November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)

Similar presentations


Presentation on theme: "November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)"— Presentation transcript:

1 November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005) –Design –Manufacture –Assembly »PPF1 (Required for Integration 2005 / Some parts for Disc Insertion 2004) –Design –Manufacture

2 November 04 Jason Tarrant CCLRC2 SCT EC Interconnects l SCT EC Services - Design

3 November 04 Jason Tarrant CCLRC3 SCT EC Interconnects l Cooling Progress »On Cylinder Interconnect –Inlet (capillary) –Exhaust –LMT Cooling »Connections –PPF0 connections –STFT connections –PPF1 connections »Off Cylinder Interconnect –HEX assembly –Heater Assembly

4 November 04 Jason Tarrant CCLRC4 SCT EC Interconnects l On-Cylinder Interconnect »Inlet –Swagelock @ PPF1 - x72 3 or 6mm versions l CERN Supply –PPF1 – HEX – x72, 9 different types l recent change of 2mm ID to 3mm ID 5mm OD l 9 models / drawings required (includes filter), ~1 week –Filter - x72 l Paul having tested @ CERN –Hex – x72 l QMUoL –STFT connections – x72 l Paul having tested @ RAL –Capillaries - x208 l Nominal 2.5m long, to be tuned, CERN / QMUoL l All Capillary stock @ CERN, even with extra required for D7 & D8 LMT cooling –Connections at PPF0 – x208 l 230 Confirmed to be delivered to RAL 10 th November, then around 15 th November to CERN

5 November 04 Jason Tarrant CCLRC5 SCT EC Interconnects »Exhaust –PPF0 connection – x72 l ‘Quick’ samples being manufactured l Already tested see later –Tube – x72, 9 different types l All tube (for all interconnects) ‘in-stock’ l Bent tubes manufactured by Newtown Engineering for Pre-Production prototype of D1 interconnect –Elbows (interconnect only) & reducers – x72 & x144 l ‘Quick samples on order (12 th November) l QMUoL make all Elbows? –STFT connections - x72 l Paul having tested @ RAL –HEX –Heater Assembly – x72, 9 versions l CERN supply with ‘pressed-on’ copper / CuNi end for soldering to HEX –Swagelock @ PPF1 – x72 l CERN Supply

6 November 04 Jason Tarrant CCLRC6 SCT EC Interconnects l On-Cylinder Interconnect… »LMT Cooling –2 spare ways from D9 with back-up of 1 spare way from D7 & D8 –Drawings complete & out for quote (12 th November) –Tube acquired from redundant Barrel stock –Long lengths split into smaller sections around bends (more joints vs. ease of manufacture)

7 November 04 Jason Tarrant CCLRC7 SCT EC Interconnects l PPF0 connectors »Based on Helicoflex »Already tested (I.Wilmut) »Only hole for connection changes from original design l STFT connectors »Tapered PEEK seal based on Pixel design »9 inlet & 9 exhaust to be tested soon then full production l PPF1 connectors »Standard Swagelock bulkhead »To be supplied by CERN as part of PPF1 fluid installation

8 November 04 Jason Tarrant CCLRC8 SCT EC Interconnects l Off Cylinder Interconnect »Hex Assembly –HEX drawings being modified for recent inlet tube diameter change l 2 types of HEX l Higher level assembly shows connection of inlet & Heater to PPF1 l About 1-2 weeks of work –Exhaust Tube, HEX Tube, Inlet & Exhaust connectors, supplied by RAL (Filter to supply) –Inlet Tube sourced by QMUoL + manufacture of elbow to connect to Heater »Heater Assembly –CERN Supply to QMUoL »Combined Assembly –HEX & Heater to be assembled @ QMUoL then sent to CERN (Large batch?)

9 November 04 Jason Tarrant CCLRC9 SCT EC PPF1 l PPF1 Design »Rerouted to enable HEX to be mounted in SCT-TRT Gap and & Heaters in Cryostat cable tray DCS board & cables Exhaust Tubes 1175 Break line Bulkhead Plate (pre installed) Standard Swagelock Bulkhead Connectors PP2 side pre installed Routing off to PPF1 Routing from SCT Filters Type 2Type 1 Inlet Tubes

10 November 04 Jason Tarrant CCLRC10 SCT EC PPF1 l Outstanding »Routing of tube from PPF1 – PP2 to be adjusted (could be done upon assembly »Parts to be supplied to CERN by Feb 05 / June 05


Download ppt "November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)"