Presentation is loading. Please wait.

Presentation is loading. Please wait.

1234 Dec 2006 1234 Jan 2007 1234 Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.

Similar presentations


Presentation on theme: "1234 Dec 2006 1234 Jan 2007 1234 Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14."— Presentation transcript:

1 1234 Dec 2006 1234 Jan 2007 1234 Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14 Beam Test @ DESY Feb 26 ~ Mar 30 Test assembly Install LED/Temp. monitor system Prepare shipping Ship MPPCs to KNU MPPC mass check. MPPC soldering Direct-readout megastrip source scan Install LED Delivery of 500 MPPCs Megastrip assembly Fabrication of megastrip layer components Prepare MPPC mass check system KEK Megastrip bench test Fabrication of Frame / light shielding structure Finalize module design MPPC study (response curve) Contact DESY (DC gas, safety issue, etc) Schedule toward the SC-ECAL Beam Test @ DESY Establish LED / Temperature monitoring system Analysis code / Event display Prepare Trigger / Veto counters

2 Measure MPPC response curve, check variation ECAL module construction –Make mega-strip layer assembly ECAL frame and light shield construction MPPC mass measurement Mega-strip source scan Establish / install LED monitoring system Establish / install temperature monitoring system Shipping Settle MPPC operation voltages, prepare table for voltage adjustment Trigger counters / Veto counter (need positive-polarity signal) Make measurement plan / schedule Contact DESY (stage, drift chamber ) Jobs toward the SC-ECAL Beam Test @ DESY

3 DAQ ace Data analysis software / ntuplization Drift chamber operation and analysis MIP calibration analysis Gain calculation (MPPC and electronics inter-calibration) Online data monitoring (check pedestal, dead channel, etc) Quick result of energy spectra / resolution Temperature / LED monitoring data, correction Event display MPPC dose test Jobs during the Beam Test


Download ppt "1234 Dec 2006 1234 Jan 2007 1234 Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14."

Similar presentations


Ads by Google