FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.

Slides:



Advertisements
Similar presentations
02/06/2014James Leaver Slink Transition Card. 02/06/2014James Leaver Slink Transition Card Simple 6U board: –Provides interface between FED and Slink.
Advertisements

Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics & Astronomy The University of Edinburgh presented by Tom Davinson.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
31st July 2008AIDA FEE Report1 AIDA Front end electronics Report July 2008 Progress Virtex5 FPGA choice Milestones for prototype delivery.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
-1- Current Telescope Strengths High resolution (~2.5um) Adaptability Ease of use – Currently borrowed by SPS collimator group Weaknesses Small number.
Overview of the read-out electronics for the TPCs at T2K ND280m P. Baron, D. Calvet, X. De La Broïse, E. Delagnes, F. Druillole, J-L Fallou, J-M. Reymond,
1 Warsaw University of Technology Faculty of Electronics and Information Technology Institute of Electronic Systems HARDWARE SIMULATOR of the high-resolution.
Jeffrey Hepworth Erik Mauer Brendan Murphy David Rodriguez VEND Team VEND‘etta’
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
AGATA Pre-processing team report AGATA Week, July 2008.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
12th May 2008AIDA FEE Report1 AIDA Front end electronics Report May 2008 Progress Data compression Plan for prototype delivery.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
©F.M. Rietti Embedded Systems I Controllers Data Sheets.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
OPERA TT MEETING BRUSSELS, April 11, 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd,
Monday December DESY1 GDCC news Franck GASTALDI.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Bottom half – ch 0-5 placed & routed FE PS PROC FIFO TRIG OSC RX/SHAP ADC DAC VME.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
AIDA FEE64 production report January 2011 Manufacturing Power Supply FEE64 revision A “3 hour test” 19th January
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
FEE Electronics progress PCB layout 18th March 2009.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
KM3NeT Offshore Readout System On Chip A highly integrated system using FPGA COTS S. Anvar, H. Le Provost, F. Louis, B.Vallage – CEA Saclay IRFU – Amsterdam/NIKHEF,
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
AIDA: introduction Advanced Implantation Detector Array (AIDA) UK collaboration: University of Edinburgh, University of Liverpool, STFC Daresbury Laboratory.
CLB demonstration board & prototype tests (CLB: Central Logic Board) 1 WPFLElectronics PPMCLB F. Louis.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
A. Aloisio, R. Giordano Univ. of Naples ‘Federico II’
CLUster TIMing Electronics Part II
AIDA ASIC review Davide Braga Steve Thomas ASIC Design Group
AM system Status & Racks/crates issues
Large Area Endplate Prototype for the LC TPC
GTK-TO readout interface status
Status of the DHCAL DIF Detector InterFace Board
same for both sectors 45 and 56
10/month is the present production rate 2 FTE + sporadic contributions
Electronics for Physicists
FEE Electronics progress
Work packages status in Torino and perspectives
TPC Large Prototype Toward 7 Micromegas modules
Assembly order PCB design
AIDA: introduction Advanced Implantation Detector Array (AIDA)
FEE Electronics progress
FEE Electronics progress
Presentation transcript:

FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009

PCB Layout Progress 9th June 2009 Complete memory  95% complete – power and decoupling Gbit Ethernet.  90% complete – power and decoupling ADC output signals to the FPGA.  100% complete Discriminator signal connections to the FPGA  100% complete Mezzanine connector signal definition   60% complete Clock distribution to the ADCs  100% complete Power supply blocks and delivery planes. FPGA configuration memory. Temperature sensors, RS232, LEDs etc. April 30 th : 49% signals routedJune 9 th : 77% signals routed

PCB layout targets June 30 th : –Complete routing and layout. –Submit to manufacturer for validation and quote. –Submit to assembler for evaluation of assembly and final parts purchase. July 7 th : –Complete engineering review. July14th : –Submit to pcb manufacturer and assembler. August 17 th : –Assembled FEE64 delivered. 9th June 2009

Collaboration with Detector Systems Development Group of TBU. (Technology Business Unit ) Currently : –Gbit data rate from memory on the devkit => 240Mbit/sec. –System boots with fallback to golden copy. –Pin allocation of FEE64 memory and Gbit signals checked. Next steps : –Create a DMA peripheral and check performance. –Create a memory test and configuration system. 9th June 2009

Prototype fixture for software development Pin out and advice provided by Steve Thomas. Fixture will allow communications between the ASIC and Linux to be developed. Mux readout logic VHDL can also be developed. Design and manufacture of fixture in progress in DL electronic workshops. Delivery mid June. 9th June 2009 Fixture comprises a ZIF socket on a pcb designed to mount a packaged ASIC onto an ML507 FPGA development board.