Practical Assessment Project Template – DMADV

Similar presentations


Presentation on theme: "Practical Assessment Project Template – DMADV"— Presentation transcript:

1 Practical Assessment Project Template – DMADV
Project title: <title of the project> Organization: <name of your organization> Project leader: <your name> Belt level: <Black or Green Belt> Revision date: <e.g >

2 DMADV Introduction for this template
Objectives of this presentation: Certification by LSSA Project summary for your organization Guidelines: Methodology and logic understandable, for a Lean Six Sigma trained external colleague Clear conclusions on each sheet Target for certification is max. 25 sheets (no limit for internal use) No back-up sheets Delete the (Italic) notes for the user, upon need Delete this slide before handing in.

3 DMADV Process improvement roadmap
DMADV roadmap Define 1 Define and Scope project 2 Determine functional requirements 3 Plan and document project Measure 4 Translate into technical requirements 5 Establish objectives 6 Evaluate measurement system Analyze 7 Develop concept design 8 Identify potential influence factors 9 Develop Y=f(X) function Design 10 Determine optimum design 11 Prototyping / concept 12 Design validation plan Verify 13 Validate design 14 Close out project

4 DEFINE 1 – Define and scope project
Problem Description: Objectives:

5 DEFINE 1 – Define and scope project
Target: In Scope Out of Scope: Deliverables: Hard Benefits: Soft Benefits:

6 Define 2 – Functional Requirements
Determine Functional Requirements

7 DEFINE 3 – Plan and document project
Project Team Supplier: Champion: User: MBB: Project leader (Belt): Name: Role: Responsibility:

8 DEFINE 3 – Plan and document project
SIPOC is mandatory for process improvement For design improvement: visualize product problem area SIPOC Process Map Supplier: Inputs: Process: Outputs: Customers: ‘Process’ Step 1 Step 2 Step 3 Step 4 Step 5

9 Self Assessment LSSA Assessor Feedback
DEFINE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Define 1 Project addresses a clear business opportunity (GB: 20k€ p/year; BB: 50k€ p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been clearly defined. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Relevant KPIs have been selected / CTQ-flowdown has been constructed. 8 SIPOC has been made. Missing Incorrect Correct N/A Define 1 Project addresses a clear business opportunity (GB: 20k€ p/year; BB: 50k€ p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been clearly defined. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Relevant KPIs have been selected / CTQ-flowdown has been constructed. 8 SIPOC has been made.

10 MEASURE 4 – Technical Requirements
Translate into technical requirements

11 MEASURE 5 – Objectives Establish objectives

12 MEASURE 6 – Measurement Procedures
Evaluate measurement system

13 Self Assessment LSSA Assessor Feedback
MEASURE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Measure 1 Data has been collected / selected properly. 2 The collected data has been proven to be representative for the project. 3 Validity of the data has been verified in an appropriate way (Gage R&R if applicable). 4 Historical data has been used to visualize process stability and performance over time. 5 Variation in the process has been considered (common cause or special cause). 6 Short term versus long term performance has been considered. 7 Performance against requirements has been checked. Missing Incorrect Correct N/A Measure 1 Data has been collected / selected properly. 2 The collected data has been proven to be representative for the project. 3 Validity of the data has been verified in an appropriate way (Gage R&R if applicable). 4 Historical data has been used to visualize process stability and performance over time. 5 Variation in the process has been considered (common cause or special cause). 6 Short term versus long term performance has been considered. 7 Performance against requirements has been checked.

14 ANALYZE 7 – Concept Design
Develop Concept Design

15 ANALYZE 8 – Potential influence factors
Identify potential influence factors

16 ANALYZE 9 – Develop Y=f(X) function

17 Self Assessment LSSA Assessor Feedback
ANALYZE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential factors of influence have been determined. 3 Cause & Effect / FMEA have been used to identify factors with highest influence. 4 Hypothesis for root cause has been defined properly. 5 Input data has been collected and analyzed correctly. 6 Graphical and statistical techniques have been applied to investigate root causes. 7 Major root causes have been identified. 8 Conclusions have demonstrated strong evidence / statistically valid. Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential factors of influence have been determined. 3 Cause & Effect / FMEA have been used to identify factors with highest influence. 4 Hypothesis for root cause has been defined properly. 5 Input data has been collected and analyzed correctly. 6 Graphical and statistical techniques have been applied to investigate root causes. 7 Major root causes have been identified. 8 Conclusions have demonstrated strong evidence / statistically valid.

18 Design 10 – Optimum Design
Determine Optimum Design

19 Design 11 – Prototyping / Concept
Create prototype / concept

20 Design 12 – Design Validation Plan
Make a design validation plan

21 Self Assessment LSSA Assessor Feedback
Design Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome. Risks have been mitigated. 4 Internal and external clients have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable). Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome. Risks have been mitigated. 4 Internal and external clients have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable).

22 Verify 13 – ValidatE Design

23 Verify 14 – Close out project
Conclusions …. Recommendations Lessons learned

24 Verify 14 – Close out project
The realized benefits of this projects are: Champion: Date, Name & Signature - Controller: Date, Name & Signature - LSSA Assessor: Date, Name & Signature -

25 Self Assessment LSSA Assessor Feedback
Verify Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' is available and sufficient. 2 Improvements have proven to be sustainable. 3 Measures have been put in place to monitor process performance. 4 Documentation has been updated (pFMEA, Control Plan, SOPs). 5 Training has been performed for the new process. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 9 Controller signed that project savings / benefits have been achieved. Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' is available and sufficient. 2 Improvements have proven to be sustainable. 3 Measures have been put in place to monitor process performance. 4 Documentation has been updated (pFMEA, Control Plan, SOPs). 5 Training has been performed for the new process. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 9 Controller signed that project savings / benefits have been achieved.

26