMS)
I S O A u d i t F i n d i n g s E n v i r o n m e n t a l C o n f e r e n c e B y : S y l w i a L a B u d d e.
Environmental Management System Bruce Barnard Terry Parish Teresa Woodley.
SRC/OAS Project Environmental Performance Presenter: Julia Louise Brown.
Contractor Management and ISO 14001:2004
ISO General Awareness Training
Environmental Management Systems Refresher
First Practice - Information Security Management System Implementation and ISO Certification.
Quality Management.
IMS Training on Management Standards ISO 9001, ISO 14001, and OHSAS Prepared by SL, 18/01/2011.
Applying a Systems Approach EPA Regions 9 & 10 and The Federal Network for Sustainability.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
RJC Certification - (COP 9) Bribery and Facilitation Payments Training Module – March 2014.
Environmental Management System (EMS)
ISO EMS OVERVIEW May ISO EMS OVERVIEW TRAINING Contents What is an EMS? Why ISO & Certification? EMS Basic Elements Environmental.
Introduction to ISO International Organization for Standardization (ISO) n Worldwide federation of national standards bodies from over 100 countries,
ISO 14001:2004, Environmental Management System
SECBE SDL Accelerate EMS Willmott Dixon – Ellmer Construction Month 6 – Audit and Review 7 April 2008.
ISO GENERAL REQUIREMENTS. ISO Environmental Management Systems 2 Lesson Learning Goals At the end of this lesson you should be able to: 
Agenda Corrective/Preventative Action Internal Auditing Management Review.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
The Strategic Goals Program for Metal Finishers: New Strategies for Success Environmental Management Systems (EMS) and Metal Finishers Norma Murphy DPPEA.
ISO Registration Common Areas of Nonconformances.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
IS0 ISO, International Organization for Standardization Similar to ASTM Voluntary standards But required for many situations Historically specifications.
Visit us at E mail: Tele:
ISO Most Common Problems May 25, 2000 Underwriters Laboratories Inc. May 25, 2000 Underwriters Laboratories Inc.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
Energy Energy comes in many forms including electricity, gas, oil and steam and is a resource used by organisations worldwide Energy is becoming increasingly.
13/01/2015 ANKERLIG & GOURIKWA POWER STATION STATION OCGT Tender Presented by Obert Mgwenya.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
16 July 2014 Development of Eskom Real Estate Master Plan detailing Asset Management Solution, Property Management Solution, Procurement and Financial.
Quality Management Supplier Quality Requirements Clarification Meeting Civil work at Dinaledi Sub Station Presentation By: Mothusi Itumeleng 16 July 2014.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Visit us at E mail: Tele:
PRE-QUALIFICATION TENDER FOR THE PROVISION OF ENVIRONMENTAL SERVICES 11 JULY 2014.
23 Sept 2014 The supply of spare parts and special tools for five (5) peaking generation Open Cycle Gas Turbines (OCGT) units at Gourikwa Power Station.
Environmental Requirements for BENBURG SUBSTATION 3RD 250MVA 275/132KV TRANSFORMER - CIVIL WORKS.
GROUP CAPITAL DIVISION Majuba Rail Project Clarification meeting Insert image here Marcel Meso Date: 04 Feb 2016 Time: 09h30 Venue: UCG.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
ENVIRONMENTAL MANAGEMENT REQUIREMENTS. ISO GOU has obtained certification for ISO 14001:2004 All contractors to be ISO compliant.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
SHE Requirements for the Eskom Procurement and Supply Chain Management Process ( ) Nomusa Leburu.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
HET PRESENTATION TO THE PORTFOLIO COMMITTEE ON HIGHER EDUCATION AND TRAINING (PCHET) PARLIAMENT OF SOUTH AFRICA, CAPE TOWN 20 MARCH 2013.
Quality Management Supplier Quality Requirements The Manufacturer, testing at works and supply of various distribution cut- outs for wires business on.
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
Quality Management: Mutually beneficial supplier relationships.
Quality Management Supplier Quality Requirements Clarification Meeting Media Monitoring Mothusi Itumeleng.
ISO 14001: 2004 Environmental Management Review Presentation
4.5 Checking and Corrective Action Monitoring and Measurement
Integrated Management System
EMS Checklist (ISO model)
ISO management systems
How to conduct Effective Stage-1 Audit
Risk Management NDS Forum June 23rd 2010.
ISO 45001:2018 The importance of a Safety Management System
Presentation transcript:

Environmental Requirements for Supply of inline Gas Filters on GIS balancing pipe Compiled by: Silindile Mbhele

TENDER ENQUIRIES Buyer are to provide contractor /suppliers /service providers with: Eskom SHEQ Policy (EPC ) Eskom EMP for Supply of inline Gas Filters on GIS balancing pipe (refurbishment) rev 1 (TST (Environmental Requirements for the Procurement of Assets, Goods and Services) SHE Requirements for the Eskom Commercial Process (for additional requirements TRM-FM-0081Tender Evaluation form TRM-FM Contractor Environmental Compliance Proforma (To be signed by the contractor) This form ensures that the contractor is in compliance and also ensure that its employees, subcontractors and agents comply with, any acts, regulations, local laws and by-laws, codes of practice, South African Standards and Eskom’s SHE policy and procedures which are in any way applicable to this contract or the performance of the services under this contract. 2

STAGE 2 : ENVIRONMENTAL TENDER EVALUATION CRITERIA The environmental weighting = (threshold< 80% ) If the threshold is not met, then the tenderer would not to be recommended 3

TENDER SUBMISSION DOCUMENTATION (RETURNABLE ) Copies of the following documentation to be submitted when submitting a tender Environmental Management Plan or Method statements addressing all the environmental aspects and impacts associated with project. Please refer to Eskom EMP (TRM-TE-0231) and section 2 of the tender evaluation form (TRM-FM-0081) Signed Contractor Environmental Compliance Proforma (TRM-FM 0038). SHEQ or Environmental Policy. If the contractor has SHEQ policy, it must also include commitments to environmental compliance 4

TENDER SUBMISSION DOCUMENTATION (ISO Compliance) CONTI- Supplier can submit existing procedures Communication procedure to ensure effective communication of environmental issues with employees and client during project Internal Audit or evaluation of compliance procedure outlining the process to ensure that internal environmental audit are undertaken during the project, the checklist used, issuing and follow up on actions. Emergency preparedness plans The supplier shall identify possible emergency situations and submit effective emergency preparedness plans for all activities that could result in an emergency situations requiring urgent reaction to avert negative environmental impacts. Non Conformance, Corrective action and preventive action procedure outlining the process which ensures that organization (s) investigate environmental non-conformances to establish the cause and identify the opportunity for improvement. Management Review : Procedure or any other means (project progress meetings) used by the management to review the organization(s) environmental management system performance. Training procedure to ensure that employees are trained on the environmental legal and other requirements. Environmental incident reporting: Procedure which outline the process which ensures that all the environmental incidents (e.g. major vehicle oil leak during delivery of SF6 gas filters) during the project will be investigated to establish the cause (identify the opportunity for improvement ) and reported to Eskom. 5

TENDER SUBMISSION DOCUMENTATION (RETURNABLE) Waste Management Plan which includes the register of possible waste to be generated by the project e.g. redundant SF6 gas filters. Disposal of SF6 contaminated material must be done in a registered site (designed for that kind of waste). 6

2016/06/ QUESTIONS Thank you