D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.

Slides:



Advertisements
Similar presentations
1 Liverpool Production Status Week of 23 February 2007.
Advertisements

1 Liverpool Production Status Week of 02 March 2007.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
The DØ Silicon Microstrip Tracker Frank Filthaut University of Nijmegen / NIKHEF NIKHEF, 4 August 2000.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
D0 PMG 12/2/99 Fiber Tracker Status  Carbon fiber work u All support cylinders done u Some work remains on band/support pieces + work for Silicon Detector.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
Mikhail Kubantsev - Kansas State University 1 Assembly of a Large Area Microstrip Silicon Tracker Some Experience of Construction of D0 SMT H- disk Silicon.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
Status of NA62 straw electronics Webs Covers Services Readout.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
L0 Module Testing and Analog Cable What we built so far: –No.3 First prototype with SVX4 (L1 hybrid) –No.4 with irradiated sensor –No.5 Installed on the.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Si Sensors for Additional Tracker
Technical Design for the Mu3e Detector
Dave McComas on behalf of the ISʘIS Team
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Vertex Detector Mechanical R&D Design Questions and Issues
Presentation transcript:

D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report

D0 PMG, May 04, 2000 Slide 2 Ladder and Wedge Production p Axial detectors (3-chip): –Ladders being retrofitted due to grounding problem –Finishing last few ladders needed p 2 o detectors (9-chip): –Production paced by HDI availability –can restart at >8/week when HDIs received –Sensor supply not pacing production, original order complete this month »Overall supply of +2 deg. after yield may fall short »50 additional wafers entered into system for reorder »Fallback for spares: ] use sensors with higher bias resistance p 90 o detectors (6-chip): –87(/144) sensors built so far –Paced by Micron delivery, 13 delivered in so far in May p F Wedges (14-chip): –Production in progress, paced by testing –Micron order complete, ~18 spare on shelf –Eurisys order is late. »Waiting for 25 sensors to clear customs »Next batch this month p H Wedges (6-chip): –~180 half wedges produced to date –Sensor delivery on schedule –Glued 25 full wedges of which ~15 grade A –changed encapsulant to more flexible material to avoid stresses on bonds –Concentrating on full wedge production and disk assembly

D0 PMG, May 04, 2000 Slide 3 High Density Interconnect (HDI) p 9-chip hdi’s –All Be pieces needed received. –37 (34 + 3) hdi’s sent to Promex for stuffing »10 passed - ladders built »27 developed surface bubbles: ] 23 now repaired and are under test, 4 not recovered –40 HDIs at now Promex for assembly –34 flex circuits still needed from Compunetics –pacing 9 chip ladder production p F-wedge HDI’s –All components for HDI’s in hand: Be, jumpers, flex –23 HDI’s at Fermilab for wedge production –50 recently stuffed under test –26 HDI’s at Promex p H-wedge hdi’s –All flex in hand –60 being laminated –30 received from Silitronics; 20 at Fermilab

D0 PMG, May 04, 2000 Slide 4 Production Status

D0 PMG, May 04, 2000 Slide 5 Production Status for first half cylinder p All detectors for 1st 1/2 cylinder produced –not all tested, but OK assuming yields hold up p 4 flavors of 9-chip ladders; current status: “short tails”

D0 PMG, May 04, 2000 Slide 6 Barrel / Disk Assembly p 69/72 ladders installed in first barrel p May have to reground some ladders p Installation of ladders for second barrel started; 6 installed ladder installation radially outward. p First ring assembled ~5/10/2000 p Oversight on cable placement, need to reinstall some wedges p Behind schedule, but lag can be made up rapidly Barrels p Installed 4 wedges on first ring, pORC needed p CMM programming and use of rotary table understood p Mechanical assembly of first ring in the next few weeks. p Not a schedule issue H Disks Assembly Note: We haved changed our plans from the original schedule which assumed immediate integration of the 1st barrel/disk module - we will perform readout separately F Disks p Half cylinder cut p cable cut-outs being made at outside (water jet) shop p Preparing for fit-up of H disk supports in Sci-Fi

D0 PMG, May 04, 2000 Slide 7 Readout and Cabling Low Mass Cables p Readout system being prepared for full readout of barrel / disk assembly p Start with 1st F ring (rather than barrel) p Need pORC ~ next week p First test with full assembly and cooling p Channels read out limited by interface card supply, have 4, hope for 15 in June p Supply of cards for 1st half cylinder installation and testing will be insufficient, increase pre- production number? Readout p Low mass cables must be installed before move to D0. p Cable production data from Honeywell : p 820 cables started, 166 produced, 360 needed for first 1/2 cylinder (including spares) p delivery expected at 56/week p ~4 week post processing and testing p First half cylinder done ~ end of July p Cables may be pacing item in delivery to D0, watch carefully