SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects

Similar presentations


Presentation on theme: "SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects"— Presentation transcript:

1 SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
FPID: & October 2016

2 Upcoming Resurfacing Projects on SR 60
Need: Provide safe, comfortable, and connected facilities for all roadway users Challenge: Safely accommodate mobility in a growing downtown Opportunity: Enhance pedestrian and bicycle environment through routine maintenance projects SR 60 Resurfacing Projects FPID Project Begin Date Final Design Begin Construction End Construction SR 60/Kennedy Blvd & Jackson St from Brevard Ave to Meridian Ave Mid 2014 Late 2016 Mid 2017 Late 2017 SR 60/Kennedy Blvd from Nebraska Ave to Ashley Dr Mid 2015 Early 2018 Mid 2018 Late 2018/Early 2019

3 Opportunities to Create Streets for Everyone
FDOT Complete Streets Policy (Adopted September 2014) …While maintaining safety and mobility, Complete Streets shall serve the transportation needs of transportation system users of all ages and abilities, including but not limited to: Cyclists Freight Handlers Motorists Pedestrians Transit Riders… “Our neighborhoods will be vibrant, diverse, distinctive, and safe and will be linked to each other and to the river through a series of attractive, bicycle and pedestrian connections.” InVision Tampa Center City Plan SR 60 Resurfacing Projects

4 Mobility in a Growing Downtown
Source: kenbaldwinre.com Channel District Transit Source: Encore Walking Source: Port Tampa Bay Channel District Redevelopment Channel District Source: Port Tampa Bay SR 60 Resurfacing Projects University of Tampa Source: Strategic Property Partners Channelside Waterfront Redevelopment Bicycling Waterfront District Source: Tindale Oliver

5 Jackson Street Design Alternatives
Alternative Design Concepts: Jackson Street (SR 60 Eastbound) between Ashley Drive and Nebraska Avenue Travel Lane Alternative Off-Peak Parking Alternative Hybrid Alternative Existing Condition (Typical Section) 8.5’ 11’ 5’ SR 60 Resurfacing Projects

6 Jackson Street Design Alternatives
3 thru lanes 2 thru lanes 10’ 4’ 11’ 8’ 10’ 4’ 11’ 8’ SR 60 Resurfacing Projects 2-Way Protected Bike Lane with Physical Separation Off-Peak (Non-Rush Hour) Travel Times 2-Travel Lanes On-Street Parking along Both Sides Peak (Rush Hour) Travel Times 3-Travel Lanes On-Street Parking along South Side Only 2-Way Protected Bike Lane with Physical Separation 3-Travel Lanes On-Street Parking along South Side Only

7 Traffic Analysis 24-Hour Corridor Volumes
Lane elimination (“road diet”) study: Does existing & future traffic demand require 3 travel lanes to function at an acceptable level of service? SR 60 Resurfacing Projects

8 Jackson Street Design Alternatives
Hybrid Alternative A 8’ 2’ 7.5’ 10’ 10’ 10’ 7.5’ 10’ 4’ 8.5’ 12’ SR 60 Resurfacing Projects 10’ 4’ 11’ 8’ 10’ 4’ 11’ 8’ B C D

9 Public/Stakeholder Outreach to date
Property Owners & Managers Businesses owners Tampa Downtown Partnership Committee Meetings MPO Committees City of Tampa Hillsborough County HART THEA SR 60 Resurfacing Projects

10 Public Information Workshop
Thursday, November 10, 2016 5:30 p.m. – 7:30 p.m. Hillsborough County Public Schools Raymond O. Shelton Administrative Center 901 E. Kennedy Boulevard, Tampa, FL 33602 Project Information SR 60 Resurfacing Projects

11 Questions? Cass St at Tampa St Stephen Benson, AICP, CNU-A District Government Liaison Administrator (813) Tana Johnston-Schultz, P.E. Design Project Manager (813) SR 60 Resurfacing Projects