I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Jon Chiglo, PE Project Director 2014 Construction Plans.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
State of Morrisville Mayor Mark Stohlman July 17, 2014.
Fountaingrove Parkway Summary of Recommendations November 27, 2007.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Tropicana Avenue To Blue Diamond Road I-15 South Design-Build Project Paving the Way to a More Mobile Las Vegas Presented to Las Vegas Convention and Visitors.
North Queen Anne Neighborhood Traffic Management Plan November 2004.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.
Southern Nevada HOV Plan Update ITE Luncheon July 17, 2014 Jeff Lerud, Project Manager.
Nick Johnson, PE Senior Project Manager October 1, 2012.
75 Express Lanes Project From NW 170 Street to I-595 Corridor Advisory Committee Meeting Wednesday, July 15.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Current Construction Projects Major Projects Pinellas County.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Texas Transportation Commission Presentation Scott McLaughlin, CRRMA Chair October 25, 2012.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
SANTA MONICA BIG BLUE BUS Santa Monica City Council Study Session – August 8, /30/05 Big Blue Bus Design -New Access Center Building -New Administration.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
MARCH 18, :00 A.M. CITY COUNCIL CHAMBERS 2016 TRAFFIC SUMMIT HOSTED BY: CITY OF LANSING DEPARTMENT OF PUBLIC SERVICE.
Visit Our Website at: Click to edit Master title style.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
11 Ina Road Traffic Interchange Project Update Marana Chamber of Commerce Business Connection Luncheon May 18, 2016 Greg Byres, PE, Senior Urban Project.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
US 36 Bus Rapid Transit RTD Board Update January 6, 2015.
RTD Board Update October 8, 2013 US 36 Bus Rapid Transit.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Interstate 15 North 8/17/2015 Update
Four Winds Condominium Association August 2, 2017
Transportation Conference Jason Voigt, P.E., NDOT Resident Engineer
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Interstate 15 North 4/09/2015 Update
The Oakton Condominium Association September 12, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
Highway 169 Bridge Replacement & Pavement Resurfacing
North Main Street Intersection Improvements at Route 460 Bypass
PROJ. 566(17) LOR PID MAJOR WIDENING
Contract 60X10 Informational Meeting Weber I-55
Meadow Lake Boulevard Street Extension Project
Commissioners Presentation
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Presentation transcript:

I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project

Presentation Goals 1.Provide project update 2.Review 2011 accomplishments 3.Review 2012 construction 4.Address concerns and answer questions

Project Update

2011 Accomplishments  3 miles of new concrete westbound  Drainage improvements  Widening from McCarran Blvd. to Vista Blvd.  Intelligent Transportation Systems (ITS)  Ramp meters  Sparks Blvd. loop ramp preparation  Early landscape and aesthetic improvements  Web site with live traffic cameras

Westbound New Pavement

Widening E. McCarran to Vista

Gateways Monuments Sound wall treatments Tank farm screens Vegetation Truckee Meadows Crossroads

2012 Timeline Switch Traffic March Construction Open I-80 westbound & eastbound September Landscape and Aesthetics October Project Complete December 2012

Two lanes each direction between Keystone Ave. and Fourth St. Long term (March to September) ramp closures at: I-80 eastbound Wells Ave. on and off-ramps I-80 eastbound Fourth St. off-ramp I-80 westbound Fourth St. on-ramp Center St. I-80 eastbound on-ramp (3 weeks) Extensive outreach and one-on-one meetings with stakeholders and businesses Maintenance of Traffic

Complete I-80 eastbound concrete paving from Fourth St. to Keystone Ave. Complete widening from E. McCarran Blvd. to Vista Blvd. Construct Sparks loop ramp Resurfacing E. McCarran Blvd. eastbound off-ramp Widen Rock Blvd. eastbound off-ramp Geometric improvements from I-80 eastbound to Southbound US 395 Resurfacing W. McCarran Blvd. eastbound on-ramp Widen Robb Dr. westbound off-ramp Upcoming

I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, NDOT PM, Matt Franz, Design-Builder DPM,