Presentation is loading. Please wait.

Presentation is loading. Please wait.

Practical Assessment Project Template

Similar presentations


Presentation on theme: "Practical Assessment Project Template"— Presentation transcript:

1 Practical Assessment Project Template
Project title: <title of the project> Organization: <name of your organization> Project leader: <your name> Belt level: <Black or Green Belt> Revision date: <e.g >

2 DMAIC Introduction for this template
Objectives of this presentation: Certification by LSSA Project summary for your organization Guidelines: Methodology and logic understandable, for a Lean Six Sigma trained external colleague Clear conclusions on each sheet Target for certification is max. 25 sheets (no limit for internal use) No back-up sheets Delete the (Italic) notes for the user, upon need Delete this slide before handing in.

3 DMAIC Process improvement roadmap
DMAIC roadmap Define 1 Define and Scope project 2 Define defect and CTQs 3 Plan and document project Measure 4 Evaluate measurement system 5 Establish baseline 6 Set improvement goals Analyze 7 Map process and identify inputs 8 Isolate key inputs 9 Develop Y=f(X) function Improve 10 Determine optimum settings 11 Implement proposed improvement 12 Validate proposed improvement Control 13 Implement control strategy 14 Close out project

4 DEFINE 1 – Define and scope project
Problem Description: What is wrong, how does it affect the customer, what is the pain for the organization? Is it a priority, so in line with top-down priorities? Add picture or drawing to explain (If ready, delete this textbox) Objectives: What do we want to achieve? Helicopter view description. (delete this textbox)

5 DEFINE 1 – Define and scope project
Target: Describe the quantified, measurable result (not the solution!). What is the required timing? In Scope What are the boundaries of the process to analyze; what are you allowed to change? Out of Scope: What not ? Deliverables: What evidence to put at the table to show that targets metrics are met? This is the key element in the agreement with the champion Hard Benefits: Summarize the calculation to shows that this is a ‘major cost saving or cost avoidance, in keuro/year. Upon need add a separate sheet Soft Benefits: Any nice additional benefits, like customer satisfaction, learning Lean Six Sigma

6 DEFINE 2 - Define defects and CTQs
Start from customer perspective ‘OK for customer’ Customer specification Internal specification This can be a vague description of the critical variable VOC Variable: ……… Target: ………… Specifications: …… CTQ ext Describe the measurable variable and specifications as required by the customer. Variable: ……… Target: …… Specifications: ………… Describe the measurable variable and specifications as defined in own organization. Can be different from the CTQext, but must have a known/proven relation with CTQext. CTQ int High level, describe until highest level measurable CTQ int. (the project target) Legend: solid line: proven relation dotted line: relation tbd. grey box: out of scope white box: potential CTQ, or group of CTQs

7 DEFINE 3 – Plan and document project
Project Team Supplier: Champion: User: MBB: who provides resources driving for success will benefit from the results coach for methodology Project leader (Belt): Actively involved members in team meetings Name: Role: Responsibility:

8 DEFINE 3 – Plan and document project
SIPOC is mandatory for process improvement For design improvement: visualize product problem area SIPOC Process Map Supplier: Inputs: Process: Outputs: Customers: ‘Process’ Controllable variables + specs Output variables Main noises Standard Operating Procedures If helpful show below detailed steps on the process Step 1 Step 2 Step 3 Step 4 Step 5

9 Self Assessment LSSA Assessor Feedback
DEFINE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Define 1 Project addresses a clear problem or business opportunity (20k€ / 50k€ p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been defined clearly. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been identified. 7 Relevant KPI's have been selected / CTQ-flowdown has been constructed. 8 High level process description has been made (e.g. SIPOC). Missing Incorrect Correct N/A Define 1 Project addresses a clear problem or business opportunity (20k€ / 50k€ p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been defined clearly. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been identified. 7 Relevant KPI's have been selected / CTQ-flowdown has been constructed. 8 High level process description has been made (e.g. SIPOC).

10 MEASURE 4 – Evaluate measurement system
For Target internal CTQs Evaluate whether measurement error for the CTQ int, described in the target is good enough for this project. e.g. reference data, GR&R, bias, attribute agreement, etc. Measurement error CTQ int Conclusion:

11 MEASURE 5 – Establish baseline
How is the situation on the CTQs in the beginning of the project? (measured with the known error) e.g. results of capability & performance study If historical measurement error is unknown, add a note. Visualize if possible, for instance in time. Conclusion:

12 MEASURE 6 – Set improvement goals
Final Target Evaluate whether the original target(s) are realistic. If necessary describe the rational why the targets are being adjusted. Conclusion:

13 Self Assessment LSSA Assessor Feedback
MEASURE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Measure 1 Data has been collected / selected properly. 2 The collected data has been proven to be representative for the project. 3 Quality of the data has been verified in an appropriate way (GR&R if applicable). 4 Historical data has been used to visualize performance over time (e.g. Time series). 5 Variation in the process has been considered (common cause or special cause). 6 Short term versus long term performance has been considered. 7 Performance against requirements has been checked (Ppk if applicable). Missing Incorrect Correct N/A Measure 1 Data has been collected / selected properly. 2 The collected data has been proven to be representative for the project. 3 Quality of the data has been verified in an appropriate way (GR&R if applicable). 4 Historical data has been used to visualize performance over time (e.g. Time series). 5 Variation in the process has been considered (common cause or special cause). 6 Short term versus long term performance has been considered. 7 Performance against requirements has been checked (Ppk if applicable).

14 ANALYZE 7 – Map process and identify inputs
Process Map Input variable 1 Input variable 2 Use this format for process improvement (in case of Lean project use a VSM) For design improvement use Boundary Diagram or Parameter Diagram, for the applicable function(s) (process step 1) Input variable 1 Input variable 2 …. Input variable 1 Input variable 2 …. Input variable 1 Input variable 2 (process step x) Output variable 1 Output variable 2 Output variable 3 These should be the CTQs Conclusion:

15 ANALYZE 7 - Map process and identify inputs
Create this diagram to complete and categorize the list of inputs Ishikawa Diagram Measurement Machine Men Defect Methods Environment Materials Conclusion:

16 ANALYZE 8 – Isolate key inputs
If a large number of inputs is identified, it is important to limit the analysis to a small set of important (key)inputs. Tools include: Cause & effect matrix, screening (DOE), FMEA Conclusion:

17 ANALYZE 9 – Develop Y=f(X) function
Tools: Anova, Regression, DOE, simulation, etc Conclusion:

18 Self Assessment LSSA Assessor Feedback
ANALYZE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential root causes have been identified properly. 3 Data has been collected and analyzed correctly. 4 Graphical and statistical techniques have been applied to investigate root causes. 5 Major root causes have been identified. 6 Conclusions have demonstrated strong evidence / statistically valid. Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential root causes have been identified properly. 3 Data has been collected and analyzed correctly. 4 Graphical and statistical techniques have been applied to investigate root causes. 5 Major root causes have been identified. 6 Conclusions have demonstrated strong evidence / statistically valid.

19 IMPROVE 10 – Determine optimum settings
DOE, simulation, etc Conclusion:

20 IMPROVE 11 – Implement proposed improvement
Show a list of implemented improvements Conclusion:

21 IMPROVE 12 – Validate proposed improvement
Show the verification run compared to baseline that the Define conditions will be met. Conclusion:

22 Self Assessment LSSA Assessor Feedback
IMPROVE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome / Risks have been mitigated. 4 Internal and external customers have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable). Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome / Risks have been mitigated. 4 Internal and external customers have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable).

23 CONTROL 13 – Implement control strategy
Open actions …. Documentation Component drawings Manufacturing specifications Control plan Engineering reports FMEA .. Roles & responsibilities Actions and owners necessary to finish this project How is assured that all information is well documented for future success What are the key roles & responsibilities to assure continued success

24 CONTROL 14 – Close out project
Conclusions …. Recommendations Lessons learned Relate this to the project objective, targets and deliverables For follow-up, next steps, or next projects For colleagues, others

25 CONTROL 14 – Close out project
The realized benefits of this projects are: Summarize final total savings, average per year Champion: Date, Name & Signature - Controller: Date, Name & Signature - LSSA Assessor: Date, Name & Signature -

26 Self Assessment LSSA Assessor Feedback
CONTROL Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' available and sufficient. 2 Measures have been put in place to monitor process performance. 3 Documentation has been updated (pFMEA, CP, SOPs). 4 Training has been performed for the new process. 5 Improvements have proven to be sustainable. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 8 Controller signed that project savings/benefits have been achieved. 9 Belt has shown to be able to manage the project adequately. 10 Project has been completed within time and budget. Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' available and sufficient. 2 Measures have been put in place to monitor process performance. 3 Documentation has been updated (pFMEA, CP, SOPs). 4 Training has been performed for the new process. 5 Improvements have proven to be sustainable. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 8 Controller signed that project savings / benefits have been achieved. 9 Belt has shown to be able to manage the project adequately. 10 Project has been completed within time and budget.

27


Download ppt "Practical Assessment Project Template"

Similar presentations


Ads by Google