Cost Entry for Non-Owned Factories By MIS Department.

Slides:



Advertisements
Similar presentations
Page 1 Cost Entry for Owned (Related) Factories By MIS Department.
Advertisements

Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
CARTONIZE CUT & PRINT BOX END LABELS RLM System. Page 2 Glossary of Training Terms The following terms will be used throughout this training program:
Page 1 Inter-Company Cash Application By MIS Department.
Page 1 Pay Inter-Company Vouchers by Hand Check By MIS Department.
Shipment Tracking (In Transits) RLM System. Shipment Tracking Records Shipment Tracking records (In Transits) are posted to the system to apprise the.
Page 1 Accounts Payable Voucher Entry By MIS Department.
Online Ordering System
Page 1 Reprint Invoice By MIS Department. Page 2 When to use Reprint Invoice The Reprint Invoice function can be used to re- create invoices that have.
Accounts Payable–1099 Processing 1Freedom Systems – Accounts Payable – 1099 Processing WELCOME TO THE ACCOUNTS PAYABLE – 1099 PROCESSING WEBINAR WE WILL.
Pride Mobility Products Corporation Production Planning and Control 2002.
This is your eGrants Login Page. Enter your User Name and Password. 1Exit a member in eGrants.
How to Use This Punch-out Training Guide
Procurement Card Training Strategic Account Management (SAM)
IMPROVED SYSTEM NEW LOOK
Page 1 EDI Drop Ship Packing By MIS Department. Page 2 EDI Drop Ship Flowchart Factory Produces Units from FGPO Scan cartons to (virtual) container Add.
1 ONE TIME PRINT SETUP To print Requisitions from Banner, follow this process once: Open Microsoft Excel, select (1) TOOLS, then (2) MACROS, then (3) SECURITY.
Welcome to the Southeastern Louisiana University’s Online Employment Site Applicant Tutorial!
Novus HR Application Review Process Human Resources Qualifying Applications HR Sending Applications to Department/Search CommitteeHR Sending Applications.
Page 1 Returns Receivings By MIS Department. Page 2 The Returns Process When a store or customer wants to return goods, they are supposed to contact the.
Copyright CovalentWorks Training Guide for Invoices MYB2B Powered by CovalentWorks.
Page 1 Cost Approval RLM System. Page 2 Costing of Finished Goods Purchase Orders Finished Goods Purchase Orders (FGPOs) are the orders Jordache places.
Page 1 Packing Open Stock for UCC128 By MIS Department.
Washington Campus Compact New Time Log Database Note to users: You should use Internet Explorer to use this database. In other programs (i.e. Firefox)
WEB PRICING SYSTEM User Manual. Click here to Log In The Defense Commissary Agency Vendor Price Change system is located at
UPC CROSS-REFERENCE SETUP FOR FACTORIES RLM System.
Page 1 Customer UPC Cross-Reference RLM System. Page 2 Customer UPC Cross-Reference Customers (i.e., stores who purchase our goods) often have their own.
1 OPOL Training (OrderPro Online) Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
Cost Entry by MG for Directions Studio Cypress Creek System.
Page 1 Daily Receiving Inquiry By MIS Department.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Pack Company Procedures. Accepting a HIP request from a supplier Allocating the Component Providers Sending the instruction through to the Component Providers.
Shipment / Container Tracking Inquiry By MIS Department.
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
Page 1 Finished Goods Purchase Order Inquiry RLM System.
RLM System Actual Cut Entry. Page 2 Glossary of Training Terms The following terms will be used throughout this training program: –Field: A box on the.
Page 1 Billing Drop Shipments RLM System. Page 2 Drop Ship Billing Drop Ship billing is very similar to Outside Contractor Billing, except that billing.
Page 1 Cash Application By MIS Department. Page 2 Enter your User ID and Password here Note: User ID and Password are initially assigned by MIS. You will.
PRINT BOX END LABELS FOR ODDS (LEFTOVERS) RLM System.
Shipment Tracking (In Transits) RLM System. Shipment Tracking Records Shipment Tracking records (“In Transits”) are posted to the system to apprise the.
Page 1 Invoice (Pick Ticket) Inquiry By MIS Department.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Finished Goods Purchase Order Entry RLM System. Finished Goods Purchase Orders FGPOs are the orders Jordache places to the factories that produce the.
Page 1 Manual Finished Goods Receiving By MIS Department.
Outside Contractor Billing Ron Lynn Management System.
Contract Invoice Guide
Cost Entry for Non-Owned Factories Cypress Creek System.
Page 1 UPC (Universal Product Code) Inquiry By MIS Department.
SMART Tip Sheets Maryland February 2008 IGSR Technical Support: Client Referral Consent Referral Accepting Referrals This tip sheet focuses.
Page 1 Global Sourcing By MIS Department. Page 2 What is Global Sourcing? The Global Sourcing application allows you to see the production in units and.
Order Inquiry by Style RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed using.
Page 1 Cash Application By MIS Department. Page 2 Enter your User ID and Password here Note: User ID and Password are initially assigned by MIS. You will.
Order Inquiry RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed using the Order.
Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
Purchase Orders Notes:.
Page 1 Invoice (Pick Ticket) Inquiry By MIS Department.
Proprietary + Confidential1 Supplier iPPAP Training.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Child Care Subsidy Program Online Billing Provider Training Spring 2016.
Domestic Cost Entry and Approval RLM System. Costing of Finished Goods Purchase Orders Domestic FGPOs are orders Directions placed directly to the factories.
Page 1 GAP Force Pick Ticket By MIS Department. Page 2 Forcing Pick Tickets The Gap process requires that pick tickets be created before the goods are.
Order Inquiry by Entry Date RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed.
Page 1 One-Line Costing By MIS Department. Page 2 One-line Cost Sheet for Style In the event that styles in stock are transferred from PPK to Open Stock.
Page 1 GAP Container Loading By MIS Department. Page 2 Gap Distribution Center Process The Factory does not ship the units to the Distribution Center.
Journal of Mountain Science (JMS)
SUBMITTING A PAYMENT REQUEST FORM
P2P Req to Receive Create a Non-Catalog Requisition
To the ETS – Encumbrance Online Training Course
To the ETS – Encumbrance Online Training Course
Presentation transcript:

Cost Entry for Non-Owned Factories By MIS Department

Page 2 Costing Workflow

Page 3 Costing of Finished Goods Purchase Orders FGPOs are the orders Jordache places to the factories that produce the garments Costing of FGPOs to Outside Contractors (non- Related Factories) located in Hong Kong is done by JIL (Company 89) Costing of all other FGPOs to Outside Contractors (non-Related Factories) is done by MG Macao (Company 20) NOTE: Some of the slides may have different color screens. All the screens you will see on RLM are in the BLUE color scheme (Skip to Main Menu)Skip to Main Menu

Page 4 Glossary of Training Terms The following terms will be used throughout this training program: –Field: A box on the screen into which you enter information –Value: The information (data) being entered in the field. Example: Division number, FGPO number –Icon: An image you may click to perform a function such as select, submit or exit –(Single-)Click: Also “Select.” Hitting the left mouse button once. This will activate an icon or select a row in a list of values –Double-click: Hitting the left mouse button twice o the same part of the screen. Used only to select and return a value from a list.

Page 5 Using the Cypress Creek System These are the primary icons you will use: – Search: Located next to entry fields. Clicking this icon brings up a pop-up window with a list of all possible values for the field (for example, the next to the Division field will show a list of all divisions) (Shift-F9 keys or F21 key) – Select: Located on the Search pop-up windows. You may click on a line and click Select to return its value to the main screen – OK (Submit): Located in the bottom right corner of each screen. Processes the information on screen and brings you to the next screen – Return (Back): Located at the top of each screen. Click this icon to go back one screen (F2 key) – Exit: Located at the top of each screen. Click this icon to return to the menu or close a pop-up (F3 key)

Page 6 Enter your User ID and Password here Note: User ID and Password are assigned by MIS. The fields are NOT case-sensitive. Sign On

Page 7 Click the check (or hit the Enter key) to proceed Welcome

Page 8 Enter “20” in the Company field, or “89” if the factory is in Hong Kong If you don’t enter a Company or enter the wrong number, you will receive this error: Click OK Select Application Enter the application number for the menu or click the correct button in the menu at left

Page 9 Cost Entry Enter the Division Number, or click the icon to select a Division Enter “99” to see orders from all Divisions that need to be costed

Page 10 Cost Entry: Select Division Double-click on a division, or single- click and click the icon

Page 11 Cost Entry: Select Account Enter the Customer Account #, or click the icon to select from a list… If selecting, click on the appropriate arrow button to enter the Customer information you have Account numbers are: 1 for Jordache 3 for Ditto 9 for Directions Studio

Page 12 Cost Entry: Select Account by Name Select the Account from the list or… …type in the first letter(s) of the Account name and hit the Enter key to search the list. Double-click on a name, or single- click and click the icon

Page 13 Cost Entry: Select by User PO Number To search by User PO #, Enter the User PO # here or click the icon to select from a list…

Page 14 Cost Entry: Select by User PO Select the PO from the list or… …type in the User PO # and hit the Enter key to search the list. Double-click on a row, or single-click and click the icon

Page 15 Cost Entry: Display Orders To see all orders, click “Display Orders for All Accounts” without making any entries

Page 16 Display FGPOs Requiring Costs A list of all orders requiring costs appears. Costs that have been approved are not visible Click “Display All Orders” to view the list including approved and rejected orders

Page 17 Display FGPOs Requiring Costs Right-click on the line of the order you want to cost A menu appears. Select “Update Cost”

Page 18 The Cost Sheet: Description The cost sheet contains entry fields to allow for the costing of various parts of the production process, as well as to identify information required to import the goods to the United States The sections are as follows: –Exchange Rate –Fabric –Pocketing –Cut and Make –Sewing Trim –Embroidery & PR Finishing Trim –Hanger Charge –Quota # –Ex. Trim Freight –Totals and Variances

Page 19 Cost Sheet Entry: The Cost Sheet Click into a field to enter or change a value Make sure the header information is correct Scroll down to continue entering the cost

Page 20 Cost Sheet Entry: The Cost Sheet In this view you can use the “Opt” column to add or edit lines The “Opt” values are listed here: There is also F to duplicate a line

Page 21 Cost Sheet Entry: The Cost Sheet To see the cost sheet by section with column headings, click “Alternate Entry Mode”

Page 22 Cost Sheet: View Headings At any time you may click this icon to refresh the calculations Change the exchange rate if necessary Hit the Back button (F2) to return to the original entry mode

Page 23 Cost Sheet: Fabric Click the double arrow to scroll down to the next section You may enter values in the first and second columns. Update Allowance % only in Allowance rows. Cost/Gmt and Cost/Dz are calculated by the system

Page 24 Cost Sheet: Pocketing

Page 25 Cost Sheet: Cut and Make Enter the Cost per Dozen for only ONE type of cut and make

Page 26 Cost Sheet: Sewing Trim

Page 27 Cost Sheet: Embroidery/Finishing

Page 28 Cost Sheet: Total Trim

Page 29 Cost Sheet: Hanger Charge

Page 30 Cost Sheet: Factory Cost Rounding Var is a system field – do not enter any value Click here to (re)calculate the Factory Cost

Page 31 Cost Sheet: Quota

Page 32 Cost Sheet: Air Freight

Page 33 Cost Sheet: Factory Cost Click “Final” to finalize the cost sheet and send it to NY for approval

Page 34 Cost Sheet: Total FOB

Page 35 Default Vendor Markups For your information, the default markups are as follows: MGO/MGM – 10% MG for DS – 5% MKLEN (AIHL) – 17% JIL – 0% KMS Designs – 0% Note that you may edit the markups if necessary and approved by your manager.

Page 36 Cost Sheet: Finalize You may want to check “Print OPA reports” to print the OPA and Contract Check “Send Cost for Approval” Click OK to submit

Page 37 Cost Sheet: Print OPAs and Contract(s) Click OK to submit Check “Contract(s)” Check “Order Placement Advice” for OPA You may change the number of copies of each document that will print

Page 38 Cost Sheet: Factory Cost Click OK to submit Note: The documents you print at this time have no dates on them and are NOT VALID until the cost sheet has been Approved by Jordache New York. DO NOT SEND THESE COPIES OUT. PCCRs and Amendments will not print until a revision has been made to the Cost Sheet. You do not need to check them

Page 39 After Finalize: Cost Sheet Listing After Finalizing, you will be returned to the list of cost sheets to be entered. The Cost Sheet you finalized will not be on this list. If you need to change the Cost Sheet after finalization, you must tell the Production Coordinator for that division to Reject the Cost. You may then search for the PO and edit itsearch for the PO

Page 40 Checking the OPAs and Contracts The OPA (Order Placement Advice) shows the agent/seller’s order to the factory, including the cost and order breakdown The OPA should have a header with the Vendor’s address (or Iron Will’s address for 2005 FGPOs) If you do not see a header, please refer to the following slides

Page Documents Checklist

Page 42 OPA Verbiage Maintenance Right-click on the line of the PO for which you want to change the OPA Verbiage A menu appears. Select “OPA Maintenance”

Page 43 OPA Verbiage Maintenance Select “Duplicate OPA Verbiage from another PO” Enter the Division and User PO #. Try to match the division and PO suffix (e.g., W, SN, UN) to the PO you are costing

Page 44 OPA Verbiage Maintenance For a 2005 PO, you should have Iron Will in the Agent Field. For a 2006 PO, you should use MG/JIL/AIHL You may enter the information directly, or right- click and select “Search/List Table” to select from a list Click Update and Exit when finished. This will update all the documents Click Update and Next Screen to view more verbiage items (not usually needed)

Page 45 What Happens Next If you finalized the cost sheet, the Production Coordinator in NY will review and either Approve or Reject it –If Approved, costing is finished –If Rejected, the cost sheet will appear in your Orders List with the status “Cost Rejected” – you must revise the cost per the Coordinator’s instructions and Finalize it again – see Revising a Cost SheetRevising a Cost Sheet If you did not Finalize the cost sheet, it will remain in your list of orders with the status “Cost In Work” until you go back to it and Finalize it

Page 46 Appendix (click to jump to a section) Searching for a cost sheet by User PO # Revising a Cost Sheet Printing Approved OPAs and Contracts

Page 47 Searching for a Cost Sheet by User PO # You may want to search for a Cost Sheet by User PO Number if: –You entered a cost but need to change/finalize –The cost was Rejected by NY –You want to print the OPA and Contracts of an Approved Cost Sheet

Page 48 Searching for a Cost Sheet by User PO # To search for a specific FGPO, enter the Division Number, or click the icon to select a Division

Page 49 Select Division Double-click on a division, or single- click and click the icon

Page 50 Select Account Enter the Customer Account #: 1 for Jordache 3 for Ditto 9 for Directions Studio Enter the User PO # here or click the icon to select from a list…

Page 51 Select by User PO Select the PO from the list or… …type in the User PO # and hit the Enter key to search the list. Double-click on a row, or single-click and click the icon

Page 52 Select by User PO Click OK (Enter key)

Page 53 Update Cost Right-click on the PO line to access the selection menu Select Update Cost to enter the cost sheet. Return to Cost Entry Cost Entry Note: When you finish revising a Rejected cost sheet, you must update the revision number. Continue with the next slide

Page 54 Cost Sheet Inquiry Once the cost sheet has been finalized, searching for it will automatically bring you to this Inquiry screen – you cannot edit the cost here If you need to change the cost, you must contact NY and have the cost sheet Rejected

Page 55 Revising a Cost Sheet When the cost is Rejected by NY, you need to return to the cost sheet and edit it (see Cost Entry)Cost Entry Once you have finished, you must finalize again, and update the revision number (see next slides) The revision number appears on OPAs and Contracts, and generates PCCRs and Amendments to contracts, so it is important for having a full set of documents Note: The revision number may also change if NY changes the PO. Note: The starting revision number for all Cost Sheets is 000, and the first revision is 001

Page 56 Select Rejected PO Note: A red PO # means that comments have been entered by Production Right-click on the line of the PO line Select “Update Cost”

Page 57 Check Comments on Rejected Cost Click here to see comments and instructions entered by the Production Coordinator

Page 58 View/Add Comments You may add your own comments or questions by clicking on an empty line and typing Comments will contain instructions for editing the cost from your Production Coordinator Click OK to update the comments Click Return to go back to the Cost Sheet

Page 59 Revising a Cost Sheet Click “Final” to finalize the cost sheet and send it to NY for approval If the Cost Sheet is Rejected, you must update the Revision Number

Page 60 Finalize: Increase Revision Number You may want to check “Print OPA reports” to print the OPA and Contract Check “Send Cost for Approval” Click OK to submit To increase the PO and OPA/Contract revision numbers, you must click this box

Page 61 Update Revision Reason Click the icon to select a Revision Reason

Page 62 Select Revision Reason Double-click on a row, or single-click and click the icon

Page 63 Update Revision Reason Click the Update button to submit You may change or add to the Description text CC Change Price (User Action)

Page 64 Printing Approved OPAs and Contracts Once NY has Approved the Cost Sheet, you should print the OPA and Contract(s) (as well as the PCCR and Amendment(s), if applicable) The Factory/Vendor contract should be signed by the Vendor Manager and sent to the Factory Start by searching for the Cost Sheet by User PO #searching for the Cost Sheet by User PO #

Page 65 Printing Approved OPAs and Contract(s) Note: You will not see the cost sheet line when searching by User PO #, as it has been already been submitted to NY and Approved. Click “Display All Orders” to show the cost sheet

Page 66 Printing Approved OPAs and Contract(s) Right-click on the PO line to access the selection menu Select OPA Print

Page 67 Printing Approved OPAs and Contract(s) Click OK to submit Check all the boxes (in case there have been revisions) You may change the number of copies of each document that will print

Page 68 Printing Approved OPAs and Contract(s) Click OK to submit Note: POs issued in 2006 and following will not have the Agent/Vendor Contract option The popup changes to display contract options

Page 69 Printing Approved OPAs and Contract(s) “Reports Submitted” appears Click Return (F2)

Page 70 Printing Approved OPAs and Contract(s) Click OK to submit The popup remains – this time for Amendments (if you selected that option)

Page 71 Printing Approved OPAs and Contract(s) “Reports Submitted” appears Click Return (F2)

Page 72 Printing Approved OPAs and Contract(s) “Reports Submitted” appears on the main OPA print window Click Return (F2) to close the popup