LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.

Slides:



Advertisements
Similar presentations
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Advertisements

Pt5 - RadWG meeting Presenting a concept Prepared by M Gastal & S Maridor
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
J AN F EB M AR A PR M AY J UNE J UL A UG S EP O CT N OV D EC honey flow adequate foraging bees V Destructor control 1 st 2 nd /3 rd 4 th Prime Swarm.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Technical Support Activities in PH-ADO-PO
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
K. Foraz, S. Prodon TS-IC TS workshop – May 2005 Underground logistics K. Foraz, S. Prodon TS-IC.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
LHCf collaboration meeting, Nagoya, January 2009A. L. Perrot LHC news A. L. Perrot CERN, EN/MEF-LE LHCf collaboration meeting, Catania, 6 th July 2009.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
11 th January 2012 Thanks to everyone who gave me transparencies.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
Status, Schedule and EVM for the test facility project
Identification of the unused cables
VENTILATION OF AD TARGET Kick off meeting
TE-MPE LS1 review Vision from EN-EL(CF)
CMS Area Working Group Meeting
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
Special LS1 day on 12 June 2012, EDMS:
LHC Civil Engineering Activities for YETS – LS2
SPS activities during LS2 TE-EPC (Power Converter Group)
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Review of UJ56 relocation options
All Wales Safeguarding Procedures Review Project
Collimator Control (SEUs & R2E Outlook)
Hopewell Valley Regional School District
Radiological and Environmental Monitoring System (REMS)
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
Bunker Project Schedule/Budget
Presentation transcript:

LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN

A. L. Perrot, EN-MEF2 Shielding activities Orders Storage areas - All orders (bars and blocks) = launched; - Delivery end of June/beginning of July - 10 th May: visit to Bulgarian firm by M.Lazzaroni (442 blocks) - Building 157: roof upgrade finished by the end of June - Start studying /defining temporary surface storage areas for LS1 Walls design/implementation - US85 mobile shielding: call for tender launched last month by EN/HE

A. L. Perrot, EN-MEF3 Integration -Point 7 Almost finished Fire resistant racks instead of safe room Remaining issue to be studied: installation of the fire resistant racks. -Approvals TZ76: End of May UJ76: end of June - If no new issue in Point 7, by the end of June all R2E integration studies finished - In July: start process of the installation drawings production Status

A. L. Perrot, EN-MEF4 LS1 R2E activities schedule S 12 P1P1 S 23 P2P2 S 34 P3P3 S 45 P4P4 S 56 P5P5 S 67 P6P6 S 78 P7P7 S 81 P8P8 N ov. D ec. J an. F eb. M ar. A pr. M ay J un. J ul. A ug. S ep. O ct. N ov. D ec. J an. F eb. M ar. A pr. M ay J un PT Cool-down Powering Tests Warm-up Splices Cool-down Powering Tests Splices Warm-upPreparation for cool-down Cool-down R2E P1 = 57 weeks P5 = 56 weeks EL & CE activities in 2 shifts / day P7 = 50 weeks (to be finalised) P8 = 24 weeks Lot of activities already anticipated

A. L. Perrot, EN-MEF5 Planning Status For all points: All sequences identified Several iterations performed for each point 8th iteration for Point 7 carried out this week All planning studies = available on MEF website Presentation by M. Barberan on 10 th May to the LS1 organisation meeting Planning session (half day) 8 th June with all services and equipments owners End of June the R2E planning will be finished and merged into LHC LS1 planning

CMS 2 nd TC Workshop, May 2012A. L. Perrot, EN-MEF/LE6 EN/MEF- R2E Web Site /R2E_home/Home.aspx

A. L. Perrot, EN-MEF7 Preparation towards LS1 ECRs - Point 5 under approval: deadline 24 th May - Point 1: under progress (should be submitted to R2E colleagues within 15 days) - Point 7: goal = submitted to R2E colleagues by the end of June Services Last review of the Ethernet /wifi requests: deadline 14 th May. Cables session on 1rst June with EN/EL and all equipment owners Point 1: under progress (should be submitted to R2E colleagues within 15 days) Point 7: goal = submitted to R2E colleagues by the end of June Civil Engineering - Calls for tender for UL557 safe room & TZ76 wall dismantling = ready (to be launched very soon) - CE survey of UL557 ground floor scheduled for TS2

A. L. Perrot, EN-MEF8 Material delivery & storage areas Preparation towards LS1 Starting in June - Follow the equipment delivery process - Review the equipment to be temporary stored for the relocation/ shielding - Define the space/volume needed - Contact with EN/MEF-COL Goal: by end of September all R2E storage spaces= defined/identified In situ supervisor/ coordinators - Today 3 (4) collaborators are identified - Start collaboration in September for the R2E Friday meetings - TS3 & TS4: visits in situ Documentation In July start the documentation/procedures required for installation