g GE Contractual Services West Region I A M D C 1 Report BXXXXX.X Project Title BXXXXX.X Project Title Green Belt Month Year Team Members:M. Kalmes (Champion),

Slides:



Advertisements
Similar presentations
Lean Six Sigma Project Presentation Template
Advertisements

Project leaders will keep track of team progress using an A3 Report.
Process Control Charts An Overview. What is Statistical Process Control? Statistical Process Control (SPC) uses statistical tools to observe the performance.
Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Project Storyboard Template
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Roberto lopez LSSMBB DMAIC project template.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
 Individually  Given your sample of M&Ms, build a Pareto diagram by color  Before you destroy the evidence, be sure you have an accurate count.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
The Quality Improvement Model
Copyright © 2014 Prosci Inc. All rights reserved. 1 Please read and then delete this slide This template is provided as a guideline only for change management.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
Chapter 18 Optimizing and Controlling Processes through Statistical Process Control.
Managing Project Quality
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
© 2002 Systex Services Capability and Improvement - from Cpk to Six Sigma.
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
CS532 Term Paper Applying Six Sigma Methodology In Software Engineering Sourabh Bandyopadhyay.
Practical Assessment Project Template
Project Title GB or BB name: XYZ. Define Phase D D M M A A I I C C.
Problem Solving.
Welcome to Session 3 – Project Management Process Overview
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Confidential, , MBX Template Book Confidential, ,
ANOVA, Regression and Multiple Regression March
Six Sigma by Aranyos Attila for MSc. Mérnök Informatika Production and Process Management class held by Vida Csaba.
Green Belt – SIX SIGMA OPERATIONAL Intro to Analyze Phase.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Practical Assessment Project Template
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
Practical Assessment Project Template
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Lean Six Sigma DMAIC Improvement Story
Six Sigma Approach.
Measure Phase Welcome to Measure
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Practical Assessment Project Template
OPS/571 Operations Management
Title: Owner: Ver: Date:
Six Sigma Green Belt Training
Title: Owner: Ver: Date:
Lean Six Sigma Project Name: Project: Date: Intros Expecations
Improve Phase Wrap Up and Action Items
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
The 7 Basic Quality Tools ~ The DMAIC Process
DMAIC STANDARD WORK TEMPLATE
Measure Phase Wrap Up and Action Items
Practical Assessment Project Template – REV. 5.2
CPI Event / Project Tollgate Template
Practical Assessment Project Template – REV. 5.2
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

g GE Contractual Services West Region I A M D C 1 Report BXXXXX.X Project Title BXXXXX.X Project Title Green Belt Month Year Team Members:M. Kalmes (Champion), J. Pasquarelli (Sponsor), F. Serafini (Functional Leader), G. Polesky (MBB), B. Francis (Finance BB), (IM), R. Matthews (BB) This area will contain tips, applicability, or other information that will help determine one of two things: whether or not you should use this slide if you should, what to look for or what the finished product should contain. Other tips are in purple on the slides and should be deleted prior to completion. Items to be replaced are in red. When the slide is complete, delete this instruction text block. You WILL NOT use every slide in this template. I hope I have included every slide that you might possibly ever need, but most projects will only have between 10 and 20 slides (some more, some less). Include all project team members in this list, with their role in parentheses. Do not change any of the names in this list - just add to it.

g GE Contractual Services West Region I A M D C 2 Define Project Background and Introduction Format this paragraph in any way that tells your story best. This is a mandatory slide. Tell a little about what parts of your system are causing problems. Where is the pain? Where did the idea come from? Is it leveraged or benchmarked? Write this as if someone from outside GEPS is your audience. Explain all terms and keep the discussion at a high level. Keep it simple, but thoroughly explain the situation. You are developing a business case for completing the project. Identify the project’s customers and how it will impact them. Wrap up with a problem and goal statement (DMA page 3.5), e.g. “These flame detectors are expected to survive to the first major inspection, but they are lasting less that 8000 hours. This project will investigate options to improve the life of these components.”

g GE Contractual Services West Region I A M D C 3 CTQ Solution Tree Defect:Defect: Opportunity:Opportunity: Independent Variables (Vital few ‘X’s) Vital Data Collected: Vital Data Collected: Dependent Variables (Key process steps) Project Description: O&M Beta Theme Area (In QPT) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Customer CTQ (Plant Level) For the top section, start with one of the key GEPS CTQs: >Customer responsiveness and communication >Marketplace competitiveness >On-time, accurate, and complete customer deliverables >Product/service technical performance Drill down to the specific area that your project addresses on the bottom row (page 2.15 in DMA). For Project Description, describe how you will attack the problem described on the previous page. Remember, at this point you have not settled on a solution. Keep your options open. Opportunity and defect definitions are the most critical part of defining a project. Can you measure your defect with a real number? If not, it’s probably not the best defect definition to use.

g GE Contractual Services West Region I A M D C 4 “As-is” Process Map - DMA page 4.1, 8.3 If there are any big ideas that the process map demonstrates, mention them here. Everything that happens in our business can be mapped. Use Visio or PowerPoint to show the flow of either electricity, water, information, paperwork, money, whatever the operational “fluid” is for your process. Don’t over-complicate it, but show what really happens so both you and the reader can see what needs to be fixed. Remember, these are best done with the entire team that interacts with the process so they can tell you where reality differs from what is published in the Quality Manual, the tech manual, or the site procedures. This slide isn’t mandatory, but include in your summary (next slide) why you elected not to do one if you leave it out. It really is important to get a visual idea of the process. Define

g GE Contractual Services West Region I A M D C 5 Define Project Scope - DMA page 3.12 DEFINE SUMMARY : Customer: CTQs: What is the CTQ - start thinking about how to measure it. Estimate of time to completion: DEFINE SUMMARY : Customer: CTQs: What is the CTQ - start thinking about how to measure it. Estimate of time to completion: Project Scope Includes : Does not include : Boundaries : Project Scope Includes : Does not include : Boundaries : Scope your project. Let everyone know what you intend to affect and what you cannot. Set realistic expectations for the impact of your project. Use plain language. In the DEFINE SUMMARY, reiterate that you know who your customer is, what his CTQ is (at the plant level), how that CTQ is measured, and how long this project should take to complete. You cannot proceed unless you know this information. A little more about defects and opportunities: a defect, in a good definition, is not the presence or absence of your new process. Try to define what that procedure/ process/equipment allows you to do or avoid, and measure that as your defect (e.g. new procedure for invoice processing, defect is number of days from standard that the invoice is processed).

g GE Contractual Services West Region I A M D C 6 Use this slide to display your fishbone, FMEA, Pareto, or QFD (or if the customer has mandated that a particular characteristic is measured, note that here). For complex systems, a fishbone (DMA page 8.17) or Pareto (DMA page 8.45) will allow you to discuss the defect at a high level and get a consensus answer more quickly. For systems with many interactions and risks, the QFD (DMA section 7) and FMEA (DMA page 8.26) provide more opportunities to “get it right the first time,” but they are significantly more time consuming. Make a decision based on the complexity and risk associated with your project. CTQ Characteristic If your display leads you to a revelation (the characteristic to measure), and we hope it will, note it here. Selecting how to measure your CTQ can use any number of tools (DMA page summary). The suggested tools for this piece of the Measure phase are Fishbone, FMEA, Pareto chart, customer requirements, or the Quality Function Deployment. The goal is to identify the element that has the greatest effect on defects. Fishbone diagrams help a group discuss causes and effects to decide on the big issue. Pareto charts help identify an issue that has the greatest impact compared to other issues. FMEA (Failure Mode and Effects Analysis) charts attempt to put real numbers on and prioritize various situations. QFD was used to develop your dashboards. It is another communication tools. Pick one or more to determine your main effect to measure. Measure

g GE Contractual Services West Region I A M D C 7 Performance Standard Source: Measure Metric: Target: Upper Specification Limit: Lower Specification Limit: The big question for the Measure phase is, “What is the current frequency of defects?” Everything we do in this phase should be identifying how the current situation performs. We have already defined the CTQ. Now we need to decide what metric to use. That is our process “Y”. Now we need to determine our performance standard. This is closely related to your defect definition. The Source of your performance standard will be important to those attempting to leverage your work. It might be manufacturer’s specifications, blueprints, other plants’ performance (benchmarking), customer requirements, contractual requirements, etc. Let us know why you picked this target. Delete USL or LSL if your metric is one-sided. Justification for discrete data: This will be a conditional field. If you are using discrete data (DMA page 9.9), tell us why you are not using continuous data. The more you use continuous data, the better your findings will be. If you use continuous data, delete this box.

g GE Contractual Services West Region I A M D C 8 Measurements What data is available? How much will you use? Do you trust the data? How is the data subgrouped (is it broken out by shift, fuel type, season, supplier, etc.)? Special cause should only exist BETWEEN subgroups, not in them (DMA page 13.7). Is there a published data collection plan? How was it communicated? Either show Gage Repeatability & Reproducibility (DMA section 10) studies or explain why they are not required. Typical answer for plant projects: All data was gathered from installed plant monitoring systems that are calibrated and tested per the plant’s preventive maintenance schedule. Readings are taken from digital gauging, so no opportunity exists for variation in measurements. Project Data Now we know what to measure and how to determine if it is good or bad. We need to answer a few more questions about the data. How much data do we need? How much is available? What is the data collection plan? Do we need a Gage Repeatability & Reproducibility Study? Contact you Black Belt if you either need to do a study or don’t know if you need one. How is the data collection plan communicated to the people that will execute it? Can you point to concrete evidence for all of these answers? Remember to respond to the purple questions with language and answers that anyone could understand. Delete the purple questions and fill in your answers in black, consistent with the sample GR&R answer. Measure

g GE Contractual Services West Region I A M D C 9 Put your Run Chart here to check for trends, etc.. Initial Process Measurements Explain all unusual p-values and control charts, and summarize Measure phase observations in this box. Show a Run Chart for continuous data. If there are any p-values less than 0.05, explain that trend or unusual pattern in your data with the root cause. Create the Display Basic Statistics graph in Minitab. Explain whether or not your data is normal (continuous data only). It is normal if the p-value is greater than Is your process in control? If you are using discrete data, delete this slide. Measure Put your Basic Statistics Chart here to check for normality.

g GE Contractual Services West Region I A M D C 10 Put your plots from Minitab here. This will show your baseline status (DPMO and Z.Bench). Be sure to use only the long term outputs from Minitab (Z.Bench(lt) and DPMO (lt)) if your subgroup size is one. Initial Process Capability This box will contain your assessment of Z.Shift and a quick summary of all baseline process capabilities: DPMO, Z.Bench, other observations. Is the problem with your mean or spread/standard deviation? If discrete, what is the largest category of defects? This is also a mandatory slide. You must establish your current process capability in terms of DPMO (defects per million opportunities) and sigma capability (z-score). Is it possible for your DPMO to be any number between 0 and 1 million? If not, you may not have a measurable impact (if you can only be 0 DPMO or 1,000,000 DPMO, then we’re not measuring anything). Your slide will have the Minitab output for either the Six Sigma Process Report or Product Report. This will be the two graphs that show a histogram on one and the control charts on the other for the Process Report, and the two graphs for the Product report show your z.bench and the Ideal State plot. For continuous data, tell us if you have a significant z.shift and whether or not your current technology is adequate for the job. Analyze

g GE Contractual Services West Region I A M D C 11 Performance Objective - DMA section 15 Explain your goal for improvement. Is it an improvement of the mean (shift) or standard deviation (narrow)? Have you identified the correct vital few X’s? Is there any potential interaction between variables? If you did not complete a fishbone in the Measure phase, consider one here. Analyze This slide will show your goal for improvement. It can be one of two things: >The Short-term output from your capability analysis from the last slide (your entitlement). >A benchmark that you have discovered for the best practice available. Prior to the Improve phase, verify that you have identified all of the vital few “X’s”. Is there a possibility that some variables might interact?

g GE Contractual Services West Region I A M D C 12 Hypothesis Testing - DMA Section See section 16 in DMA for a brief review of hypothesis testing. You will place output plots/graphs from Minitab on this slide to verify your claims that two sets of numbers are the same or different, depending on your hypothesis. See your Black Belt for more assistance. Analyze If you have before/after data or numbers from your benchmarking site to compare, place the results of your hypothesis tests here. You may not have a hypothesis test to demonstrate. If you do, they could be t tests, homogeneity of variance tests, ANOVA tests, or regression fits for continuous data. Discrete data may use chi-square goodness of fit or tests of independence (DMA section 19). Please review the Statistical Roadmap on page 18.3 before performing a hypothesis test. Let Minitab do the math for you. The important item for you to understand is what you need to know after the test. Before leaving Analyze, be certain that you have answered this: “When, where, and why do defects occur in my process?”

g GE Contractual Services West Region I A M D C 13 Improvement Selection Process If you use a scorecard, clearly state the winner here. Explain the major factors that led to this option receiving the high score. Show your scorecard with all candidates for improvement listed. Include you selection criteria -and how it was selected - and a legend for the table. OR Show the Designed Experiment (this will take more than just this slide). Remember the Experimenter’s Checklist in IC section 7 is a guide for this tool. Improve The goal for the Improve section is to correct problems with our vital X’s. There are no reference pages in the “I” section because you have either already used the tools in DMA or it is as complex as DOE. There is no single reference section for DOE. Fishbones, process maps, FMEA, and mistake-proofing brain- storming sessions are examples of sources for improvement ideas. Once you have a list of possible improvements, you need to demonstrate which one is clearly the best choice. For simple decisions or low-impact projects, a scorecard is a quick way to come to consensus on the solution. For more complex projects, a Design of Experiments (helicopter project) is more applicable.

g GE Contractual Services West Region I A M D C 14 Implementation and Results Summarize the improvement and proof of goal attainment. This is the highlight of the project report Show the plan for implementing your improvement. This might require training plans, equipment installation, vendor changes, or other process modifications Show the cost to implement your plan. If it is zero, say so. Show your proof that you made a difference in the process. Insert additional slides for hypothesis tests to prove the changes, just as in Analyze. Improve This slide needs to show two vital pieces of information: >Implementation plan and cost/benefit analysis >Results of your improvement proving that you made a difference in the process and met you improvement goal. Put the costs in real economic impact. Every project has some impact on the plant’s bottom line. Think about each process that the improvement touches.

g GE Contractual Services West Region I A M D C 15 Implementation and Results Place any comments related to the hypothesis test output here. Show Minitab output for hypothesis test, if applicable Improve This slide is the backup information for the previous slide. Place your Minitab output here. This slide may not be used depending on your particular improvement methods. The hypothesis tests are the same as those in the Analyze phase (t tests, homogeneity of variance test, etc.)

g GE Contractual Services West Region I A M D C 16 New Process Capability Summarize the improvement in terms of improvement in sigma capability and DPMO reduction. Control This slide will show the numerical improvement of your project. If you have continuous data, use the Six Sigma Process Report from Minitab again. For discrete data, use the Six Sigma Product Report again. This is a mandatory slide. We cannot enter your project into QPT without the DPMO and sigma capability of your new process. Put your plots from Minitab here. This will show your improved status (DPMO and Z.Bench). Be sure to use only the long term outputs from Minitab (Z.Bench(lt) and DPMO (lt)) if your subgroup size is one.

g GE Contractual Services West Region I A M D C 17 Long Term Control - Answer each question Control The question to answer here is: “How can we maintain the improvements?” Try first to mistake-proof the process (IC section 13). List the details of your mistake-proofing in this slide. If the process cannot be mistake- proofed, discuss your risk abatement plan (IC section 12). If that is not an option, discuss the deployment of statistical process control (SPC) charts for process monitoring (IC sections 14-17). Show examples of the charts that you have chosen to deploy, and discuss the review and feedback process. Who owns the review of the charts and what is the schedule? You may use more than one of these tools, but you should have at least one. Documentation is the most critical portion of the Control phase. Without it, your process will decay to its pre-improvement state. Discuss your control tool and documentation. What are you doing to maintain your improvement? Try to mistake-proof if at all possible. Documentation must be a part of your control process! Who (position, individual) owns the control phase? What happens when that person changes jobs? Is there a review or audit process planned (margin review, next year’s budget, next supplier negotiation)?

g GE Contractual Services West Region I A M D C 18 Potential Backup Documents New Procedures Control Letter Training Action Plans Control This is an overflow slide. Continue any results from the previous slide or cut-and-paste any other documentation of improvement or long-term control here (letters from vendors, letters of approval from regulatory bodies or the customer, etc.)

g GE Contractual Services West Region I A M D C 19 Takeaway and tools used PRACTICAL PROBLEM STATISTICAL CONTROL STATISTICAL PROBLEM STATISTICAL SOLUTION PRACTICAL SOLUTION Measure Improve Control Analyze Takeaway and tools used Summarize project defect reduction (before v after) in DPU and/or Z short term, shift improvement (if any) and projects saving This summary slide helps us put your entry into QPT. Please summarize each phase of the project with the highlights and findings.

g GE Contractual Services West Region I A M D C 20 Write your take away here List customer savings calculations OWNERS Potential Financial Benefits GE Potential Financial Benefits List the amount calculations and type of cost savings for GE Here is the bottom line. How much of a financial impact did your project have? Everything you do during a work day has a financial impact on either GE or your customer. Even if you do absolutely nothing, your pay is a factor for one of those two entities. Quantify, in real dollars, the financial impact of your work. Be sure to subtract any implementation costs to get your actual financial gain. This project is not complete until the financial impact is determined!