August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
FDR 10/01 Jason Tarrant CLRC1 SCT EC Thermal Enclosure (TE) l Thermal Enclosure Function: »Make End-cap thermally neutral »Condensation free exterior »Containment.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
A.Nichols CLRC1 SCT HEX PRR ( ) Layout & Installation of Barrel off-detector HEX circuits From barrel cooling loop to PPB1 l Barrel Hex is a plain.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.

S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
R. Rucinski, Fermilab Feb. 9, 2005 Project Status 2 cassette VLPC Cryostat Russ Rucinski - Fermilab This presentation will probably involve audience discussion,
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Barrel SCT Material Budget By Alessandro Tricoli RAL ATLAS Physics meeting, 18 th March 2008.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1st Nov 2001 Nigel Hessey SCT Endcap Structures FDR1 Endcap Requirements Brief overview of SCT Endcap Requirements layout, X0, thermal, positioning, stability.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
The Mechanical Structure for the SVD Upgrade
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
SCT EC Material Stephen Haywood Rutherford Appleton Lab.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
EC: 7 DISK concept Preliminary considerations
ATLAS Internal ID Service Integration
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
End-cap Mechanics FDR Overview of the Project
? ENDCAP: Mechanics IFIC-Valencia.
ERMC/RMM activities May 2017
Services Layout – Update
Chamber Design and Integration RE3/1 and RE4/1
Tests of Endcap capillary & Heat exchangers at CERN
Presentation transcript:

August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required for Disc Assembly 2004 / Integration 2005) »Thermal Enclosure (Required for Integration 2005) »PPF1 (Required for Integration 2005 / Some parts for Disc Assembly 2004) Jason Tarrant (RAL)

August 04 Jason Tarrant CCLRC2 SCE EC Design & Manufacture l SCT EC Discs

August 04 Jason Tarrant CCLRC3 SCE EC Design & Manufacture l SCT EC Support Structure - Complete

August 04 Jason Tarrant CCLRC4 SCE EC Design & Manufacture l Support Structure Fit Check

August 04 Jason Tarrant CCLRC5 SCE EC Design & Manufacture l Support Structure Fit Check

August 04 Jason Tarrant CCLRC6 SCE EC Design & Manufacture l Support Structure Fit Check

August 04 Jason Tarrant CCLRC7 SCE EC Design & Manufacture l Load Test Load 250kg -Predicted Deflections 223um-508um -Actual Deflections ~40% higher on average but within 2x safety factor = good correlation

August 04 Jason Tarrant CCLRC8 SCE EC Design & Manufacture l Metrology, Disc Fixing Inserts & Assembly prep. ^125 – 150um from end to end (500um max. tol.)

August 04 Jason Tarrant CCLRC9 SCE EC Design & Manufacture l SCT EC Services – Being delivered / In manufacture

August 04 Jason Tarrant CCLRC10 SCE EC Design & Manufacture l Services »Flexible (LMT, Optical fibre, DCS) –Lengths determined using spreadsheets, computer simulation & physical Mock-up + independent review »Rigid (Disc Cooling, LMT Cooling, N 2 Purge) –Lengths determined in CAD, prototypes in process of manufacture (RAL / QMUoL)

August 04 Jason Tarrant CCLRC11 SCE EC Design & Manufacture l SCT EC Thermal Enclosure – Final Design

August 04 Jason Tarrant CCLRC12 SCE EC Design & Manufacture l Thermal Enclosure Parts »Inner Thermal Enclosure (ITE) –Same Design but no heaters »Outer Thermal Enclosure (OTE) –Single piece, different mounting (no mechanical force) & no cooling circuit »Rear Thermal Pad –Same design but no cooling circuit »Services Thermal Feed Through (STFT) –Same Design »ITE – Rear Support Cover –Same Design »N 2 Purge –Same design »Heaters –Final designs being tested then ready for manufacture »LMT Cooling –New, using spare ways from disc cooling

August 04 Jason Tarrant CCLRC13 SCE EC Design & Manufacture l Thermal Enclosure »Analysis / Audit –Peter Ford ATL-IS-EA-0006 »Manufacturing issues »Detail design after FDR (29/09/04)

August 04 Jason Tarrant CCLRC14 SCE EC Design & Manufacture l PPF1 – Manufactured / Final design

August 04 Jason Tarrant CCLRC15 SCE EC Design & Manufacture l LMT / Optical Fibre / LMT cooling LMT cooling connectors Back-plate for connection to Raphael’s Curved plate Optical fibre compartments Rigid back-plate Housing for PCB trays LMTs Connection to Cryostat cable tray Sides to be covered with aluminised Kapton sheet Type 2 Cable clamp Space for Type II wires

August 04 Jason Tarrant CCLRC16 SCE EC Design & Manufacture l Cooling / DCS Gas connectors DCS PCB Fixed here To PP2 All connections over R1175 break line To SCT End-cap

August 04 Jason Tarrant CCLRC17 SCE EC Design & Manufacture l Other PPF1 »Heater & Heater Sensors wires –Based on LMT PPF1 »N 2 Purge –Large diameter pipes connected with silicone sleeves