2 06.03.2006Preparation for CERN TB - Erika Garutti2 Starting a “To Do List” Get all possible documentation & info about CERN TB  from the Web: H6 manual, LCWS talk of M. Hauschild, …  combined visit to CERN (~Apr. 24) with a detailed list of questions Combined plan of installation and data taking  agree on combined physics program (next meeting) Divide tasks / avoid multiplication  clear definition of responsibilities (following the example of Nigel) and good exchange of results Shift schedule (on site / off site (analysis) / expert list) Ease the life of people  accommodation, registration @ CERN, VISA, …

3 06.03.2006Preparation for CERN TB - Erika Garutti3 Daily meeting with machine and with the shift crew

4 06.03.2006Preparation for CERN TB - Erika Garutti4 Integration of CERN equipment in our DAQ + understanding + shift instruction

5 06.03.2006Preparation for CERN TB - Erika Garutti5 Start of new shifts! Prepare bureaucracy in advance

6 Availability of people Availability of people at the CERN test beam in 2006 July-06August-06September-06October-06 29162330613202731017241815 # of people INSTECALCALIBHCAL INSTHCAL+ECAL required for shift 6/24h4/16h9/24h DESY 1 2 3 4 5 needed in addition 440544 5555 ITEP+MePHI 6 7 Prague 8 NIU 9 This test beam is the goal of the last 3 years of work: we should give THE BEST!!! preliminary

7 06.03.20067 Shift schedule (1 st proposal) Shift schedule for the CERN test beam in 2006 (HCAL proposal) July-06August-06September-06October-06 29162330613202731017241815 INSTECALCALIBHCALINST HCAL*ECAL morning 8-16 evening 16-24 night 24-8 covered shift (by HCAL / DESY*) * ITEP/MePHI/NIU not counted uncovered shift preliminary 123123 123123 123123

8 06.03.2006Preparation for CERN TB - Erika Garutti8 General strategy  Common way to look at the data (Marius) online / semi-online display feedback from fast-offline analysis  Common place where to store info (Sven) online logbook online documentation (beam usage, manuals, crew instructions) online updated plots (# ev. collected, detector efficiency)  Common software for calibration and analysis collected in one place (?) easy to access same format (MARLIN) requires common coordination (maybe analysis coordinator ?)  documentation, documentation, documentation

9 06.03.2006Preparation for CERN TB - Erika Garutti9 The pre-preparation Getting ready for CERN starts already @ DESY: The DESY test beam Apr.-Jun. can be the test bench for combined readout (DAQ) combined online monitoring first level reconstruction software integration of ECAL – HCAL software train shift crews for operating the two detectors !!! Let’s exploit this chance at best

10 06.03.2006Preparation for CERN TB - Erika Garutti10

11 06.03.2006Preparation for CERN TB - Erika Garutti11 From Nigel list All checked

12 06.03.2006Preparation for CERN TB - Erika Garutti12 Check also hadron beam calibration Combined effort when?

13 06.03.2006Preparation for CERN TB - Erika Garutti13 From Nigel list