Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
Introduction Felix Sefkow HCAL main meeting February 14, 2006.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Hadron Calorimeter Felix Sefkow EUDET Annual Meeting October 20, 2006.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Preparation for CERN TB - Erika Garutti1 Preparation for CERN test beam H6 test beam area in Prevessin.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
The CALICE scintillator tile HCAL project Felix Sefkow LCWS’06, Bangalore March 9-13, 2006.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
1 CERN 2007 Installation and Run Plan Erika Garutti & Fabrizio Salvatore.
Calibration issues for the CALICE 1m3 AHCAL ALCPG11 - Linear Collider Workshop of the Americas Eugene, Oregon, USA 2011/3/22 Jaroslav Zalesak Institute.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Scintillator HCAL prototype commissioning and calibration J.Cvach Institute of Physics AS CR, Prague Calibration basics Test results Outlook LCWS 06.
LKr status R. Fantechi.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
the CALICE test beam set-up and running experience
CALICE meeting 2007 – Prague
Preparation for CERN test beam
HCAL task status report
10/month is the present production rate 2 FTE + sporadic contributions
ScECAL+AHCAL+TCMT Combined Beam FNAL
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Installation and Run Plan
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Testbeam analysis on module #1
Scintillator HCal Prototype
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007

Felix Sefkow April 19, 2007HCAL 2 Testbeam readiness Prototype production Commissioning Calibration and monitoring Reconstruction Analysis feedback Summary of yesterday’s HCAL meeting – thank you to all speakers for careful preparation

Felix Sefkow April 19, 2007HCAL 3 HCAL production The last package of scintillator tiles for the physics prototype arrived at DESY last week –Almost 8000 SiPMs tested, mounted and delivered –Congratulations to ITEP and MEPHI colleagues! 32 modules ready Cabling was interrupted for ~ 2 weeks due to broken machine and need for re-adjustment for cable from new producer Schedule for assembly of remaining modules made –Finish all 38 by May 23 – if no new problems –Manpower in place Repair of # 1 & 2 started –Tiles sent to ITEP for exchange of SiPMs by mid May D.David (w/ ITEP, LPI, MEPHI, DESY colleagues)

Felix Sefkow April 19, 2007HCAL 4 Movable stage is moving….! –HCAL modules 1-23 installed on stage –ECAL slabs arrive on 24 th of April: new slabs –Cabling being done: readout this week, power this/next week –1 st electronics test before end of April, check grounding HCAL modules ECAL VME HCAL VME Thorsten working K.Gadow, S.Karstensen, T.Jung

Felix Sefkow April 19, 2007HCAL 5 Commissioning CMB (LED system) tuning in May about 15 working days needed to: -check 23 CMB tuned at CERN, some minor repairs -tune 15 new CMB Study new physics mode of FE ASIC (lower noise) Adjust bias voltages for a few channles from the tails Test does not include: –Trigger system, TCMT integration, MWPC and Cherenkov r/o In the DESY Test Beam: Modules # 24, 26, 28, 30 tested last w.e.  24 repair “dead” channels Modules # 25, 27, 29, 31 installed today (scan over w.e.) Modules # to be tested when ready

Felix Sefkow April 19, 2007HCAL 6 Shipment Additional traverse beams for stage rigidity during transport and on crane work being constructed Ready for shipping on June 4 th –(Open) sea container ordered –Additional boxes for electronics and active layers Installation at CERN beam line H6b starts on June 11 –More in Erika’s talk Logistics: Gert Falley

Felix Sefkow April 19, 2007HCAL 7 Calibration & Monitoring Summary (S.Schaetzel) Depends on  V) Ivo Polak

Felix Sefkow April 19, 2007HCAL 8 Reconstruction From S.Schmidt, more in Roman’s talk HCAL reco package is getting more and more complete, e.g.: –Nicola’s muon finder, UK DC reconstruction –Calibrations, PIN data, ITEP test bench data, –Vasily’s DeepAnalysis –Cell index and alignment problems fixed –Even documentation (!) And user-friendly: Simplified installation LCIO Performance issues better understood

Felix Sefkow April 19, 2007HCAL 9 Fast feedback: optimization To optimize light yield and noise in situ (to be discussed)

Felix Sefkow April 19, 2007HCAL 10 Fast feedback: data quality E.g.: check beam energy and spread!

Felix Sefkow April 19, 2007HCAL 11 Summary All HCAL layers and movable stage expected to be in place for the 2007 test beam at CERN Detector integration, electronics and LED calibration commissioning at DESY in May prior to shipment Software is far more developped than in 2006 – some tools for fast feedback will be assembled Tight schedule – but all lights green