Saverio MINUTOLITOTEM Electronics W.G., 9 December 20081 T1 electronics status.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Walls crates cables gas chambers electronics CERN adb.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Saverio MINUTOLITOTEM T1 Readiness Review, 30 November Readiness Report on T1 Electrical Systems and Electronics.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai –
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Saverio MINUTOLITOTEM Trigger Meeting 12 January ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
T1 hardware Detector Control System, OK several automates have been added, LV and HV sequences. FSM manages transition between Busy, ON and OFF states.
Status of NA62 straw electronics Webs Covers Services Readout.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Saverio MINUTOLIElectronics WG - 09 June AFEC cross-talk Plots illustrating Cross-talk effect AFEC pcb investigation.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Ervin DÉNES Collab Meeting, 23 – Emulating TOTEM Front-End Driver for trackerDAQ sw.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC W.Snoeys – MIC group Collaboration meeting 25/2/2004 TOTEM ELECTRONICS.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – Firmware (1) Firmware: - 3 different ALTERA FPGA’s Cyclone Stratix Stratix.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – TOTEM Front End Driver VME64x Host Board OptoRX Firmware.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
University of Wisconsin
TOTEM Electronics Status
The Totem trigger architecture The LONEG firmware archtecture
Production Firmware - status Components TOTFED - status
CCS Hardware Test and Commissioning Plan
Introduction Status before the 2009 run Results from the 2009 run
T1 status (a selection from EDR presentations)
T1 Electronic status Conclusions Electronics Cards:
same for both sectors 45 and 56
Fiber Installation for RUN 3&4
FEE Electronics progress
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
The digital read-out for the CSC system of the TOTEM experiment at LHC
Overview of T1 detector T1 is composed by 2 arms
The electronics system of the TOTEM T1 telescope
The digital read-out for the CSC system of the experiment TOTEM at LHC
The digital read-out for the CSC system of the TOTEM experiment at LHC
Presentation transcript:

Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status

Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 functional electronics system architecture TOTFED Detector AFECs CFECs S-bit DataOut Clk40 FastCmd I 2 C 40÷100 cm LVDS CMOS LVDS CMOS PLL25 QPLL T1 Tree CLK40 Tree SPY Mezz CCUM DCU GOHs GOH VFAT TrgMez DDAV MUX TDAV MUX VFAT CMOS LVDS ROC TOTFED TTCRx OPTORx FEC DOHM DOHs TTCRx mFEC Trigger bits Data bits Data to DAQ (S-Link; VME; or USB) Trigger Info Readout Path Control Path TTC TOTEM Slow Control On Detector region Local Detector region Counting Room region TokenRingTokenRing 4x15D4x15A4x40C4x9R2T+2D+4mFEC4 x T1 ¼4x1DH

Saverio MINUTOLITOTEM Electronics W.G., 9 December VFAT strip hybrids ‣ Request 550 pcs. ‣ Delivered 193 pcs. ‣ 129 pcs good. ‣ 64 pcs bad. ‣ Remainder 357 pcs: ‣ ( Pcb + passive components + connectors ) (by Cern) ‣ Chip gluing Cern by Genoa tech.) ‣ ( Chip bonding + hybrid tests ) (by Genoa) Trigger VFAT mezzanine ‣ Request 40 pcs. ‣ Delivered 1 pc, good (by Cern) ‣ Remainder 39 pcs (by Cern) Need 2÷3 months

Saverio MINUTOLITOTEM Electronics W.G., 9 December  Ten types, 1 for each CSC  Need 70 pcs (including spares)  Produced 25 pcs –15 soldered on CSC and installed on T1 ¼. –10 = 1 spare for each type.  Remainder 45 pcs. –Need two months (pcb + components)  bld. 188 measured a huge amount of noise –New AFEC worse than the old one tested at H8. –Long investigation  reason was the wrong AFEC input filter capacitor value. Mounted 2.7nF while 2.7pF was required. –Capacitors replacement in progress (~4000). Now the T1 anodes noise value is ~10 VFAT thr.  Tests in progress Genoa lab.) On detector region : AFEC

Saverio MINUTOLITOTEM Electronics W.G., 9 December Genoa lab. set-up AFEC reworking set-up DAQ set-up

Saverio MINUTOLITOTEM Electronics W.G., 9 December  Need 180 pcs (including spares)  Produced 45 pcs –39 installed on T1 ¼. –6 spares.  Remainder 135 pcs. –Need two months (pcb + components)  Noise investigation has emphasized that the VFAT is sensitive to the position of the pcb hybrid ground connection. Few centimeters are enough to measure differences (Blue is better than red connection). Now the T1 cathodes noise value is ~17 VFAT thr.  Tests in progress Genoa lab.) On detector region : CFEC

Saverio MINUTOLITOTEM Electronics W.G., 9 December Local detector region : ROC  Need 40 pcs (including spares)  Produced 12 pcs –2 ROC v.1 –10 ROC v.2  Remainder 30 pcs. –Need two months (pcb + components)  ROC v1. functionalities tested. –All major blocks  OK –BC0 transmission line  new layout v.2  ROC v2. Tests in progress Genoa lab.)

Saverio MINUTOLITOTEM Electronics W.G., 9 December ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED T1 TRG_TOTFED LONEG VFAT 8bit 32 COUNTING ROOM CAVERN Trigger Bits 2 x 480 = 960 (16) x2x15 x8 VFAT 8bit LV1 Y T1 TRIgger MEzzanine T1TRIME T1 TRIME: 32 trigger bits 12 bunch counter bits 40Mhz clock

Saverio MINUTOLITOTEM Electronics W.G., 9 December  Available –1 TOTEM DOHM –1 FEC mother board 1mFEC –1 TOTFED mother board –1 OPTORX v.4 –1 S-Link 64 old type Counting room electronics  Needed to complete T1(CERN) –4 + spares –1 + spare –4 + spares –2 data + 2 trigger + spares –4 data + 6 trigger + spares –4 S-Link 64 new type.  Spares shared with the other sub-detectors.

Saverio MINUTOLITOTEM Electronics W.G., 9 December ‣ Cables from detector (6th frame) to mini-rack on platform: -intermediate patch panel not required any more; -will need to add cables for position and B-field sensors (Dmitry). Cabling on YE3 - Position and B-field sensors cables

Saverio MINUTOLITOTEM Electronics W.G., 9 December L1=50cm L2=12m Optic Fibers Patch Panel 8 MPO T2 Rack GOL/DOHM MPO in line adapter Fan-out Box on T1 6th frame Multi ribbon cable (8x12) Ribbon fiber cable (12x1) Single fiber SMU in line adapter 12 8 L3=2.3m L4=3m L6=2m L5=2m T1 internal distribution Platform Side Cable Tray sideT1 quarter side #2 #1 #3 #4 T1 ¼ Optic Distribution Scheme NEED SOON T1 optic fibers distribution.

Saverio MINUTOLITOTEM Electronics W.G., 9 December Cabling

Saverio MINUTOLITOTEM Electronics W.G., 9 December AFEC CFEC ROC Gas lines CFEC cooling lines Half-arm mounting test  Complete assembly of one half-arm at bldg. 188: –Very useful to check everything fits and solve all small problems.

Saverio MINUTOLITOTEM Electronics W.G., 9 December Conclusions  To obtain from CERN: –357 Hybrids (slide #3) They need chip gluing, bonding and testing (by Genoa) –39 Trigger VFAT Mezzanine –All the Counting room electronics (slide #9) –16 Short ribbon fiber cable for T1 internal cabling (slide #11).  Cables: –External  services from platform to T1 6 th frame. Need cables procurement. (???) –Internal  Need cables procurement (Genoa)  Fibers: –External  from T2 Rack to T1 6 th frame (CERN) –Internal  short fan-out, see slide #11 (CERN).  On detector and local detector cards: –AFEC: lab. final test, cosmics tests, end production (Genoa) (slide #4). –CFEC: lab. final test, cosmics tests, end production (Genoa) (slide #6). –ROC: lab. final test, DAQ tests, end production (Genoa) (slide #7).