ALICE SSD 20 May 20051 Yalta G-J Nooren ALICE SSD status.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

1 Liverpool Production Status Week of 9 February 2007.
1 Liverpool Production Status Week of 02 March 2007.
Electrical and thermal testing at Glasgow and Liverpool.
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.
Marco Bregant Vertex05 - Nikko, November 2005 Dipartimento di Fisica Universit à di Trieste & Istituto Nazionale di Fisica Nucleare (INFN) - Trieste ALICE.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 JD.Berst, U. Goerlach, CMS TRK APR 2003 Status of Hybrid Qualification and Tender Final Technical Specifications –Hybrid types –Quality control, intermediate.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
ALICE Silicon Strip Detector Module Assembly with Single-Point TAB Interconnections 1) Introduction 2) Collaboration 3) ALICE SSD module 4) Assembly phases.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
PHENIX upgrade possibilities in Finland Detector Laboratory/Helsinki JYFL/Jyväskylä 1) Organisation 2) Detector Laboratory premises & equipment 3) Silicon.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
Strasbourg status Ring 7 pilot run François Didierjean.
17 december 2003 Gert-Jan Nooren december 2003 Gert-Jan Nooren 2 ITS SSD in 2003.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
6 th Belle PAC, KEK, February 26 and PXD - EVO, 5/March/2012 Ladislav Andricek, MPI für Physik, HLL 1
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
DEPFET workshop, Kloster Seeon, May 2014 Summary 1 Highlights Technical Coordination TB report schedule remarks.
Update on the SVD construction
Hybrid Pixel R&D and Interconnect Technologies
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Vertex Detector Mechanical R&D Design Questions and Issues
Presentation transcript:

ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status

ALICE SSD 20 May Sensor delivery and testing deliveries proceeding well: > 1200 delivered proper balancing needed: –3 manufacturers –1 testing site –3 module assembly sites –testing defines layer 5 or layer 6 –need layer 5 first –matching of bias curves per half ladder testing on critical path

ALICE SSD 20 May HAL 25 production status 28 k chips in house second production : –13 wafers delivered mid March, 3 tested 90 % yield –thinning etc. ordered –25 more wafers delivered, to be tested chipcable production status ~ 16 k delivered Industrial production started 23 k chips in SSD

ALICE SSD 20 May bonding chips Real yield ~ 85 % faulty cables, faulty chips, faulty bonding

ALICE SSD 20 May Hybrids ~2000 subhybrids delivered, ~1000 bonded

ALICE SSD 20 May module assembly status Folded, ready for ladder assembly 267 modules plus: Hybrids for 200 Chips for in SSD

ALICE SSD 20 May module yield & quality In March, > 20 % of mass produced modules from Strasbourg and Trieste have IV-curves like  Investigations at Helsinki and Utrecht Strasbourg Trieste measurements I-V curves noise response to laser optical inspection V_depl = 55 V TRI029/ITC332

ALICE SSD 20 May I-V measurement set up

ALICE SSD 20 May I-V trouble: evidence 1 Hybrid GND decoupled from bias: normal behaviour

ALICE SSD 20 May I-V trouble: evidence 2 By changing the Hybrid- GND potential the rise shifts forward The slope is ~1MΩ (current by-passed the N-side resistor)

ALICE SSD 20 May

ALICE SSD 20 May Detailed view of a faulty bond A possible short between metal strip and p-stop sensor bonding pad chipcable

ALICE SSD 20 May module yield & quality (cont’d) problem analysed and understood repair method available and tested bonding method improved: last modules –MIPOT, Helsinki 95 % –IReS 85 % mostly other failures TRI074/ITC447

ALICE SSD 20 May Thermal cyclings (hybrids/chips) Two cycling sessions Cycling profile (26 min.) 1) 16 glued chips and 6 hybrids cycled one week (387 cycles) Small vibration due the cycles caused by oven compressors 2) 5 glued and 5 unglued chips cycled one week (380 cycles) Vibrations eliminated Henri Seppänen in SSD meeting, Jalta, 16-20th of May 2005

ALICE SSD 20 May Thermal cycling test results Results 1) Chips and hybrids tested after 387 cycles - All 16 chips have many bonds opened - 30*** cables have more open bonds than 10*** cables - All 6 hybrids got fatal damages 2) 10 chips tested after 90, 264 and 380 cycles - One unglued chip got 2 open bonds after 264 cycles and got ExTest error. - No other damages. ? Indicates that vibrations + cycling might cause damages?  Not likely in the ALICE conditions, but more research will be done In the past 1 hybrid survived 350 cycles, no chip functionality failures after 1326 cycles

ALICE SSD 20 May Ladder cable status First prototypes delivered discussing delivery schedule 3400 in SSD

ALICE SSD 20 May Ladderframes assembly is going on, 1/day 10 ladder5, 14 ladder6 72 ladders in SSD Ladderframe with all 75 sensor supports within 0.03 mm in same plane

ALICE SSD 20 May Ladder assembly status –Transport of French machine to SUBATECH –Tests of module gripper –First calibration of NIKHEF machine: 2  m –accuracy of positioning, TDR: X 10  m, R 90  m, Z 50  m –first ladder before summer (SUBATECH and NIKHEF) –start mass production from September compatible with July delivery –Formation of teams in SUBATECH and NIKHEF Calibration ladder, measured relative to ladder supports

ALICE SSD 20 May Clean room SUBATECH Module and ladder storage Module test bench Ladder assembly benchSoldering bench Ladder test bench Ladder cable test bench

ALICE SSD 20 May Assembly bench (2) Installation at SUBATECH : week 17

ALICE SSD 20 May Graphic user interface

ALICE SSD 20 May conclusion Excellent cooperation in heterogeneous team Good progress in module production, but –Folding of modules not yet started at production sites –Testing of sensors too slow Slowly working towards assembly of first ladders SSD assembly late start due to cone problems important decisions this week: –module test requirements –ladder support rings –grounding Money and manpower problems showing up everywhere