VENTILATION OF AD TARGET Kick off meeting

Similar presentations


Presentation on theme: "VENTILATION OF AD TARGET Kick off meeting"— Presentation transcript:

1 VENTILATION OF AD TARGET Kick off meeting
VENTILATION OF AD TARGET Kick off meeting A.BROCHE – EN/CV

2 Content Integration Current status of the project
Milestones and timing Activities requiring coordination with other groups (type of activity and timing) 4th September 2017

3 Integration Surface 90% complete AHU b.823 to be included
CV control room: Modify cable tray position Add air-conditioning units and pumps cubicles 4th September 2017

4 Integration Underground
4th September 2017

5 Sump pump TT6 in Study Work: 1 new power cubicle in new b.196
In TT6 In b.196 Work: 1 new power cubicle in new b.196 1 control box underground Temporary solution in 2019 (power and pipe) New piping at the top New pumps ? ? Not present in CE model 4th September 2017

6 AD target sump pump in Study
Work: 1 new power cubicle in new b.196 1 control box underground No temporary solution in 2019 Any communication required with control room? New pump? 4th September 2017

7 Current status of the project
Ventilation Waiting for requirements of the access control Tender Specification for construction to be written Sump pumps TT6 and AD target Both in Study. Dismantling of demineralised water cooling b.195 No study required. Procurement strategy for dismantling b.196 and b.195 and sump pumps to be discussed 4th September 2017

8 Milestones and timing 2017 2018 2019 2020 Invitation to tender and finance committee AHUs and cubicles Construction Relocation of sump pump TT6 New AD target pump B.195 cooling TS ventilation Market Survey Temporary sump pump TT6 Ventilation Sump pump Dismantling 4th September 2017

9 Activities requiring coordination with other groups
EN-STI Requirements for sump pump AD target BE-ICS Requirements for control access EN-EL Temporary supply to sump pump TT6. Cables to CV supervision SMB Integration up to date, in particular sumps in tunnel TT6 Discussion regarding the rain water connexion in b.196 during work ? Integration of equipment in tunnel 823 4th September 2017

10 Thank you. Any question ?